Centrus Energy Corp.

02/11/2026 | Press release | Distributed by Public on 02/11/2026 06:27

Annual Report for Fiscal Year Ending December 31, 2025 (Form 10-K)

Management's Discussion and Analysis of Financial Condition and Results of Operations
The following discussion should be read in conjunction with, and is qualified in its entirety by reference to, the Consolidated Financial Statements and related notes appearing elsewhere in this report.
This discussion contains forward-looking statements that involve risks and uncertainties. Actual results could differ significantly from the results discussed in the forward-looking statements particularly in light of the economic, social and market uncertainty created by, among other things, the war in Ukraine. See "Forward-Looking Statements" at the beginning of this Annual Report on Form 10-K.
Overview
Centrus Energy Corp., a Delaware corporation, is a trusted supplier of nuclear fuel components for the nuclear power industry, which provides a reliable source of carbon-free energy and provides enrichment and technical services for public and private customers. References to "Centrus", the "Company", "our", or "we" include Centrus Energy Corp. and its wholly-owned subsidiaries as well as the predecessor to Centrus, unless the context indicates otherwise.
Centrus operates two business segments: (a) LEU, which supplies various components of nuclear fuel to commercial customers from our global network of suppliers, and (b) Technical Solutions, which provides advanced uranium enrichment for the nuclear industry and the U.S. government and advanced manufacturing and other technical services to government and private sector customers.
Published spot price indicators for SWU reached historic highs in April 2009 at $163 per SWU. In the years following the 2011 Fukushima accident in Japan, spot prices declined more than 75%, bottoming out in August 2018 at $34 per SWU. This was followed by a period of price increases, which reached $195 per SWU by December 31, 2024. In 2025, spot prices continued to increase, reaching $200 per SWU by December 31, 2025, which surpasses the previous historic high. This represents an increase of 3% since the beginning of the year and 488% over the 2018 historic low. This surge in the SWU spot price beginning in 2022 has been driven primarily by uncertainty created as a result of Russia's invasion of Ukraine, coupled with growing interest in nuclear power as a source of secure and carbon-free energy. The contemplation of the imposition of tariffs on LEU, if ultimately imposed, may put additional upward pressure on the price of SWU. For further details, refer to Part I, Item 1A, Risk Factors - The current war in Ukraine and related international or U.S. sanctions, tariffs and restrictions on trade, and the Russian response thereto, could have a material adverse impact on our business, results of operations, and financial condition.
When Russian supply is included, the uranium enrichment segment of the global nuclear fuel market is oversupplied, but without Russian supply, the global market for uranium enrichment would be undersupplied. Further, it is not clear that there are sufficient inventories of enriched uranium in the United States to compensate for a loss of Russian supply, absent new capacity that will take a number of years to deploy.
Changes in the supply-demand balance and in the competitive landscape arising from the war in Ukraine or the imposition of tariffs may affect pricing trends, change customer spending patterns, and create uncertainty in the uranium market. At the same time, uncertainty remains about future demand for nuclear power generation. To address such changes and uncertainty, we continue to evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.
The Company's work on HALEU began under the HALEU Demonstration Contract, executed with the DOE in 2019, to construct a cascade of 16 AC100M centrifuges in Piketon, Ohio to demonstrate HALEU production. The DOE has funded the HALEU Demonstration Contract up to $173.0 million with a period of performance that ended November 30, 2022.
On November 10, 2022, the DOE awarded the HALEU Operation Contract to the Company with a base contract value of approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF6. On November 7, 2023, the Company made its first contractual delivery of HALEU to the DOE, completing Phase 1 of the HALEU Operation Contract.
During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract, which included production of 900 kilograms of HALEU UF6for one production year, as well as continued operations and maintenance of the cascade. Phase 2 included an initial contract value of approximately $90.0 million and compensation on a cost-plus-incentive-fee-basis. The DOE owns the HALEU produced from the demonstration cascade. The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE's sole discretion and subject to the availability of Congressional appropriations. Pursuant to an amendment to the Company's lease for the Piketon facility, the DOE assumed all D&D liabilities arising out of the HALEU Operation Contract.
Under the HALEU Operation Contract, DOE is contractually obligated to provide the 5B Cylinders necessary to collect the output of the cascade, but supply chain challenges created difficulties for DOE in securing enough 5B Cylinders for the entire Phase 2 production year. During time periods when 5B Cylinders were insufficient, the Company was not able to produce HALEU as it did not have 5B Cylinders to store the enriched uranium. Due to these delays, Centrus was unable to achieve contractual delivery of the 900 kilograms of HALEU UF6by November 2024, which was the date set for the end of Phase 2 performance. On November 5, 2024, the HALEU Operation Contract was modified to extend the Phase 2 period of performance to June 30, 2025, which allowed the Company to produce and contractually deliver the Phase 2 production target of 900 kilograms of HALEU UF6to DOE. The DOE further extended the Phase 2 period of performance through January 31, 2026, to allow the Company to complete outstanding change orders. As of December 31, 2025, the total Phase 2 contract value and funded value is $170.1 million. The fee for the Phase 2 period of performance that was extended beyond November 30, 2024 was not definitized and is subject to negotiation.
On June 17, 2025, the DOE amended the HALEU Operation Contract to divide the first three-year option period into a first option period of one year ("Option 1a") and a second option period of two years ("Option 1b"). The amendment established a target cost and fee for Option 1a of approximately $99.3 million and $8.7 million, respectively, and a target cost and fee for Option 1b of $163.5 million and $15.2 million, respectively. The DOE exercised Option 1a and extended the period of performance to June 30, 2026. As of December 31, 2025, Option 1a is funded for the contract value of $108.2 million. Additionally, the amendment acknowledged that the estimated cost associated with Option 1b is insufficient to support full performance due to known cost increases since the award of the HALEU Operation Contract and indicated that the Company will need to submit a revised cost proposal for review and negotiation prior to DOE's consideration of Option 1b.
Under the HALEU Operation Contract, the Company has submitted several change order requests for work being performed on infrastructure, facility repairs, and 5B Cylinders. The additional work is being performed under the DOE contracting officer's approval or contract modifications. On September 28, 2023, the DOE modified the HALEU Operation Contract to incorporate additional scope for infrastructure and facility repairs, and costs associated with 5B Cylinder refurbishment, for an estimated additional contract value of $5.8 million, without a cost-share provision. As of December 31, 2025, DOE was obligated for costs up to the contract value of $8.8 million for the additional scope work. The DOE modified the HALEU Operation Contract and increased funding in January 2026 and is now obligated for costs up to the current contract value of $9.7 million. For further details refer to Part I, Item 1,Business - Technical Solutions - Government Contracting.
The DOE continues to pursue the availability of HALEU for the ARDP and for the advanced reactor market and the availability of domestically enriched uranium in a quantity that would be sufficient to address a supply disruption and gaps in domestic production and enrichment. Congress appropriated a total of approximately $3.4 billion to the DOE to jumpstart U.S. nuclear fuel production, including both LEU and HALEU enrichment. Based on this funding, the DOE issued a series of three RFPs covering HALEU production, HALEU deconversion, and LEU production. In late 2024, the DOE made initial selections under each of the RFPs. Centrus was among the awardees for all three RFPs under IDIQ structures (the HALEU Deconversion Contract, HALEU Production Contract, and the LEU Production Contract.
Each of these IDIQ awards carries a $2.0 million contract minimum for each awardee and is subject to an overall contract ceiling covering all awardees. Under the IDIQ awards, the DOE can issue task orders to the awardees and then allocate available funding to those task orders. The ultimate value of the awards to Centrus, and the scale of the expansion supported, will depend upon the scope of task orders that DOE may subsequently issue to Centrus under the contracts for which the Company intends to compete. There is no assurance that we will be awarded any additional task orders under any of our contracts and, if awarded, the nature, timing and amount of the task orders that may be issued under any award.
On November 6, 2024, DOE issued requests for task order proposals under each of the HALEU Production Contract and the HALEU Deconversion Contract for respective optimization studies to support DOE in establishing the commercial production of HALEU and commercial deconversion of HALEU. On January 9, 2025, we submitted our proposals in response to these requests for task order proposals. On August 14, 2025, DOE, without making any awards under the first task order proposal request, issued a second request for task order proposals under the HALEU Production Contract. The second request provided $900.0 million to support the deployment of commercial HALEU enrichment capacity. On January 5, 2026, the DOE announced that ACO was selected for award of a $900.0 million task order to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of HALEU. The award also includes options, at the DOE's discretion, for up to $170.0 million to produce and deliver HALEU to the DOE. The task order is subject to negotiation of a definitive agreement and there are no guarantees about whether or when funding by the DOE for such expansion would be awarded or whether we will successfully perform any awarded contract.
On March 30, 2025, the Company submitted its proposal in response to a request for task order proposals from the DOE for a report and additional deliverables under the LEU Production Contract. On April 11, 2025, the Company was awarded a time and materials task order with a total award ceiling of approximately $0.5 million.
On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and expansion of its manufacturing capacity at its facility in Oak Ridge, Tennessee. Additionally, the Company is investing an additional $60.0 million over an 18 month period lays the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio. This was followed with an announcement on January 23, 2026 that the Company plans to invest more than $560.0 million over the next several years to transition the facility to a high-rate manufacturing plant and support the production of thousands of advanced centrifuges in Oak Ridge, Tennessee. The first new centrifuges produced in Oak Ridge are expected to come online in Ohio in 2029.
On September 25, 2025, Centrus announced plans for a major expansion of its uranium capacity in Piketon, Ohio, including plans for large-scale production of both LEU and HALEU to meet commercial and government requirements. In December 2025, the Company initiated design work on a 150,000 square foot training, operations and maintenance Facility in Piketon, Ohio - a critical piece of site infrastructure necessary to support the company's plans for a major expansion of its uranium enrichment capacity in Piketon. The project involves a significant renovation and rehabilitation of an existing, largely vacant building on the site of the American Centrifuge Plant, with construction activities set to begin early 2026. The facility is expected to include a mix of office space, training facilities, and maintenance bays to support plant operations. Also in December 2025, the Company began domestic centrifuge manufacturing to support commercial LEU enrichment activities at its Piketon, Ohio, facility. This strategic move enables the Company to capitalize on its many first-mover advantages in U.S.-owned domestic uranium enrichment, and marks one of the most consequential transformations in the Company's and the United States' uranium enrichment history. Centrus plans to leverage its multi-billion-dollar uranium enrichment expansion to meet its growing backlog of $2.3 billion in contingent LEU sales to U.S. and international customer contracts, and targets future commercial-scale production of HALEU, as well. There is no assurance that we will successfully complete our announced expansion of our uranium capacity in Piketon, Ohio, or execute plans for large-scale production of both LEU and HALEU to meet commercial and government requirements. For further details, see Part 1, Item 1, Business - Low Enriched Uranium - LEU Backlog and Technical Solutions - Technical Solutions Backlog.
On February 9, 2026, ACO entered into an engineering, procurement and construction contract with Fluor Federal Services, Inc. ("Fluor"), a third-party contractor, for the commercial expansion and deployment of LEU and HALEU production capability at the American Centrifuge Plant (ACP) in Piketon, Ohio. The contract provides for compensation on a time and materials basis at agreed labor rates and extends until the completion of performance.
Under the contract, Fluor's services will include design, engineering, procurement, construction and construction management, and related services to support full commercial HALEU and LEU operations. Fluor will be paid a reimbursable amount for all costs incurred in connection with the relevant work (such as labor, equipment, materials, and other direct costs), plus other agreed upon margins. ACO will fund the services by establishing a zero-balance and escrow general disbursement account that will be administered in accordance with agreed-upon procedures. ACO will authorize funds incrementally in accordance with stage gates and Fluor's performance is limited by the authorized funding. The Company has not incurred any costs under the contract and has not deposited any funds into the escrow account. The total price paid to the Contractor will depend on the scope of the services authorized by the ACO, in accordance with the terms of the contract.
The contract may be terminated or suspended by ACO or Fluor for cause, or by ACO for convenience, in which case Fluor is entitled to compensation for services and any applicable fee provided through termination. In the event of cancellation by ACO for reasons other than default, Fluor is also entitled to a cancellation fee in the initial amount of $24.0 million on the contract effective date, subsequently decreasing by $2.0 million per month until reaching $0.
The Qualifying Advanced Energy Project Credit ("§48C") was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The §48C program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the Internal Revenue Service ("IRS") granted our request for a $62.4 million credit allocation for this facility. Centrus has two years from that date to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation. It is uncertain how Executive Order 14154 will impact the IRS determination regarding our application request. For further details refer to Part II, Item 7, Liquidity and Capital Resourcesin this Annual Report on Form 10-K.
On November 7, 2024, the Company issued 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. On August 18, 2025, the Company issued 0% Convertible Notes with an aggregate principal amount of $805.0 million, due August 15, 2032, unless earlier repurchased, redeemed or converted. The proceeds from both the 2.25% Convertible Notes and the 0% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes. The 2.25% Convertible Notes bear interest at an annual rate of 2.25%, payable semi-annually in arrears on May 1 and November 1, of each year, beginning on May 1, 2025. There are no required principal payments prior to the maturity of the 0% Convertible Notes or the 2.25% Convertible Notes.
Pursuant to a notice of redemption issued on February 24, 2025, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the $74.3 million aggregate principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million related to the extinguishment of the long-term debt.
On June 30, September 30, and December 31, 2025, the Company provided notice to holders of the 2.25% Convertible Notes that the notes became convertible at the option of the holders beginning on the first day of the respective subsequent quarter, and ending at the close of business on the last day of said quarter. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of each of the three calendar quarters, was greater than 130% of the conversion price in effect on each applicable trading day.
For further details on our notes refer to Part II, Item 7, Liquidity and Capital Resources.
The war in Ukraine, along with Import Ban Act and the Russian Decree, have contributed to a significant increase in market prices for enrichment and prompted calls for public and private investment in new, domestic uranium enrichment capacity not only for HALEU production but also for LEU production to support the existing fleet of reactors. As a result, coupled with the Company's contract awards for HALEU and LEU production, Centrus is exploring the opportunity to deploy LEU enrichment alongside HALEU enrichment to meet a range of commercial and U.S. government requirements, which would bring cost synergies while increasing revenue opportunities. Our ability to deploy LEU and/or HALEU enrichment, and the timing, sequencing, and scale of those capabilities, is subject to the availability of funding and/or offtake commitments.
The Energy Act of 2020 ("Energy Act") requires the DOE to establish a program to support the availability of HALEU for civilian domestic research, development, demonstration, and commercial use. The Energy Act also reauthorized DOE nuclear energy research, development, demonstration, and commercial application activities, including advanced fuel, research and development for advanced reactors, used fuel technologies, and integration of nuclear energy systems for both existing plants and advanced nuclear concepts. It also authorized the funding of an ARDP which was launched by the DOE in May 2020. There are a number of advanced reactors under development that would use HALEU. Nine of the ten advanced reactor designs selected by the DOE for its ARDP will require HALEU. Various agencies of the U.S. government, including the U.S. Department of Defense, the Defense Advanced Research Projects Agency, and the DOE are building small modular reactors and microreactors, which demonstrates the focus on both the development of microreactors and the ultimate need for HALEU. We believe our investments in advanced enrichment technology and our progress in demonstrating HALEU production will position the Company to meet the needs of government and commercial customers in the future as they deploy advanced reactors and next generation fuels and also offers potential cost synergies for a return to LEU production. Further, the Company is taking steps to pursue, including through the exploration of strategic partnerships, technologies that are complementary to HALEU production and critical to the HALEU ecosystem, including deconversion and fuel fabrication.
While the monthly price indicators have increased for several years, the uranium enrichment segment of the nuclear fuel market remains oversupplied and faces uncertainty about future demand for nuclear power generation. However, without Russian supply, the global market would be undersupplied for uranium enrichment. Recent data from the International Trade Commission shows a significant increase in the importation of enriched uranium into the U.S. from China beginning in 2023. If this trend continues, it will likely result in significant changes in the competitive landscape that will affect pricing trends, affect customer spending patterns, create uncertainty and likely have a negative impact on our business. To address these changes, we have taken steps to adjust our cost structure; we may seek further adjustments to our cost structure and operations and evaluate opportunities to grow our business organically or through acquisitions and other strategic transactions.
We are also actively considering, and expect to consider potential strategic transactions from time to time, which could involve, without limitation, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products or technologies, or changes to our capital structure. In connection with any such transaction, we may seek additional debt or equity financing, contribute or dispose of assets, assume additional indebtedness, or partner with other parties to consummate a transaction.
Refer to Part I, Item 1 - Business, for additional information.
Market Conditions and Outlook
The global nuclear industry outlook began to improve after many years of decline and stagnation. The development of advanced small and large-scale reactors, the innovation of advanced fuel types, and the commitment of nations to begin deploying nuclear power or to increase the share of nuclear power in their nations has created optimism in the market. Part of the momentum has resulted from efforts to lower greenhouse gas emissions to combat climate change and improve health and safety.
According to the WNA, as of January 2026, there were approximately 70 reactors under construction worldwide, approximately one-half of which are in China. The United States, with over 90 operating reactors, remains the world's largest market for nuclear fuel. The nuclear industry in the United States, Japan, and Europe faces headwinds as well as opportunities. In the United States, the industry has been under pressure from the expansion of subsidized renewable energy as well as relatively low-cost natural gas resources in recent years. Eight U.S. reactors have prematurely shut down in the past ten years and others could shut down in the next few years. At the same time, construction was completed and commercial operations began in the second quarter of 2024 on one large reactor and two formerly shutdown reactors have plans to restart.
The IEA projects that global nuclear energy generation will grow substantially in the next three decades. In the IEA's 2025 World Energy Outlook, nuclear generation is forecasted to grow 38% by 2035 and 62% by 2040 under the "Stated Policies" scenario. In the "Net Zero Emissions by 2050" scenario, nuclear generation would grow 70% by 2035 and more than double by 2040.
As a consequence of the March 2011 earthquake and tsunami in Japan, over 60 reactors in Japan and Germany were taken offline, and other countries curtailed or slowed their construction of new reactors or accelerated the retirement of existing plants. In Japan, 15 reactors have restarted and an additional 10reactors are in the process of restart approval. As a result of the war in Ukraine, the EU is encouraging its member countries to reconsider the planned early retirement of existing plants in order to reduce reliance on Russian gas imports.
In October 2020, the DOC reached an agreement with the Russian Federation on an extension of the RSA, a trade agreement which allows for Russian-origin nuclear fuel to be exported to the United States in limited quantities. The two parties agreed to extend the agreement through 2040 and to set aside a significant portion of the annual quota for Centrus' shipments to the United States through 2028 to execute our long-term TENEX Supply Contract with TENEX. This outcome allows for sufficient quota for Centrus to continue serving its utility customers and support its investments in building new capacity. Use of this quota is subject to compliance with limitations under the RSA. These limitations include a requirement that we return natural uranium to TENEX for the LEU we receive under the TENEX Supply Contract at approximately the same time that we deliver the LEU to our customers. Our ability to meet this requirement depends on the capacity or willingness of the facilities where natural uranium is supplied to us by customers, to allow us to deliver this natural uranium to TENEX. We were notified by one facility that it will no longer receive natural uranium for TENEX. As a result, we will need to rely to a greater extent on deliveries at other processors or explore other options in order to comply with the RSA's natural uranium delivery requirement.
The war in Ukraine has escalated tensions between Russia and the international community. As a result, the United States and other countries imposed, including through the U.S.'s enactment of the Import Ban Act discussed below, and may continue imposing, additional sanctions, tariffs, and export controls against certain Russian products, services, organizations and/or individuals, and Russia passed the Russian Decree as discussed below. Such additional restrictions, and any Russian response thereto, could affect our ability to purchase, take delivery of, transport, or re-sell Russian uranium enrichment, engage in transactions with TENEX, or implement the TENEX Supply Contract, which would have a negative material impact on our business. Further, tariffs or sanctions by the United States, Russia or other countries may impact our ability and the cost to transport, export, import, take delivery, or make payments related to the LEU we purchase and may require us to increase purchases from non-Russian sources to the extent available. For example, due to restrictions imposed by Canada on the ability of Canadian persons and entities to provide ocean transportation services to Russia, a permit is required for our shipper, a Canadian company, to transport the LEU that we procure under the TENEX Supply Contract to the United States. A Canadian permit issued to our shipper was extended to March 2027, but for so long as the sanctions remain in place, the shipper will require further extensions beyond the expiration of the permit for continued shipments of LEU imports.
In response to the war in Ukraine, on May 13, 2024, the Import Ban Act was enacted. This law bans imports of LEU from Russia into the U.S. beginning August 11, 2024, subject to issuance of waivers by the DOE. In accordance with the instructions published by the DOE on May 24, 2024, the Company filed its first waiver request application on May 27, 2024, to permit the importation of LEU already committed for delivery to its U.S. customers in 2024 through 2027. On July 18, 2024, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2024 and 2025. For the years 2026 and 2027, the DOE deferred its decision to an unspecified date closer in time to the deliveries. On August 4, 2025, the DOE issued the Company a waiver allowing it to import LEU from Russia for deliveries already committed by the Company to its U.S. customers in years 2026 and 2027. On June 7, 2024, the Company filed a second waiver request application to allow for importation of LEU from Russia committed to the Company's foreign customers for processing and reexport. On October 31, 2024, the DOE issued its determination waiving the prohibition of the importation of such material committed to our foreign customers. On December 11, 2024, the Company filed a third waiver request application to allow for importation of LEU from Russia in 2026 and 2027 for use in future sales to our U.S. customers. The U.S. ban on imports of Russian LEU, without the grant of additional timely waivers, would have a negative material impact on our business. Through 2027, well over one-half of the LEU that we expect to deliver to customers is expected to be sourced under the TENEX Supply Contract. While we have other sources of supply, they are not sufficient to replace the TENEX supply. It is uncertain whether any waiver would be granted in response to our pending or any potential future applications and, if granted, whether any waiver would be granted in a timely manner for us to benefit from it.
On November 14, 2024 the government of the Russian Federation passed the Russian Decree, effective through December 31, 2027, that rescinded TENEX's general license to export LEU to the United States or to entities registered in the United States. TENEX is required to obtain a specific export license from the Russian authorities in order for it to make shipments to Centrus through 2027. Except for isolated delays, TENEX has received specific licenses to satisfy shipments to Centrus in the regular course of business. However, Centrus has been informed that there is no certainty whether additional licenses will be issued by the Russian authorities and if issued, whether they will be issued in a timely manner and not rescinded prior to the shipment taking place.
Since the enactment of the Import Ban Act and through the issuance of the Russian Decree, TENEX has continued to implement the TENEX Supply Contract while we pursue waivers from the DOE. However, we do not know what future actions, including in response to the Russian Decree, TENEX might take. If TENEX refuses to make future deliveries or otherwise suspends deliveries for an extended period under the TENEX Supply Contract, our delivery obligations to our customers would be negatively impacted, which would have a material adverse effect on the Company. Refer to Part 1, Item 1-, Business and Item 1A -, Risk Factors, - Operational Risks and - War in Ukraine Risks, for further discussion.
On April 15, 2025, the President of the United States signed Executive Order 14272 initiating a U.S. Department of Commerce investigation under Section 232 of the Trade Expansion Act of 1962, to determine whether imports of processed critical minerals, including uranium, and their derivative products threaten to impair national security. Following the investigation, on January 14, 2026, the President issued Proclamation 11001, which directed the Secretary of Commerce and the United States Trade Representative ("USTR") to pursue negotiations with trading partners over the next 180 days to ensure the United States maintains adequate supplies of critical minerals while mitigating supply-chain vulnerabilities affecting processed critical minerals and their derivative products. Proclamation 11001 indicated that, depending on the status or outcome of those negotiations, alternative remedies may be considered in the future, including the imposition of an additional sectoral tariff. The imposition of new or increased tariffs on these products or other trade restrictions from our international suppliers could significantly increase our costs and have a material adverse effect on our financial position and results of operations.
In addition to limitations targeted specifically at imports of LEU, the expanding sanctions imposed by the United States and foreign governments on the mechanisms used to make payments to Russia and to obtain services, including transportation and other services, have increased the risk that implementation of the TENEX Supply Contract may be disrupted in the future. For example, effective January 10, 2025, the U.S. Secretary of the Treasury, made a determination pursuant to section l(a)(i) of Executive Order 14024, to apply certain sanctions to any person determined, pursuant to that section, to operate or have operated in "the energy sector of the Russian Federation economy." TENEX's financial institutions have had challenges in accepting payments denominated in U.S. dollars and the Company and TENEX have agreed to delay certain payments under the TENEX Supply Contract as the parties review payment processing options. Additionally, on April 17, 2025, the Office of the USTR released a notice issuing the results of its investigation into China's dominance in the maritime, logistics, and shipbuilding sectors pursuant to Section 302(a) of the Trade Act of 1974, as amended. The USTR imposed new service fees on Chinese-built vessels entering U.S. ports above certain capacity. Our shipper of Russian LEU from Russia to the U.S. uses ships manufactured in China which happen to be exempt from the new fees under this notice. However, these fees would be significant if they were to be imposed on our shipper. If the USTR changes its position and does not exempt the type of vessel our shipper uses, then the additional fees imposed on our shipper for docking at U.S. ports would be cost prohibitive, would have a significant impact on our ability to transport Russian LEU and would also have a material adverse effect on our financial position and results of operations. If the U.S. government were to prohibit companies and individuals from engaging in transactions with Rosatom and its subsidiaries, including TENEX, the Company and its suppliers could not implement the TENEX Supply Contract absent a license or other authorization from the sanctioning government.
Given all the foregoing, we continue to monitor the situation closely and assess the potential impact of any new sanctions or restrictions on the Company or potential tariffs on products it imports or purchases from foreign suppliers and possible mitigation thereof.
For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors - The current war in Ukraine and related international or U.S. sanctions, tariffs and restrictions on trade, and the Russian response thereto, could have a material adverse impact on our business, results of operations, and financial condition.
Operating Results
Our revenues, operating results, and cash flows can fluctuate significantly from quarter to quarter and year to year. Our LEU segment backlog consists primarily of long-term, fixed commitment contracts and contingent sales commitments, and we have visibility on a significant portion of our revenue for 2026 - 2030, although our revenue is subject to material adverse impacts from the Import Ban Act and the Russian Decree.
Our future operating results are subject to uncertainties that could affect results either positively or negatively. Among the factors that could affect our results are the following:
Our ability to obtain additional waivers to allow us to import LEU from Russia for future sales to our U.S. customers, given the enactment of the Import Ban Act;
The ability of TENEX to obtain, or timely obtain, and the willingness of TENEX to continue to request, additional licenses to export LEU from Russia so that we may continue supplying LEU to our customers, given the enactment and extension of the Russian Decree;
Conditions in the LEU and energy markets, including pricing, demand, operations, government restrictions on imports, exports or investments, and regulations of our business and activities and those of our customers, suppliers, contractors, and subcontractors;
Recently enacted tariffs and sanctions and the potential for additional tariffs, sanctions and other measures that restrict with whom we may transact or affect the importation, sales or purchases of SWU or uranium or goods or services required for the sale, purchase, transportation or delivery of such SWU or uranium;
Our ability to be awarded any additional task orders under the HALEU Deconversion Contract or HALEU Production Contract;
Insufficient or untimely U.S. government funding and government appropriations to support our IDIQ contracts with the U.S. federal government, including the HALEU Operation Contract and HALEU Production Contract;
Regulatory uncertainty from new or rescinded executive order or new or changes interpretations of federal regulations;
Armed conflicts, including the war in Ukraine, government actions and other events or third-party actions that disrupt supply chains, production, transportation, payments, and importation of nuclear materials or other critical supplies or services;
The availability and terms of additional purchases or sales of SWU and uranium;
Timing of customer orders, related deliveries, and purchases of LEU or LEU components;
Costs of and future funding and demand for HALEU;
Financial market conditions and other factors that may affect pension and benefit liabilities and the value of related assets;
The outcome of legal proceedings and other contingencies;
Potential use of cash for strategic or financial initiatives;
Actions taken by customers and suppliers, including actions that might affect existing contracts;
The government's inability to satisfy its obligations, including supplying government furnished equipment under its agreements with the Company or processing security clearances resulting from a shutdown or other reasons; and
Market, international trade, and other conditions impacting Centrus' customers and the industry.
For further discussion of these risks and uncertainties, refer to Part I, Item 1A, Risk Factors.
Backlog
The Company's backlog across both segments was $3.8 billion and $3.7 billion as of December 31, 2025 and 2024, respectively, and extends to 2040. The backlog is recognized as revenue in future periods as work is performed or deliveries of SWU and uranium are made.
Our backlog in the LEU segment extends to 2040. As of December 31, 2025 and 2024, our backlog was approximately $2.9 billion and $2.8 billion, respectively. The backlog is the estimated aggregate dollar amount of revenue for future SWU and uranium deliveries primarily under medium and long-term contracts with fixed commitments. Of the $2.9 billion, approximately $2.3 billion represents contingent LEU sales contracts and commitments, with $2.1 billion of the total under definitive agreements and $0.2 billion of the total subject to entering into definitive agreements, in support of potential construction of LEU production capacity at the Piketon, Ohio facility. The contingent LEU sales contracts and commitments also depend on our ability to secure substantial public and private investment necessary to build new enrichment capacity. The LEU segment backlog also includes approximately $0.1 billion of deferred revenue and advances from customers as of December 31, 2025, whereby customers have made advance payments to be applied against future deliveries. No orders in our backlog are considered at risk related to customer operations. However, these medium and long-term contracts are subject to significant risks and uncertainties, including existing import laws and restrictions, such as the RSA, which limits imports of Russian uranium products into the United States and applies to our sales using material procured under the TENEX Supply Contract, as well as the potential for additional sanctions and other restrictions affecting the Company or its suppliers, in response to the evolving situation regarding the war in Ukraine.
Our backlog in the Technical Solutions segment extends to 2034. As of both December 31, 2025 and 2024, our backlog was approximately $0.9 billion. Our backlog includes both funded amounts (services for which funding has been both authorized and appropriated by the customer), unfunded amounts (services for which funding has not been appropriated), and unexercised options in our contracts. If any of our contracts were to be terminated or options not being exercised, our remaining backlog would be reduced by the expected value of the cancelled contracts or forgone options.
Revenue
We have two reportable segments: the LEU segment and the Technical Solutions segment.
Our LEU segment revenue is derived primarily from the following:
sales of the SWU component of LEU;
sales of natural uranium hexafluoride, uranium concentrates or uranium conversion; and
sales of enriched uranium product that include both the natural uranium hexafluoride and SWU components of LEU.
Our Technical Solutions segment revenue is derived from the production of HALEU under the HALEU Operation Contract with DOE and technical, manufacturing, engineering, and operations services offered to public and private sector customers.
SWU and Uranium Sales
Revenue from our LEU segment accounted for approximately 77% of our total revenue for the year ended December 31, 2025. The majority of our customers are domestic and international utilities that operate nuclear power plants, with international sales constituting approximately 33% of revenue from our LEU segment since 2023. Our agreements with electric utilities are primarily medium and long-term fixed-commitment contracts under which our customers are obligated to purchase a specified quantity of the SWU component of LEU from us. Contracts where we sell both the SWU and natural uranium hexafluoride components of LEU to utilities or where we sell natural uranium hexafluoride to utilities and other nuclear fuel related companies are generally shorter-term, fixed-commitment contracts. Individual customer orders for the SWU component of LEU fulfilled in 2025 averaged approximately $10.2 million per order. As a result, a relatively small shift in the timing of customer orders for LEU may cause significant variability in our operating results year over year.
Utility customers, in general, have the option to make payment but defer receipt of SWU and uranium products purchased from Centrus beyond the contractual sale period, resulting in the deferral of revenue recognition and related costs. Refer to Note 2,Revenue and Contracts with Customers,in the Consolidated Financial Statements in Part IV of this Annual Report for further details.
Our financial performance over time can be affected significantly by changes in prices for SWU and natural uranium hexafluoride. Market prices for SWU and uranium hexafluoride significantly declined from 2011 until mid-2018, when they began to trend upward. More recently, market uncertainty in the wake of the war in Ukraine has driven SWU and uranium hexafluoride prices sharply higher. Since our backlog includes contracts awarded to us in previous years, the average SWU price billed to customers typically lags published price indicators by several years. Revenue in our LEU business varies based upon the timing of customer contracts. The pricing of deliveries varies depending upon the market conditions at the time the contract was signed and may not reflect current market prices.
The Import Ban Act, which bans the importation of LEU from Russia, may severely limit importation through 2027 and will cut off supply of LEU from Russia after 2027. Notwithstanding our ability to obtain waivers under the Import Ban Act, the Russian Decree, which prohibits the exportation of Russian LEU without a license, may severely limit exportation of LEU from Russia through December 31, 2027. This has drawn attention to the potential for significant tightening of supplies in the market. Russian enrichment plants represent 43% of the world's capacity, and Russian capacity significantly exceeds its domestic needs. According to data from the WNA, the annual enrichment requirements of reactors worldwide outside of Russia vastly exceeds the available supply of non-Russian enrichment, which potentially threatens the viability of some reactors, including those in the United States. While inventories and increased production at non-Russian plants may mitigate the shortfall, these options would not fully replace Russian supply. Deployment of new capacity ultimately could replace Russian enrichment but this capacity will take a number of years and significant funding from private and/or government sources to come online. Centrus is seeking public and private funding to deploy new production capacity at its Piketon, Ohio, plant to help meet the need for new, domestic supplies of enriched uranium.
The following chart summarizes long-term and spot SWU price indicators, and a spot price indicator for UF6, as published by TradeTech, LLC in Nuclear Market Review:
SWU and Uranium Market Price Indicators*
* Source: Nuclear Market Review, a TradeTech publication, www.uranium.info
Our contracts with customers are denominated primarily in U.S. dollars, and, although revenue has not been materially affected by changes in the foreign exchange rate of the U.S. dollar, we may have a competitive price advantage or disadvantage obtaining new contracts in a competitive bidding process depending upon the weakness or strength of the U.S. dollar. Under a customer contract with deliveries from 2023 to 2025, prices are payable in a combination of U.S. dollars and euros. Costs of our primary competitors are denominated in other currencies. Our contracts with suppliers are primarily denominated in U.S. dollars. We have a SWU supply agreement, that commenced in 2023, with prices payable in a combination of U.S. dollars and euros but with a contract-defined exchange rate.
On occasion, we will accept payment for SWU in the form of natural uranium hexafluoride. Revenue from the sale of SWU under such contracts is recognized at the time LEU is delivered and is based on the fair value of the natural uranium hexafluoride at contract inception, or as the quantity of natural uranium hexafluoride is finalized, if variable.
Cost of sales for SWU and uranium is based on the amount of SWU and uranium hexafluoride sold and delivered during the period and unit inventory costs, which are determined using the average cost method. Changes in purchase costs have an effect on inventory costs and cost of sales. Cost of sales includes costs for inventory management at off-site licensed locations, as well as, certain legacy costs related to former employees of the Portsmouth GDP and Paducah GDP.
Critical Accounting Policies and Estimates
Our significant accounting policies are summarized in Note 1,Summary of Significant Accounting Policies, of our Consolidated Financial Statements in Part IV of this Annual Report, which were prepared in accordance with U.S. GAAP. U.S. GAAPand related accounting pronouncements, implementation guidelines and interpretations with regard to a wide range of matters that are relevant to our business are complex and involve many subjective assumptions, estimates and judgments that are, by their nature, subject to substantial risks and uncertainties. Critical accounting estimates are those that require management to make assumptions about matters that are uncertain at the time the estimate is made and for which different estimates, often based on complex judgments, probabilities and assumptions that we believe to be reasonable, but are inherently uncertain and unpredictable, could have a material impact on our operating results and financial condition. It is also possible that other professionals, applying their own judgment to the same facts and circumstances, could develop and support a range of alternative estimated amounts. We are also subject to risks and uncertainties that may cause actual results to differ from estimated amounts, such as the healthcare environment, legislation and regulation. Additionally, changes in accounting rules or their interpretation could significantly affect our results of operations and financial condition.
The sensitivity analyses used below are not intended to provide a reader with our predictions of the variability of the estimates used. Rather, the sensitivities used are included to allow the reader to understand a general cause and effect of changes in estimates.
We have identified the following to be our critical accounting estimates:
Revenue Recognition - Technical Solutions
The Company generally recognizes revenue for performance obligations to provide services over time based on costs incurred or the right to invoice method (in cases where the value transferred matches the Company's billing rights), as the customer receives and consumes the benefits. For performance obligations in which control does not continuously transfer to the customer, the Company recognizes revenue at the point in time in which each performance obligation is fully satisfied. This coincides with the point in time the customer obtains control of the product or service, which typically occurs upon customer acceptance or receipt of the product or service, given that the Company maintains control of the product or service until that point.
For performance obligation to deliver products with continuous transfer of control to the customer, the Company uses the cost-to-cost input method of progress because it best depicts the transfer of control to the customer that occurs as the Company incurs costs. Under the cost-to-cost method, the extent of progress towards completion is measured based on the proportion of direct costs incurred to date to the total estimated direct costs at completion of the performance obligation. Revenues are recorded proportionally as costs are incurred.
The Company determines the transaction price for each contract based on the consideration it expects to receive for the products or services being provided under the contract. If transaction prices are not stated in the contract for each performance obligation, contractual prices are allocated to performance obligations based on estimated relative standalone selling prices of the promised services. For contracts with multiple performance obligations, the Company allocates the transaction price to each performance obligation based on the estimated standalone selling price of the product or service underlying each performance obligation. The standalone selling price represents the amount the Company would sell the product or service to a customer on a standalone basis (i.e., not bundled with any other products or services). The Company's contracts with the U.S. government are subject to the FAR and the price is typically based on estimated or actual costs plus a reasonable profit margin. As a result of these regulations, the standalone selling price of products or services in the Company's contracts with the U.S. government are typically equal to the selling price stated in the contract. The Company does not contemplate future modifications, including unexercised options until they become legally enforceable. Contracts may be subsequently modified to include changes in specifications, requirements or price, which may create new or change existing enforceable rights and obligations. Depending on the nature of the modification, the Company considers whether to account for the modification as an adjustment to the existing contract or as a separate contract.
In cases where the Company uses the cost-to-cost input method of progress for performance obligations, the extent of progress towards completion is measured based on the proportion of direct costs incurred to date to the total estimated direct costs at completion of the performance obligation. Revenues are recorded proportionally as costs are incurred. For performance obligations to provide services to the customer, revenue is recognized over time based on direct costs incurred or the right to invoice method (in situations where the value transferred matches the Company's billing rights) as the customer receives and consumes the benefits.
Significant estimates and assumptions are made in estimating revenue under the cost-to-cost method and total estimated costs, including the estimated contract profit/loss. At the outset of a long-term contract, the Company identifies and monitors risks to the achievement of the technical, schedule and cost aspects of the contract, and assesses the effects of those risks on its estimates of revenue and total costs to complete the contract. The estimates consider the technical requirements, schedule and costs. The initial estimated total costs for each contract considers risks surrounding the ability to achieve the technical requirements, schedule and costs in the initial estimated total costs to complete the contract. Total estimated costs may decrease during the performance of the contract if the Company successfully retires risks surrounding the technical, schedule and cost aspects of the contract. Conversely, total estimated costs may increase if the estimated total costs to complete the contract increase. As a significant change in one or more estimates could affect the profitability of the Company's contracts, the Company reviews and updates its contract-related estimates regularly. When estimates of total costs at completion for an integrated, construction type contract exceed total estimates of revenue to be earned on a performance obligation related to complex equipment or related services, a provision for the remaining loss on the performance obligation is recognized in the period the loss is determined. Estimated costs are subject to change during the performance period of the contract and may affect the estimated contract loss.
Asset Valuations
The accounting for SWU and uranium inventories includes estimates and judgments. SWU and uranium inventory costs are determined using the average cost method. Inventories of SWU and uranium are valued at the lower of cost or NRV. NRV is the estimated selling price in the ordinary course of business less reasonably predictable costs of completion, disposal, and transportation. The estimated selling price for SWU and uranium under contract is based on the pricing terms of contracts in our backlog. For uranium not under contract, the estimated selling price is based primarily on published price indicators at the balance sheet date.
Intangible assets originated from our reorganization and application of fresh start accounting as of September 30, 2014. The intangible assets represented the fair value adjustment to the assets and liabilities for our LEU segment. The identifiable intangible assets relate to our LEU segment backlog and customer relationships. The backlog intangible asset is amortized as the backlog, valued at emergence, is reduced, principally as a result of deliveries to customers. The customer relationships intangible asset is amortized using the straight-line method over the estimated average useful life of 15 years, with 3 ¾ years of scheduled amortization remaining. The aggregate net balance of identifiable intangible assets was $21.2 million as of December 31, 2025.
The carrying values of the intangible assets are subject to impairment tests whenever events or changes in business circumstances indicate that the carrying amount of the intangible assets may not be fully recoverable. The carrying amount of a long-lived asset is not recoverable if it exceeds the sum of the undiscounted cash flows expected to result from the use and eventual disposition of the asset. An impairment loss is measured as the amount by which the carrying amount of a long-lived asset, or asset group exceeds its fair value.
Inherent in our fair value determinations are certain judgments and estimates, including projections of future cash flows, the discount rate reflecting the risk inherent in future cash flows, the interpretation of current economic indicators and market valuations, and strategic plans with regard to operations. A change in these underlying assumptions would cause a change in the results of the tests, which could cause the fair value of the intangible asset to be less than its respective carrying amount.
Pension and Postretirement Health and Life Benefit Costs and Obligations
We provide retirement benefits to certain employees and retirees under defined benefit pension plans and postretirement health and life benefit plans. The valuation of benefit obligations and costs is based on provisions of the plans and actuarial assumptions that involve judgments and estimates.
Assets and obligations related to our retiree benefit plans are remeasured each year as of the balance sheet date resulting in differences between actual and projected results for the year. The Company has elected the accounting option to recognize these actuarial gains and losses in the statement of operations in the fourth quarter. The alternative would be to amortize gains and losses into operating results over time. The Company's treatment of recognizing actuarial gains and losses immediately is intended to increase transparency into how movements in plan assets and benefit obligations impact financial results. Immediate recognition of such gains and losses in the statement of operations may cause significant fluctuations in our results of operations. In addition, an interim remeasurement and recognition of gains or losses may be required for a plan during the year if lump sum payments exceed certain levels.
Components of retirement benefit expense/income other than service cost are presented in our Consolidated Statements of Operations as Nonoperating Components of Net Periodic Benefit Loss (Income). These components consist primarily of the return on plan assets, offset by interest cost as the discounted present value of benefit obligations nears payment. Results also reflect claims experience, changes in mortality and healthcare claim assumptions and changes in market interest rates. Service cost is recognized in Cost of Sales(for the LEU segment) and Selling, General and Administrative expenses.
Nonoperating Components of Net Periodic Benefit Loss (Income)netted to loss of $6.8 million, income of $14.7 million, and income of $23.2 million for the year ended December 31, 2025, 2024, and 2023, including a net actuarial loss of $2.9 million, gain of $17.9 million, and gain of $24.6 million for the year ended December 31, 2025, 2024, and 2023, respectively. For the year ended December 31, 2025, the net actuarial loss reflected unfavorable investment returns relative to the expected return assumption and a decrease in interest rates from approximately 5.7% to 5.6%. For the year ended December 31, 2024, the net actuarial gain reflected an annuitization in May 2024, favorable investment returns relative to the expected return assumption and an increase in interest rates from approximately 5.2% to 5.7%, partially offset by unfavorable investment returns relative to the expected return assumption. For the year ended December 31, 2023, the net actuarial loss reflected favorable investment returns relative to the expected return assumption, partially offset by a decrease in interest rates from approximately 5.5% to 5.2%.
Changes in actuarial assumptions could impact the measurement of benefit obligations and benefit costs, as follows:
The expected return on benefit plan assets is approximately 6.3% for 2026. The expected return is based on historical returns and expectations of future returns for the composition of the plans' equity and debt securities. A one-half percentage point decrease in the expected return on plan assets would increase annual pension costs by $0.2 million in 2026. However, the net impact of any changes in the expected return on benefit plan assets on the final benefit cost recognized for fiscal year 2026 would be $0 since the actual return on assets would effectively be reflected at December 31, 2026, under our mark-to-market accounting methodology.
The present value of pension obligations is calculated by discounting long-term obligations using a market interest rate. This discount rate is the estimated rate at which the benefit obligations could be effectively settled on the measurement date and is based on yields of high quality fixed income investments whose cash flows match the timing and amount of expected benefit payments of the plan. Discount rates of approximately 5.6% were used as of December 31, 2025. A one-half percentage point reduction in the discount rate would increase the valuation of pension benefit obligations by $1.9 million and postretirement health and life benefit obligations by $3.2 million, and the resulting changes in the valuations would decrease the aggregate service cost and interest cost components of annual pension costs and postretirement health and life benefit costs by $0 and $0.2 million, respectively.
The healthcare costs trend rates are 9% projected in 2026 reducing to a final trend rate of 5% by 2034. The healthcare costs trend rate represents our estimate of the annual rate of increase in the gross cost of providing benefits. The trend rate is a reflection of health care inflation assumptions, changes in healthcare utilization and delivery patterns, technological advances, and changes in the health status of our plan participants.
Income Taxes
During the ordinary course of business, there are transactions and calculations for which the ultimate tax determination is uncertain. As a result, we recognize tax liabilities based on estimates of whether additional taxes and interest will be due. To the extent that the final tax outcome of these matters is different than the amounts that were initially recorded, such differences will impact the income tax provision in the period in which such determination is made.
Accounting standards prescribe a minimum recognition threshold that a tax position is required to meet before the related tax benefit may be recognized in the financial statements. As of December 31, 2025, the liability for unrecognized tax benefits, included in Other Long-Term Liabilitieson the Consolidated Balance Sheet in Part IV of this Annual Report, was $3.6 million and accrued interest and penalties totaled $0.8 million.
Accounting for income taxes involves estimates and judgments relating to the tax bases of assets and liabilities and the future recoverability of deferred tax assets. In assessing the realization of deferred tax assets, we determine whether it is more likely than not that the deferred tax assets will be realized. The ultimate realization of deferred tax assets is dependent upon generating sufficient taxable income in future years when deferred tax assets are recoverable or are expected to reverse. Factors that may affect estimates of future taxable income include, but are not limited to, competition, changes in revenue, costs or profit margins, market share, and developments related to the American Centrifuge technology. In practice, positive and negative evidence is reviewed with objective evidence receiving greater weight. If, based on the weight of available evidence, it is more likely than not that all, or some portion, of the deferred tax assets will not be realized, we record a valuation allowance. The more negative evidence that exists, the more positive evidence is necessary and the more difficult it is to support a conclusion that a valuation allowance is not needed for all, or some portion, of the deferred tax assets.
All available positive and negative evidence is analyzed quarterly to determine the amount of the valuation allowance. A full valuation allowance against the federal and state net deferred assets was first recorded in the fourth quarter of 2011 because of significant losses and other negative evidence.
In 2023, 2024, and 2025, Centrus evaluated both positive and negative evidence that was objectively verifiable to determine the amount of the federal valuation allowance that was required on Centrus' federal deferred tax assets. In 2023, Centrus had visibility on a significant portion of revenue in the LEU segment for 2024 through 2026, primarily from its long-term sales contracts. Centrus determined that the positive evidence of increased forecasted future income in the LEU segment based on existing sales backlog and supply contracts along with commodity market forward pricing indicators, supported the release of a portion of the federal valuation allowance. However, because of the lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. Therefore, Centrus recorded a partial release of its federal valuation allowance. In the third and fourth quarters of 2023, respectively, Centrus released $7.7 million and $11.7 million of the valuation allowance against its federal net deferred tax assets. In 2024, Centrus had visibility on a significant portion of revenue in the LEU segment for 2025 through 2027, primarily from its long-term sales contracts. Additionally, Centrus' interest income forecast increased based upon increased liquidity. Centrus determined that the positive evidence of increased forecasted future income in the LEU segment based on existing sales backlog and supply contracts along with commodity market forward pricing indicators, and interest outlook supported the release of a portion of the federal valuation allowance. However, because of the lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. In the fourth quarter of 2024, Centrus released $16.6 million of the valuation allowance against its federal net deferred tax assets. In the third quarter of 2025, Centrus had visibility on a significant portion of revenue in the LEU segment for 2025 through 2030, primarily from its long-term sales contracts. Additionally, Centrus' investment income forecast increased based upon increased liquidity. Centrus determined that the positive evidence of increased future investment income supported the release of the federal valuation allowance. However, because of the lack of objectively verifiable information in later years, it was determined that forecasted future income was not sufficient to realize all the deferred tax assets. Therefore, in the third quarter of 2025, Centrus released $10.2 million of the valuation allowance against its federal net deferred tax assets.
The Company continues to maintain a partial valuation allowance against its remaining federal and state net deferred tax assets as a result of significant federal and state net operating losses and insufficient future taxable income. As of December 31, 2025, the valuation allowance against the remaining federal and state net deferred tax assets was $355.4 million.
Going forward, Centrus will continue to evaluate both positive and negative evidence that would require changes to the remaining federal and state valuation allowances. Such evidence in our Technical Solutions segment may include events that could have a significant impact on pre-tax income, such as signing new contracts with significantly higher or lower margins than currently forecasted, follow-on work related to the HALEU program, or abandonment of the commercial deployment of the centrifuge technology. Refer to Part I, Item 1A,Risk Factors for more information. Such evidence in our LEU segment may include renewing SWU sales contracts with existing customers and/or signing new SWU sales or purchase contracts with significantly higher or lower margins than currently forecasted. Additional evidence in the LEU segment may include potential deferrals in the timing of deliveries requested by its customers, which could impact revenue recognition timing. The impact of these and other potential positive and negative events will be weighed and evaluated to determine if the valuation allowances should be increased or decreased in the future.
Recent Accounting Pronouncements
Refer to Note 1 - Basis of Presentation and Principles of Consolidationin Part IV of the Consolidated Financial Statements on this Annual Report
Results of Operations
Set forth below are our results of operations for the year ended December 31, 2025 compared with the year ended December 31, 2024. We have omitted discussion of 2023 results where it would be redundant to the discussion previously included in Item 7 of our 2024 Annual Report on Form 10-K, filed with the SEC on February 7, 2025.
Segment Information
The following table presents elements of the accompanying Consolidated Statements of Operations that are categorized by segment (dollar amounts in millions):
Year Ended December 31, 2025 Compared with Year Ended December 31, 2024
Year Ended December 31,
2025 2024 $ Change % Change
LEU segment
Revenue:
SWU revenue $ 298.7 $ 246.8 $ 51.9 21 %
Uranium revenue 47.5 103.1 (55.6) (54) %
Total 346.2 349.9 (3.7) (1) %
Cost of sales 234.7 256.0 (21.3) (8) %
Gross profit $ 111.5 $ 93.9 $ 17.6 19 %
Technical Solutions segment
Revenue $ 102.5 $ 92.1 $ 10.4 11 %
Cost of sales 96.5 74.5 22.0 30 %
Gross profit
$ 6.0 $ 17.6 $ (11.6) (66) %
Total
Revenue $ 448.7 $ 442.0 $ 6.7 2 %
Cost of sales 331.2 330.5 0.7 - %
Gross profit $ 117.5 $ 111.5 $ 6.0 5 %
Revenue
Revenue from the LEU segment was $346.2 million and $349.9 million for the year ended December 31, 2025 and 2024, respectively, a decrease of $3.7 million (or 1%). Uranium revenue decreased $55.6 million (or 54%) while SWU revenue increased $51.9 million (or 21%) as a result of a 23% increase in the volume of SWU sold, partially offset by a 1% decrease in the average price of SWU sold.
Revenue from the Technical Solutions segment was $102.5 million and $92.1 million for the year ended December 31, 2025 and 2024, respectively, an increase of $10.4 million (or 11%). Revenue generated by the HALEU Operation Contract increased by $10.5 million. Revenue from the HALEU Operation Contract is recorded on a cost-plus-incentive-fee basis and includes a target fee for Phases 2 and 3 of the contract.
Cost of Sales
Cost of sales for the LEU segment was $234.7 million and $256.0 million for the year ended December 31, 2025 and 2024, respectively, a decrease of $21.3 million (or 8%). Uranium costs decreased while SWU costs increased as a result of a 23% increase in the volume of SWU sold, partially offset by a 13% decrease in the average unit cost of SWU sold.
Cost of sales for the Technical Solutions segment was $96.5 million and $74.5 million for the year ended December 31, 2025 and 2024, respectively, an increase of $22.0 million (or 30%). The increase is primarily attributable to a $22.8 million increase in costs incurred under the HALEU Operation Contract, partially offset by a decrease in costs related to other contracts. For details on HALEU Operation Contract accounting, refer to Technical Solutions - Government Contractingabove.
Gross Profit
The Company recognized a gross profit of $117.5 million and $111.5 million for the year ended December 31, 2025 and 2024, respectively, an increase of $6.0 million (or 5%).
Gross profit for the LEU segment was $111.5 million and $93.9 million for the year ended December 31, 2025 and 2024, respectively, an increase of $17.6 million (or 19%). The increase was due primarily to the increase in the volume of SWU sold and an increase in the margin on SWU sales resulting from the specific contract and pricing mix of SWU contracts. The increase in SWU gross profit was partially offset by a decrease in uranium gross profit.
Gross profit for the Technical Solutions segment was $6.0 million and $17.6 million for the year ended December 31, 2025 and 2024, respectively, a decrease of $11.6 million (or 66%). The decrease was primarily attributable to the factors discussed inRevenue and Cost of Salesabove. Because of the delay in completing Phase 2 of the HALEU Operation Contract, DOE extended Phase 2 through January 31, 2026. Costs incurred subsequent to November 2024 have not yet been subject to a fee as this portion of Phase 2 remains undefinitized and is subject to negotiation.
Non-Segment Information
The following table presents elements of the accompanying Consolidated Statements of Operations that are not categorized by segment (dollar amounts in millions):
Year Ended December 31, 2025 Compared with Year Ended December 31, 2024
Year Ended December 31,
2025 2024 $ Change % Change
Gross profit $ 117.5 $ 111.5 $ 6.0 5 %
Advanced technology costs 16.9 17.2 (0.3) (2) %
Selling, general and administrative 36.2 35.0 1.2 3 %
Equity-related compensation
5.8 1.5 4.3 287 %
Amortization of intangible assets
8.4 9.8 (1.4) (14) %
Operating income 50.2 48.0 2.2 5 %
Nonoperating components of net periodic benefit loss (income)
6.8 (14.7) 21.5 146 %
Interest expense 14.0 2.7 11.3 419 %
Investment income (44.7) (12.9) (31.8) (247) %
Extinguishment of long-term debt
(11.8) - (11.8) n/a
Other income, net
- (0.1) 0.1 100 %
Income before income taxes 85.9 73.0 12.9 18 %
Income tax expense (benefit)
8.1 (0.2) 8.3 4,150 %
Net income $ 77.8 $ 73.2 $ 4.6 6 %
Equity-Related Compensation
Equity-related compensation expense was $5.8 million and $1.5 million for the year ended December 31, 2025 and 2024, respectively, an increase of $4.3 million (or 287%). This increase was primarily as a result of a non-cash charge of $3.6 million due to the reclassification of certain Board restricted stock unit grants from equity to liability.
Nonoperating Components of Net Periodic Benefit Loss (Income)
Nonoperating components of net periodic benefit loss (income) netted to a loss of $6.8 million and income of $14.7 million for the year ended December 31, 2025 and 2024, respectively, a change of $21.5 million (or 146%). For the year ended December 31, 2025, nonoperating components of net periodic benefit income consist primarily of interest costs of $6.2 million and pension plan remeasurements of $2.9 million, partially offset by other investment income and gains on plan assets and other activity of ($2.3) million. For the year ended December 31, 2024, nonoperating components of net periodic benefit income consist primarily of the pension plan remeasurements of ($16.8) million, driven by an annuitization of ($16.6) million in May 2024, and other investment income and gains on plan assets of ($9.9) million, partially offset by interest costs of $12.1 million.
Interest Expense
Interest expense was $14.0 million and $2.7 million for the year ended December 31, 2025 and 2024, respectively, an increase of $11.3 million (or 419%). This increase was due primarily to interest incurred on the 2.25% Convertible Notes issued in November 2024 and on the 0% Convertible Notes issued in August 2025.
Investment Income
Investment income was $44.7 million and $12.9 million for the year ended December 31, 2025 and 2024, respectively, an increase of $31.8 million (or 247%). The Company's investment income represents interest earned on operating cash, which is primarily held in money market accounts. The increase was due primarily to a higher cash balance as a result of the issuance of our 0% Convertible Notes and common stock issuances under the Company's ATM program.
Extinguishment of Long-Term Debt
Pursuant to a redemption notice, on March 26, 2025, the Company redeemed all of the outstanding 8.25% Notes at a redemption price equal to 100% of the principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million related to the extinguishment of the 8.25% Notes in the year ended December 31, 2025.
Income Tax Expense (Benefit)
Income tax expense was $8.1 million and income tax benefit was ($0.2) million for the year ended December 31, 2025 and 2024, respectively, a change of $8.3 million (or 4150%). For the year ended December 31, 2025, income tax expense consists of federal income tax expense of $8.1 million, permanent differences of $2.6 million, and state income tax expense of ($0.1) million. For the year ended December 31, 2024, income tax expense consists of federal income tax benefit of ($0.6) million, permanent differences of $3.3 million, and state income tax expense of $0.4 million.
Net Income
Net income was $77.8 million and $73.2 million for the year ended December 31, 2025 and 2024, respectively, an increase of $4.6 million (or 6%). The increase was primarily driven by an increase in investment income of $31.8 million and the extinguishment of long-term debt of $11.8 million, partially offset by a decrease of $21.5 million in nonoperating components of net periodic benefit income and an increase of $11.3 million in interest expense.
Liquidity and Capital Resources
As of December 31, 2025, the Company had a consolidated cash and cash equivalents balance of $2.0 billion. The Company anticipates having adequate liquidity to support our business operations for at least the next 12 months from the date of this Annual Report. Our view of liquidity is dependent on, among other things, conditions affecting our operations, including market, international trade restrictions, sanctions and other conditions, the impact of the Import Ban Act and our ability to obtain additional waivers thereunder, the impact of the Russian Decree and the ability of TENEX to secure export licenses thereunder, the level of expenditures and government funding for our services contracts, and the timing of customer payments. Liquidity requirements for our existing operations are affected primarily by the timing and amount of customer sales and our inventory purchases.
Cash resources and net sales proceeds from our LEU segment fund technology costs that are outside of our customer contracts in the Technical Solutions segment and general corporate expenses, including cash interest payments on our debt. We believe our investment in advanced U.S. uranium enrichment technology will position the Company to meet the needs of our customers as they deploy advanced reactors and next generation fuels.
On November 10, 2022, the DOE awarded the HALEU Operation Contract to the Company with a base contract value of approximately $150.0 million in two phases through 2024. Phase 1 included an approximately $30.0 million cost-share contribution from Centrus matched by approximately $30.0 million from the DOE to complete construction of the cascade, begin operations and produce the initial 20 kilograms of HALEU UF6. On November 7, 2023, the Company announced that it made its first contractual delivery of HALEU UF6to the DOE, completing Phase 1. During November 2023, the Company transitioned to Phase 2 of the HALEU Operation Contract, which included production of 900 kilograms of HALEU UF6for one production year, as well as continued operations and maintenance of the cascade. Phase 2 included an initial contract value of approximately $90.0 million and compensation on a cost-plus-incentive-fee-basis. The DOE owns the HALEU produced from the demonstration cascade. The DOE extended the HALEU Operation Contract Phase 2 period of performance through January 31, 2026 to allow the Company to complete outstanding change orders. As of December 31, 2025, the Phase 2 contract value and related funding is approximately $170.1 million. The Company also is performing additional work on infrastructure and facility repairs and costs associated with 5B Cylinder refurbishment under contract modifications.
The HALEU Operation Contract also gives DOE the ability to exercise three optional periods to contract for up to nine additional years of production from the cascade beyond the base contract; those options are at the DOE's sole discretion and subject to the availability of Congressional appropriations. On June 17, 2025, the DOE exercised Option 1a of Phase 3 of the HALEU Operation Contract with a period of performance extending through June 30, 2026. Option 1a of Phase 3 of the HALEU Operation Contract has a contract value and related funding of $108.2 million.
On January 5, 2026, the DOE announced that ACO was selected for award of a $900.0 million task order to expand its uranium enrichment facility in Piketon, Ohio, to include commercial-scale production of HALEU. The award also includes options, at the DOE's discretion, for up to $170.0 million to produce and deliver HALEU to the DOE. The task order is subject to negotiation of a definitive agreement and there are no guarantees about whether or when funding by the DOE for such expansion would be awarded.
Although the Company believes demand for HALEU will emerge over the next several years, there are no guarantees about whether or when additional government or commercial demand for HALEU will materialize, and there are a number of technical, regulatory and economic hurdles that must be overcome for these fuels and the reactors that will use these fuels to come to the market. For further discussion, refer to Part I, Item 1A, Risk Factors.
If funding of gas centrifuge technology by the U.S. government is reduced or discontinued, or we are not awarded the option to continue to operate the cascade, such actions may have a material adverse impact on our ability to deploy the American Centrifuge technology and on our liquidity. If funding under U.S. federal government programs or contracts and subcontracts, including under the HALEU Operation Contract, HALEU Deconversion Contract, or HALEU Production Contract, is delayed, reduced or terminated, as a result of the changes in the prevailing policies and budgetary priorities of the incumbent administration or otherwise, it could have a material adverse impact on our operations, including our ability to deploy the American Centrifuge technology.
Further, any sanctions, tariffs, or other restrictions, including the Import Ban Act banning LEU imports from Russia and the Russian Decree prohibiting LEU exports out of Russia in the absence of a license, represent a significant risk to our business as we currently rely on the TENEX Supply Contract as a significant supply source to meet our delivery obligations. Such bans or tariffs on LEU imports or exports from Russia could have a material impact on our operations and liquidity. For further discussion, please see Part I, Item 1A, Risk Factors.
We expect to increase our capital expenditures by approximately several hundred million, driven by ongoing investments and a strategic shift towards our manufacturing readiness plan and Ohio expansion. We expect that our strong liquidity position will support our capital expenditures, although we are monitoring inflationary pressures that may affect the cost of materials and equipment.
Expansion of Manufacturing Capacity in Oak Ridge
On November 20, 2024, the Company announced the resumption of centrifuge manufacturing activities and expansion of its manufacturing capacity at its facility in Oak Ridge, Tennessee. The Company is investing $60.0 million over an 18 month period lays the groundwork to support a potential large-scale expansion of uranium enrichment in Piketon, Ohio. This was followed with an announcement on January 23, 2026 that the Company plans to invest more than $560.0 million over the next several years to transition the facility to a high-rate manufacturing plant and support the production of thousands of advanced centrifuges in Oak Ridge, Tennessee. The first new centrifuges produced in Oak Ridge are expected to come online in Ohio in 2029.
Expansion of Uranium Enrichment Capacity in Piketon, Ohio
On September 25, 2025, Centrus announced plans for a major expansion of its uranium capacity in Piketon, Ohio, including plans for large-scale production of both LEU and HALEU to meet commercial and government requirements.
In December 2025, the Company initiated design work on a 150,000 square foot training, operations and maintenance Facility in Piketon, Ohio - a critical piece of site infrastructure necessary to support the Company's plans for a major expansion of its uranium enrichment capacity in Piketon. The project involves a significant renovation and rehabilitation of an existing, largely vacant building on the site of the American Centrifuge Plant, with construction activities set to begin in early 2026. The facility is expected to include a mix of office space, training facilities, and maintenance bays to support plant operations. Also in December 2025, the Company began domestic centrifuge manufacturing to support commercial LEU enrichment activities at the Piketon, Ohio, facility. This strategic move enables the Company to capitalize on its many first-mover advantages in U.S.-owned domestic uranium enrichment, and marks one of the most consequential transformations in the Company's and the United States' uranium enrichment history. Centrus plans to leverage its multi-billion-dollar uranium enrichment expansion to meet its growing backlog of $2.3 billion in contingent LEU sales to U.S. and international customer contracts, and targets future commercial-scale production of HALEU, as well. For further details, see Part 1, Item 1, Business - Low Enriched Uranium - LEU Backlog and Technical Solutions - Technical Solutions Backlog.
Clean Energy Credit
The Qualifying Advanced Energy Project Credit ("§48C") was established by the American Recovery and Reinvestment Act of 2009 and renewed and expanded under the IRA. The "§48C" program aims to strengthen U.S. industrial competitiveness and clean energy supply chains. As the nation builds a net-zero economy, the §48C tax credit program aims to play a critical role to create high-quality jobs, reduce industrial emissions, and increase domestic production of critical clean energy products and materials. The IRA provided $10 billion in new funding under §48C(e), with at least $4 billion reserved for projects in certain energy communities with closed coal mines or retired coal-fired power plants, to allocate credits to projects in three categories: (1) Clean energy manufacturing and recycling, (2) industrial decarbonization, and (3) critical materials refining, processing, and recycling.
On October 18, 2024, the Company submitted an application for a clean energy manufacturing and recycling project associated with re-equipping our manufacturing property at our manufacturing facility in Oak Ridge. This will recreate a viable enrichment supply chain and allow ACO to manufacture centrifuge parts to be used in centrifuge machines to enrich uranium. Our application requested an allocation of $62.4 million based on a qualified investment in eligible property of $208.0 million made by Centrus. On January 10, 2025, the Company was informed that the IRS has granted our request for $62.4 million credit allocation for this facility. Centrus has two years from that date to provide evidence that the requirements of the credit have been met thus certifying our credit allocation. Upon certification of our credit allocation, we then have two years from that date to notify the DOE that the qualified investment in eligible property is placed in service to receive the credit allocation.
Section 6418 was added to the Code as part of the IRA and allows certain eligible taxpayers to elect to transfer certain clean energy tax credits to unrelated taxpayers for cash rather than use the credits to offset their U.S. federal income tax liability. The Company expects that we will be able to monetize all credit allocations received from §48C by transferring them to unrelated taxpayers for cash. It is uncertain how Executive Order 14154 will impact the IRS determination regarding our application request.
Defined Benefit Pension Plans
On October 12, 2023, the Company entered into an agreement with an insurer ("Insurer") for one of its defined benefit plans to purchase a group annuity contract and transferred approximately $186.5 million of its pension plan obligations to the Insurer. The purchase of the group annuity contract was funded directly by assets of the pension plan of approximately $171.4 million. The purchase resulted in a transfer of benefit administrative responsibilities for approximately 1,400 beneficiaries effective December 1, 2023. The Company recorded income related to the pension settlement in the fourth quarter of $28.6 million which was included in Nonoperating Components of Net Periodic Benefit Income in our Consolidated Statements of Operations.
On May 28, 2024, the Company entered into an agreement with a second insurer ("Second Insurer") for two of its defined benefit plans to purchase a group annuity contract and transferred approximately $234.0 million of its pension plan obligations to the Second Insurer. The purchase of the group annuity contract was funded directly by the assets of the pension plan of approximately $224.0 million. The purchase resulted in a transfer of future benefit obligations and administrative responsibilities for more than 1,000 beneficiaries effective September 1, 2024.
During the third quarter of 2024, the Company transferred $15.4 million of pension plan assets and the related obligations under two participating group annuity contracts to two non-participating group additional agreements for two of its defined benefit plans. The purchase resulted in a transfer of future benefit obligations and administrative responsibilities for more than 400 beneficiaries effective October 1, 2024.
The Company recognized income in 2024 related to these events of $16.8 million, which was included in Nonoperating Components of Net Periodic Benefit Incomein the Consolidated Statements of Operations.
Potential Transactions
We are also actively considering, and expect to consider potential strategic transactions from time to time, which at any given time may be in various stages of discussions, diligence, or negotiation. These could involve, without limitation, acquisitions and/or dispositions of businesses or assets, joint ventures or investments in businesses, products or technologies, or changes to our capital structure. In connection with any such transaction, we would seek to satisfy these needs through a combination of working capital, cash generated from operations, or additional debt or equity financing.
Cash Flow
The change in cash, cash equivalents and restricted cash from our Consolidated Statements of Cash Flows are as follows on a summarized basis (in millions):
Year Ended December 31,
2025 2024
Cash provided by operating activities $ 51.0 $ 37.0
Cash used in investing activities (19.7) (4.1)
Cash provided by financing activities
1,224.9 437.1
Effect of exchange rate changes on cash, cash equivalents and restricted cash (0.1) 0.2
Increase in cash, cash equivalents and restricted cash $ 1,256.1 $ 470.2
Operating Activities
During 2025, net cash provided by operating activities was $51.0 million. The net increase was primarily attributable to approximately $450.0 million in cash collections, the majority of which was from customers. These cash inflows were partially offset by approximately $401.0 million of disbursements for operations, of which approximately $338.0 million relates to payments for LEU inventory deliveries and cash outflows for the Technical Solutions segment, with the remaining disbursements including corporate administration, benefits claims, and advanced technology costs.
During 2024, net cash provided by operating activities was $37.0 million. The net increase was primarily due to approximately $348.0 million in cash collections, the majority of which was from customers. These cash inflows were partially offset by approximately $310.0 million of disbursements for operations, of which approximately $239.0 million relates to payments for LEU inventory deliveries and cash outflows for the Technical Solutions segment, with the remaining disbursements including corporate administration, benefit claims, and advance technology costs.
Investing Activities
For the year ended December 31, 2025 and 2024, investing activities consisted of capital expenditures of $19.7 million and $4.1 million, respectively.
Financing Activities
For the year ended December 31, 2025 and 2024, cash of $782.4 million and $388.7 million was provided from net proceeds related to the issuance of the 0% Convertible Notes and 2.25% Convertible Notes, respectively. Refer to Note 8,Debt,of the Consolidated Financial Statements in Part IV of this Annual Report regarding the accounting for the 0% Convertible Notes and 2.25% Convertible Notes.
For the year ended December 31, 2025 and 2024, cash of $523.7 million and $54.7 million, respectively, was provided from the net proceeds related to the issuance of 2,866,261 and 933,987 shares, respectively, of Class A Common Stock under ATM offerings. For additional information on the ATM offerings, see Note 16.,Stockholders' Equity.
Pursuant to a redemption notice, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the principal amount of $74.3 million, plus accrued and unpaid interest. For the year ended December 31, 2025 and 2024, annual payments of $3.5 million and $6.1 million, respectively of interest classified as debt are classified as a financing activity. Refer to Note 8,Debt,of the Consolidated Financial Statements in Part IV of this Annual Report regarding the accounting for the 8.25% Notes.
Working Capital
The following table summarizes the Company's working capital (in millions):
December 31,
2025 2024
Cash and cash equivalents $ 1,957.2 $ 671.4
Accounts receivable 30.7 80.0
Inventories, net 130.2 145.4
Current debt - (6.1)
Deferred revenue and advances from customers, net of deferred costs (90.2) (152.5)
Other current assets and liabilities, net (87.1) (69.8)
Working capital $ 1,940.8 $ 668.4
We are managing our working capital to seek to improve the long-term value of our LEU and Technical Solutions segments and are planning to continue funding the Company's qualified pension plans because we believe these uses of working capital are in the best interest of all stakeholders. We expect that any other uses of working capital will be undertaken in light of these strategic priorities and will be based on the Company's determination as to the relative strength of its operating performance and prospects, financial position, and expected liquidity requirements. In addition, we expect that any such other uses of working capital will be subject to compliance with contractual restrictions to which the Company and its subsidiaries are subject. We continually evaluate alternatives to manage our capital structure, and may opportunistically repurchase, exchange, or redeem Company securities from time to time.
0% Convertible Notes
On August 18, 2025, the Company issued, in a Rule 144A offering, the 0% Convertible Notes with an aggregate principal amount of $805.0 million, due August 15, 2032, unless earlier repurchased, redeemed or converted. There are no required principal payments prior to the maturity of the 0% Convertible Notes. The 0% Convertible Notes do not bear regular interest, and the principal amount of the notes will not accrete. The Company incurred approximately $22.5 million in issuance costs for the issuance of the 0% Convertible Notes. Additional terms and conditions of the 0% Convertible Notes are described in Note 8,Debt, of the Consolidated Financial Statements in Part IV of this Annual Report.
2.25% Convertible Notes
On November 7, 2024, the Company issued, in a Rule 144A offering, 2.25% Convertible Notes with an aggregate principal amount of $402.5 million, due November 1, 2030, unless earlier repurchased, redeemed or converted. There are no required principal payments prior to the maturity of the 2.25% Convertible Notes. The 2.25% Convertible Notes bear interest at an annual rate of 2.25%, payable semi-annually in arrears on May 1 and November 1 of each year, beginning on May 1, 2025. The Company incurred approximately $13.8 million in issuance costs for the issuance of the 2.25% Convertible Notes. Additional terms and conditions of the 2.25% Convertible Notes are described in Note 8,Debt, of the Consolidated Financial Statements in Part IV of this Annual Report.
The proceeds from both the 2.25% Convertible Notes and the 0.0% Convertible Notes will be used for general working capital and corporate purposes, which may include investment in technology development or deployment, repayment or repurchase of outstanding debt, capital expenditures, potential acquisitions and other business opportunities and purposes.
On June 30, September 30, and December 31, 2025, the Company provided notice to the holders of the 2.25% Convertible Notes that the notes became convertible at the option of the holders beginning on the first day of the respective subsequent quarter, and ending at the close of business on the last day of said quarter. The notes are convertible at a conversion rate of 10.2564 shares of Class A Common Stock per $1,000 principal amount of notes, which is equivalent to a conversion price of approximately $97.50 per share of Class A Common Stock. The 2.25% Convertible Notes became convertible because the last reported sale price of shares of the Class A Common Stock, for at least 20 trading days during the period of 30 consecutive trading days ending on, and including, the last trading day of each of the three calendar quarters, was greater than 130% of the conversion price in effect on each applicable trading day.
8.25% Notes
Pursuant to a notice of redemption issued on February 24, 2025, on March 26, 2025, the Company redeemed all 8.25% Notes at a redemption price equal to 100% of the $74.3 million aggregate principal amount, together with any accrued and unpaid interest. The Company recorded a gain of $11.8 million to Extinguishment of Long-Term Debtin the Consolidated Statements of Operations. As of December 31, 2025, none of the 8.25% Notes remained outstanding.
2025 Shelf Registration
The Company filed an automatic shelf registration statement on Form S-3 (File No. 333-291305) with the SEC on November 6, 2025, which was supplemented by a prospectus supplement dated November 6, 2025. Pursuant to these filings, the Company may offer and sell up to $1.0 billion in securities, in aggregate. The Company retains broad discretion over the use of the net proceeds from the sale of the securities offered.
2023 Shelf Registration
The Company filed a shelf registration statement on Form S-3 (File No. 333-272984) with the SEC on June 28, 2023, which became effective on July 10, 2023, and was supplemented by prospectus supplement dated February 9, 2024, and May 9, 2025, respectively. Pursuant to this shelf registration statement, the Company could offer and sell up to $200.0 million in securities, in aggregate. The Company retains broad discretion over the use of the net proceeds from the sale of the securities offered.
Common Stock Issuance
Pursuant to a sales agreement with its agents, the Company sold through ATM offerings an aggregate of 2,866,261 shares, 933,987 shares, and 722,568 shares of its Class A Common Stock for a total of $533.6 million, $56.7 million, and $24.4 million in 2025, 2024, and 2023, respectively. After expenses and commissions paid to the agents, the Company's 2025, 2024, and 2023, proceeds totaled $524.7 million, $55.1 million, and $23.4 million, respectively. Additionally, the Company recorded direct costs of $1.0 million, $0.3 million, and $0.2 million related to the issuance in 2025, 2024, and 2023, respectively. The shares of Class A Common Stock were issued pursuant to (a) the Company's automatic shelf registration on Form S-3 (File No. 333-291305) and a prospectus supplement dated November 6, 2025, (b) the Company's shelf registration statement on Form S-3 (File No. 333-272984), which became effective on July 10, 2023, and a prospectus supplement dated February 9, 2024 and (c ) the Company's shelf registration statement on Form S-3 (File No. 333-239242), which became effective on August 5, 2020, and two prospectus supplements dated December 31, 2020 and December 5, 2022. The Company has used and/or intends to use the net proceeds from these offerings for working capital and general corporate purposes including, but not limited to, capital expenditures, working capital, investment in technology development and deployment, repayment of indebtedness, potential acquisitions and other business opportunities.
Rights Agreement
The Company is party to a Section 382 Rights Agreement, dated as of April 6, 2016, by and among the Company, and Computershare Trust Company, N.A. and Computershare Inc., as rights agent, as amended by (i) the First Amendment to the Rights Agreement dated as of February 14, 2017; (ii) the Second Amendment to the Rights Agreement dated as of April 3, 2019; (iii) the Third Amendment to the Rights Agreement dated as of April 13, 2020; (iv) the Fourth Amendment to the Rights Agreement dated as of June 16, 2021; (v) the Fifth Amendment to the Rights Agreement dated as of June 20, 2023, and (vi) the Sixth Amendment to the Rights Agreement dated as of May 28, 2024.
The Fifth Amendment to the Rights Agreement (i) increased the purchase price for each one one-thousandth (1/1000th) of a share of the Company's Series A Participating Cumulative Preferred Stock, par value $1.00 per share, from $18.00 to $160.38, and (ii) extended the Final Expiration Date (as defined in the Rights Agreement) from June 30, 2023 to June 30, 2026.
The Section 382 Rights Agreement was adopted in order to preserve for the Company's stockholders the long-term value of the Company's net operating loss carryforwards for United States federal income tax purposes and other tax benefits. The Section 382 Rights Agreement was not adopted as a result of or in response to, any effort to acquire control of the Company.
Contractual Commitments
As of December 31, 2025, Centrus had contractual commitments to repay debt, make interest payments under its debt, make payments under operating leases, settle obligations related to agreements to purchase goods and services and settle tax and other liabilities.
Centrus has obligations related to our 0% Convertible Notes that mature in August 2032 and our 2.25% Convertible Notes that mature in November 2030, as discussed above. We are also obligated to make payments under operating leases that expire at various dates through 2027. Refer to Note 9, Leases, of the Consolidated Financial Statements in Part IV of this Annual Report for further information.
In our Technical Solutions segment, the majority of our contractual commitments were entered into as a result of contracts we have with our U.S. government customers. The U.S. government generally would be required to pay us for any costs we incur relative to these commitments if they were to terminate the related contracts "for convenience" under the FAR, subject to available funding. This also would be true in cases where we perform subcontract work for a prime contractor under a U.S. government contract. The termination for convenience language also may be included in contracts with foreign, state and local governments. We also have contracts with customers that do not include termination for convenience provisions, including contracts with commercial customers.
In our LEU segment, we have long-term inventory purchase agreements with TENEX and Orano that extend to 2028 and 2030, respectively. Refer to Note 17, Commitments and Contingencies,of the Consolidated Financial Statements in Part IV of this Annual Report for additional information. In addition, Centrus has entered into multiple inventory loans that we expect to repay in 2026. Refer to Note 4, Inventories,of the Consolidated Financial Statements in Part IV of this Annual Report for additional information.
On February 9, 2026, the Company and Fluor, a third-party contractor, entered into an agreement for the commercial expansion and deployment of LEU and HALEU production capability at the American Centrifuge Plant (ACP) in Piketon, Ohio. The contract provides for compensation on a time and materials basis at agreed labor rates and extends until the completion of performance. The total price paid to the Contractor will depend on the scope of the services authorized by the ACO, in accordance with the terms of the contract. For further details, refer to Part II, Item 7, Overview.
DOE Technology License
We have a non-exclusive license in DOE inventions that pertain to enriching uranium using gas centrifuge technology. The license agreement with the DOE provides for annual royalty payments based on a varying percentage (1% up to 2%) of our annual revenues from sales of the SWU component of LEU produced by the Company using DOE centrifuge technology. There is a minimum annual royalty payment of $100,000 and the maximum cumulative royalty over the life of the license is $100.0 million. There is currently no commercial enrichment facility producing LEU using DOE centrifuge technology. We are continuing to advance our U.S. centrifuge technology that has evolved from DOE inventions at specialized facilities in Oak Ridge, Tennessee with a view to deploying a commercial enrichment facility over the long term.
Off-Balance Sheet Arrangements
Other than our SWU purchase commitments and the license agreement with the DOE relating to the American Centrifuge technology, there were no material off-balance sheet arrangements at December 31, 2025.
New Accounting Standards
Reference is made to New Accounting Standardsin Note 1,Summary of Significant Accounting Policies,of the Consolidated Financial Statements in Part IV of this Annual Report for information on new accounting standards.
Centrus Energy Corp. published this content on February 11, 2026, and is solely responsible for the information contained herein. Distributed via EDGAR on February 11, 2026 at 12:27 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]