City of Dunwoody, GA

11/23/2026 | News release | Distributed by Public on 11/23/2026 10:40

Dunwoody seeks input on Springwood Park concepts

Dunwoody, GA - November 23, 2026 - The City of Dunwoody invites the community to attend a public input meeting for Springwood Park, a planned 5.47-acre park at 249 Perimeter Center Parkway. The meeting will be held from 4 to 6 p.m. on Tuesday, December 8, at Campus 244, located at 244 Perimeter Center Parkway NE. This informal, drop-in meeting will give attendees an opportunity to review preliminary park concepts, speak with the project team, and share feedback.

Springwood Park was identified as a priority in the 2018 Connecting Dunwoody Placemaking Plan, where it was referred to as the Flyover Bridge Park. The project will repurpose unused greenspace in Dunwoody's Perimeter into a pedestrian- and bicycle-friendly destination.

"Springwood Park presents an opportunity to transform an underused greenspace into a distinctive public destination," said Dunwoody Parks and Recreation Director Rachel Waldron. "Community input will help the City determine how this park can best serve residents, employees, and visitors in Perimeter."

Public feedback will guide the park's design and future development. A key consideration is the property's steep topography, which requires a balance between preserving the existing terrain and creating safe, accessible public spaces. Two concepts are being evaluated:

  • Concept 1 includes an elevated urban plaza at the corner of Springwood Connector and Perimeter Center Parkway NE, featuring seating, an architectural canopy, public art opportunities, and a skybridge overlook with views of the existing stream. The concept also includes a switchback pathway to an open lawn, boardwalk, and future trail connection.
  • Concept 2 includes all elements of Concept 1, along with an elevated skybridge following the existing tree line. The skybridge would connect the main plaza with two additional smaller plazas, creating a series of elevated gathering spaces throughout the park.

Residents can also review the concepts and provide comments online through December 18: https://bit.ly/springwoodpark. Funding has been allocated in the City's five-year Capital Improvement Program for construction beginning in 2029 or 2030.

# # #

For more information regarding the City of Dunwoody, please contact Jennifer Boettcher, Communications Director: 678.382.6881, email.

City of Dunwoody, GA published this content on November 23, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 23, 2026 at 16:40 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]