The eRulemaking Program

07/21/2025 | Press release | Distributed by Public on 07/21/2025 07:13

Preliminary Determination of a Qualifying Conduit Hydropower Facility: Rancho California Water District

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CD25-11-000]

Rancho California Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To Intervene

On July 8, 2025, Rancho California Water District filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act (FPA). The proposed Washington Avenue In-Line Turbine Generator Hydroelectric Project would have an installed capacity of 105 kilowatts (kW) and would be located at the Santa Rosa Water Reclamation Facility, in Murrieta, Riverside County, California.

Applicant Contact: Michael Guirguis, LEE & RO, Inc., 1199 Fullerton Road, City of Industry, CA 91748, 626-912-3391, Michael.Guirguis@lee-ro.com.

FERC Contact: Christopher Chaney, 202-502-6778, christopher.chaney@ferc.gov.

Qualifying Conduit Hydropower Facility Description: The project would consist of: (1) one turbine generating unit with a capacity of 105 kW and (2) appurtenant facilities.

A qualifying conduit hydropower facility is one that is determined or deemed to meet all the criteria shown in the table below.

Table 1-Criteria for Qualifying Conduit Hydropower Facility
Statutory provision Description Satisfies (Y/N)
FPA 30(a)(3)(A) The conduit the facility uses is a tunnel, canal, pipeline, aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the distribution of water for agricultural, municipal, or industrial consumption and not primarily for the generation of electricity Y
FPA 30(a)(3)(C)(i) The facility is constructed, operated, or maintained for the generation of electric power and uses for such generation only the hydroelectric potential of a non-federally owned conduit Y
FPA 30(a)(3)(C)(ii) The facility has an installed capacity that does not exceed 40 megawatts Y
FPA 30(a)(3)(C)(iii) On or before August 9, 2013, the facility is not licensed, or exempted from the licensing requirements of Part I of the FPA Y

Preliminary Determination: The proposed Washington Avenue In-Line Turbine Generator Hydroelectric Project will not alter the primary purpose of the conduit, which is for municipal use. Therefore, based upon the above criteria, Commission staff preliminarily determines that the operation of the project described above satisfies the requirements for a qualifying conduit hydropower facility, which is not required to be licensed or exempted from licensing.

Comments and Motions to Intervene: Deadline for filing comments, comments contesting whether the facility meets the qualifying criteria, and motions to intervene: August 15, 2025.

Anyone may submit comments or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210 and 385.214. Any motions to intervene must be received on or before the specified deadline date for the particular proceeding.

Filing and Service of Responsive Documents: All filings must (1) bear in all capital letters the "COMMENTS," "COMMENTS CONTESTING QUALIFICATION FOR A CONDUIT HYDROPOWER FACILITY," or "MOTION TO INTERVENE," as applicable; (2) state in the heading the name of the applicant and the project number of the application to which the filing responds; (3) state the name, address, and telephone number of the person filing; and (4) otherwise comply with the requirements of sections 385.2001 through 385.2005 of the Commission's regulations. (1) All comments contesting Commission staff's preliminary determination that the facility meets the qualifying criteria must set forth their evidentiary basis.

The Commission's Office of Public Participation (OPP) supports meaningful public engagement and participation in Commission proceedings. OPP can help members of the public, including landowners, community organizations, Tribal members and others, access publicly available information and navigate Commission processes. For public inquiries and assistance with making filings such as comments or motions to intervene, the public is encouraged to contact OPP at (202) 502-6595 or OPP@ferc.gov.

The Commission strongly encourages electronic filing. Please file motions to intervene and comments using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, you may send a paper copy. Submissions sent via the U.S. Postal Service must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Debbie-Anne A. Reese, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, MD 20852. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 385.2010.

Locations of Notice of Intent: The Commission provides all interested persons an opportunity to view and/or print the contents of this document via the internet through the Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number ( i.e., CD25-11) in the docket number field to access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. Copies of the notice of intent can be obtained directly from the applicant. For assistance, call toll-free 1-866-208-3676 or email FERCOnlineSupport@ferc.gov. For TTY, call (202) 502-8659.

Dated: July 16, 2025.
Debbie-Anne A. Reese,
Secretary.
[FR Doc. 2025-13619 Filed 7-18-25; 8:45 am]
BILLING CODE 6717-01-P

Footnotes

(1)  18 CFR 385.2001-2005 (2024).

The eRulemaking Program published this content on July 21, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on July 21, 2025 at 13:14 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at support@pubt.io