With the goal of improving the reliability and accessibility of the T for all riders, the MBTA today announced major construction work will continue in December to upgrade and enhance the subway and Commuter Rail system.
Riders can find more information on service changes through in-station signage, in-station public announcements, and at MBTA.com/PlannedWork.
On the Green Line
-
Green Line Central Tunnel Modernization:
At over 100 years old, the MBTA's Green Line signal system is being replaced with upgraded, modern technology that will provide improved train detection, better management of train congestion within the tunnel, and more consistent train spacing, which provides the foundation for improved service frequency. These operational improvements mean more reliable service for riders with fewer unplanned disruptions and emergency repairs caused by the older, aging signal system. Compatible with the upcoming fleet of new Type 10 Green Line cars, these signal upgrades also help prepare the MBTA for future generations of riders.
Building on previous work over the last several months, specific work taking place during four days in December will include the installation of signal cables, fiber optics, and new junction boxes. With the new fleet of Type 10 cars soon arriving, crews will also accomplish modifications to switches, curbs, and platform edges at stations to provide clearance for the new larger vehicles. To maximize the unencumbered access to the track area, a number of critical piggyback projects will also take place.
To accomplish this work, Green Line service will be suspended between North Station and Babcock Street on the B branch, St. Mary's on the C branch, Brookline Hills on the D branch, and Heath Street on the E Branch for four consecutive days, December 4 - 7.
-
-
Free and accessible shuttle bus service will be available as an alternative with connections to parallel Orange Line service at Back Bay downtown. The Route 39 will replace E Branch service. Fare-free Commuter Rail service will also be available in some areas. Riders should budget an additional 35 minutes of travel time. Accessible van service will also be available at downtown Boston stations only.
-
Full alternate service information, including shuttle bus stop locations, accessibility information, and more, is available at MBTA.com/PlannedWork and MBTA.com/Alerts.
-
Green Line Accessibility Upgrades:
As previously announced, Symphony Station remains closed until spring 2029 to advance major accessibility upgrades at the station, including the installation of four new elevators and many other station enhancements. During this time, Green Line E branch trains are bypassing Symphony (meaning trolleys will operate through the station in both directions, but do not stop).
- Full alternate service information is available at MBTA.com/PlannedWork and MBTA.com/Alerts.
In December, work will continue as part of the Green Line C Branch Accessibility Improvements project. The MBTA is advancing critical accessibility improvements at above-ground stations on the C Branch, which will provide a faster and more comfortable boarding experience for all riders. As a result, Green Line C branch trains will continue to bypass some street-level stops next month.
- Green Line trains will not stop at Hawes Street in the inbound direction through December 10.
- Green Line trains will not stop at Summit Avenue in the inbound direction through December 10.
- Full alternate service information is available at MBTA.com/PlannedWork and MBTA.com/Alerts.
On the Blue Line
-
Continuous Track and Infrastructure Modernization:
During nine days in December, the MBTA will continue essential infrastructure upgrades, track renewal, and other critical revitalization work on the Blue Line between Bowdoin and Orient Heights, including full-depth track reconstruction, the replacement of ties and rail, and rail resurfacing. This regular, planned renewal and revitalization work is necessary, builds upon the progress made during the 2024 Track Improvement Program, and is ongoing and continuous, ensuring the long-term stability of our infrastructure and preserving the system for future generations of riders.
To accomplish this work, Blue Line service will be suspended between Bowdoin and Orient Heights for nine consecutive days, December 12 - 20.
-
-
Free and accessible shuttle bus service will be available as an alternative from Orient Heights to Haymarket downtown for connections to parallel Orange and Green Line service. Riders should budget an additional 40 minutes of travel time. Accessible van service will also be available in downtown Boston only.
-
Full alternate service information, including shuttle bus stop locations, accessibility information, and more, is available at MBTA.com/PlannedWork and MBTA.com/Alerts.
-
The MBTA will host a virtual public meeting to discuss the Blue Line revitalization work taking place and service alternatives on November 30, 2026. Members of the public are welcome and encouraged to participate. More information will be available soon at MBTA.com/Events.
On the Framingham/Worcester Commuter Rail Line
-
Worcester Line Track and Signal Improvements:
In December, the MBTA will perform critical work on the Framingham/Worcester Line as part of Worcester Line track and signal improvements. The MBTA continues to invest in its Commuter Rail infrastructure to help keep service safe, reliable, and efficient. As a result, Framingham/Worcester Line service will be suspended between Framingham and South Station for three consecutive days, December 4 - 6.
-
Free and accessible shuttle bus service will replace train service between Framingham and South Station. There will be four shuttle routes available during this closure. Riders should budget at least 30 minutes of travel time.
-
Full alternate service information, including shuttle bus stop locations, accessibility information, and more, is available at MBTA.com/Alerts.
On the Needham Commuter Rail Line
-
MassDOT West Roxbury Parkway Bridge Replacement Project:
The MBTA is supporting MassDOT work in December as part of the West Roxbury Parkway Bridge Replacement project, which will replace the bridge that carries the West Roxbury Parkway over the Needham Line. As a result, Needham Line service will be suspended between Needham Heights and South Station beginning at approximately 11 PM through the end of service on December 4 and continuing through the weekend of December 5 - 6.
-
There will be no shuttle bus service alternative. Passengers can instead use existing area bus routes as an alternative, including Bus Routes 35, 36, 37, and 59. Passengers should budget at least 35 minutes of extra travel time in addition to their regular trip time.
-
Full alternate service information, including shuttle bus stop locations, accessibility information, and more, is available at MBTA.com/Alerts.
Significance of Multi-Day Outages
The MBTA is reminding riders that service outages such as these are a critical and necessary part of maintaining the infrastructure improvements that took place as part of the 2024 Track Improvement Program while also making further system upgrades and modernizing the MBTA's infrastructure. This work cannot be performed during the overnight hours when the MBTA does not operate, and would be extremely inefficient and costly if planned during single weekend outages.
Closing a section of the transit system for multiple days is the most efficient way to perform the MBTA's routine maintenance, revitalization efforts, inspections, and upgrade work, and combines the efforts of multiple contractors and the MBTA workforce around the clock 24/7 to maximize productivity. This work is necessary and continuous to maintain the reliable service riders count on.