Results

City of Greensboro, NC

03/19/2026 | Press release | Distributed by Public on 03/19/2026 10:56

Annual City Paving Projects Continue March 23-27

Sections of streets will undergo various stages of resurfacing that will affect traffic flow in those areas. Specific streets affected, and for what work, are listed below. These jobs are part of the City's 2026 road paving projects and publicized weekly.

Projects happening from March 23-27

The following will involve alternate lanes or full road closures from 7 am to 6 pm.

  • Merry Oaks Ct. from Ironwood Circle to the end - Milling and raising structures

  • Silverwood Ct. from Ironwood Circle to the end - Milling and raising structures

  • Birkdale Dr. from Muirfield Dr. to Cardinal Ridge Dr. - Milling and raising structures

  • Cedar Bend Ct. from Poplar Grove Trail to the end - Milling and raising structures

  • All of Ironwood Circle - Milling and raising structures

  • Oak Bend Trail from Poplar Grove Trail to Old Oak Ridge Rd. - Milling and raising structures

  • Olympic Ct. from Birkdale Dr. to the end - Milling and raising structures

  • Spyglass Dr. from Cardinal Ridge Dr. to Muirfield Dr. - Milling and raising structures

  • Adonica Ln. from Giovanni Way to Champagne Dr. - Milling

  • Bald Eagle Dr. from Hanberry Dr. to the end - Milling

  • Champagne Dr. from Giovanni Way to Adonica Ln. - Milling

  • Giovanni Way from Merlot Way to the end - Milling

  • Hanberry Dr. from Horse Pen Creek Rd. to the end - Milling

  • All of Merlot Way - Milling

  • Patrick James Way from Giovanni Way to Merlot Way - Milling

  • Technology Dr. from Bryan Park Rd. to the end - Milling

  • Lake Herman Dr. from Corporate Park Dr. to Technology Dr. - Milling

  • Avery Place from Pembroke Rd. to Fairway Dr. - Lowering structures

  • Fairway Dr. from Benjamin Parkway to Pembroke Rd. - Lowering structures

  • Pinecrest Rd. from Ridgeway Dr. to W. Greenway Dr. N. - Lowering structures

  • Ridgeway Dr. from W. Friendly Ave. to W. Market St. - Lowering structures

  • Scott Ave. from Camden Rd. to Oakland Ave. - Lowering structures

  • Wright Ave. from S. Elam Ave. to S. Josephine Boyd St. - Lowering structures

  • Sternberger Place from Commerce Place to N. Eugene St. - Curb ramps

  • Commerce Place from W. Friendly Ave. to Bellemeade St. - Curb ramps

  • W. February One Place from S. Greene St. to S. Elm St. - Curb ramps

These will be alternate lanes or full road closures from 9 am to 4 pm

  • Benjamin Parkway from W. Wendover Ave. to Westmoreland Dr. - Lowering structures

  • W. Friendly Ave from Green Valley Rd. to N. Holden Rd. - Lowering structures

  • Eugene St. from W. Gate City Blvd. to Bellemeade St. - Curb ramps

Motorists are encouraged to use alternate routes to avoid work areas, follow detour signs, and adhere to traffic flagger directions.

Work schedules for each job depend on weather conditions and material/equipment availability.

Visit https://www.greensboro-nc.gov/RoadProjects to learn more about lane and road closures and subscribe to receive email notifications about upcoming work on City streets.

City of Greensboro, NC published this content on March 19, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on March 19, 2026 at 16:56 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]