03/06/2026 | Press release | Distributed by Public on 03/06/2026 16:19
San Mateo County ― Caltrans is continuing work on the State Route 82El Camino Real Roadway Renewal project which will include a daytime full closure for tree removals and lane closures for potholing work. Potholing is the process of identifying utilities under the roadway to visually verify the exact depth and type of utilities present to avoid damage before the road paving work begins.
The $173M El Camino Real roadway rehabilitation project will maintain El Camino Real as a safe, accessible, and reliable transportation corridor. The project encompasses repaving the road and upgrading sidewalks for enhanced mobility. It also aims to reduce localized flooding and to improve visibility.
Full closuresare scheduled from 9 a.m. to 6 p.m. each weekday:
Carmelita Ave. to Grove Ave.
Oak Grove Ave. to Carmelita Ave.
Lane closuresare scheduled from 8 a.m. to 5 p.m. each week weekday.
Rosedale Ave. to Millbrae Ave.
Santa Inez Ave. to Peninsula Ave.
Detour: Carmelita to Grove
Driving north on El Camino Real, turn right on Carmelita, left on California, left on Grove, and right on El Camino Real.
Driving south on El Camino Real, turn left on Grove, right on California, right on Carmelita, and left on El Camino Real.
Detour: Oak Grove to Carmelita
Driving north on El Camino Real, turn right on Oak Grove, left on California, left on Carmelita, and right on El Camino Real.
Driving south on El Camino Real, turn left on Carmelita, right on California, right on Oak Grove , and left on El Camino Real.
Thank you for your patience as we work to maintain this vital thorough fare.
For 24/7 traffic updates, please visit 511.org: https://x.com/511SFBay
For real-time information, visit Caltrans QuickMap: https://quickmap.dot.ca.gov
Follow us on X: https://x.com/CaltransD4
Or call 1-800-472-7623, 1-800-427-ROAD for state highway conditions statewide.
| CleanCA.com | CleanWaterCA | #BeWorkZoneAlert | X | Facebook | YouTube |
###