City of Green Bay, WI

08/22/2025 | Press release | Distributed by Public on 08/21/2025 23:00

Temporary Lane Closures and Change of Operating Schedule of the Ray Nitschke Memorial Bridge

The City of Green Bay's Department of Public Works is announcing a temporary change to the drawbridge operating schedule of the Ray Nitschke Memorial Bridge (Dousman and Main Streets) for maintenance activities from August 26, 2025, through August 29, 2025. Motorists shall be advised the bridge will remain open to vehicular traffic with single-lane closures occurring during this timeframe, which may cause back-ups. Mariners shall provide a two-hour advance notice for bridge operation directly to the Bridgetender from 7:00 a.m. to 10:00 p.m. daily. Vessels able to pass under the bridge may do so at any time.

Vessel Impacts

Ray Nitschke Memorial Bridge at Mile 1.58, over the Fox River at Green Bay, Wisconsin

Provide a two-hour advanced notice for bridge operation directly to the Bridgetender.

Traffic Impacts

Ray Nitschke Memorial Bridge (Dousman Street and Main Street over the Fox River)

Single-lane closures in each direction along Main Street will occur from North Broadway to North Washington Street.

Detour

No detour will be posted.

Access to residences and businesses will be maintained. All lane and work operations are weather-dependent and subject to change. Motorists should anticipate back-ups, use caution while driving through the work zone, and are encouraged to find alternate routes.

City of Green Bay, WI published this content on August 22, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on August 22, 2025 at 05:00 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]