City of Raleigh, NC

05/14/2025 | Press release | Distributed by Public on 05/14/2025 09:47

Big Branch Greenway Connector - Open House and Online Survey!

You're invited to participate in the Big Branch Greenway Connector Phase 2 project!

Join us at our upcoming open house or share your input through the online survey.

At the open house, we'll present three proposed route options for the segment between Six Forks Road and Wake Towne Drive:

  • A streamside alignment along the west side of Big Branch
  • A roadside option along Plantation Road and Belvin Drive
  • A second roadside option along Plantation Road and Hines Drive

City staff will be available to answer questions and gather feedback.

Open House Details

  • Wednesday, June 4 from 4 to 7 p.m.
    Five Points Center for Active Adults
    2000 Noble Road, Raleigh, NC 27608

To learn more or take the online survey, visit the Big Branch Greenway Connector project page.

Print
City of Raleigh, NC published this content on May 14, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 14, 2025 at 15:47 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at support@pubt.io