City of Waverly, IA

07/28/2026 | News release | Distributed by Public on 07/28/2026 13:08

Sanitary Sewer Lining Project Starting

posted in Public Works on July 28, 2026

Contractors are in Waverly starting preparations for the sanitary sewer cured-in-place pipe (CIPP) lining project this week.

CIPP lining is a trenchless sewer repair method used to fix damaged underground sewer pipes without excavation. CIPP is a technology that creates a new, seamless "pipe within a pipe" by inserting a resin-soaked liner into an existing sewer line, inflating it, and curing it so it hardens in place.

Once cured, it becomes a strong, joint-free replacement pipe that should last from 60-100 years, depending on conditions. All processes and procedures for installation are approved by the Environmental Protection Agency (EPA) and Occupational Safety and Health Administration (OSHA) and follow established guidelines.

The project is slated to continue through late fall. Visit www.waverlyia.com/CIPP26 to view the project area map. Work should have minimal impact on residents.

City of Waverly, IA published this content on July 28, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on July 28, 2026 at 19:08 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]