Connecticut Department of Transportation

06/09/2026 | Press release | Distributed by Public on 06/09/2026 13:38

Subsurface Exploration in Hamden and North Haven

Subsurface Exploration in Hamden and North Haven

6/09/2026

The Connecticut Department of Transportation announced today that a subsurface exploration will be taking place on Route 15 in the area of Exit 51 in Hamden and North Haven. This is a stationary operation of investigating the soil, rock, and groundwater conditions beneath a construction site.

DETOUR/LANE CLOSURE INFO
There will be lane closures of the right lane and right shoulder on Route 15 in Hamden/North Haven near Exit 51 including ramps from 9:00 a.m. to 3:00 p.m. between the dates of June 11 and June 26, 2026, Monday through Friday

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. Motorists are advised to maintain a safe speed when driving through the work area.

Media Contact:

Connecticut Department of Transportation published this content on June 09, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on June 09, 2026 at 19:38 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]