Georgia Department of Transportation

02/20/2026 | Press release | Distributed by Public on 02/20/2026 16:54

Weekly Lane Closure Advisory on the I-285/I-20 East Interchange Project

View this email in your browser
Lane Closure Advisory on the I-285/I-20 East Interchange Project

What: Weather permitting, the Georgia Department of Transportation (Georgia DOT) construction partners will temporarily close interstate lanes at the locations below for the I-285/I-20 East Interchange project. The project will reconstruct the interstate system-to-system ramps at the I-285/I-20 East Interchange and add a combination of collector-distributor (CD), or connecting lanes, and auxiliary lanes along I-20 east of the interchange and I-285 north of the interchange.

Where/When: Traffic impacts on the I-285/I-20 Interchange project from Friday, February 20, 2026, through Friday, February 27, 2026.

DAYTIME CLOSURES:
Friday, February 20, through Friday, February 27, from 9 a.m. to 2 p.m.

  • I-20 Eastbound: Single, right- or left-lane and shoulder closure from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)
  • I-20 Eastbound: Single, right- or left- lane and shoulder closure from Columbia Drive (MM 66.8) to Wesley Chapel Road (MM 69.5)
  • I-20 Eastbound: Single, right- or left-lane and shoulder closure from Panola Road (MM 71.4) to Fairington Road (MM 72.8)

Friday, February 20, through Friday, February 27, from9 a.m. to 4 p.m.
  • Hillandale Drive at DeKalb Medical Parkway: Flagging operation

Friday, February 20, through Friday, February 27, from 9 a.m. to 4 p.m.
  • Miller Road over I-20: Flagging operation

OVERNIGHT CLOSURES AND TRAFFIC PACING:
Friday, February 20, through Friday, February 27, from 7 p.m. to 5 a.m.
  • I-20 Eastbound: Single to double, right- or left-lane and shoulder closure from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)
  • I-20 Eastbound (connecting lanes or CD lanes): Single to double, right- or left-lane and shoulder closure from I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.5)
  • I-20 Eastbound: Single to double, right- or left-lane and shoulder closure from Columbia Drive (MM 66.8) to Wesley Chapel Road (MM 69.5)
  • I-20 Eastbound to I-285 Northbound: Single to double, right- or left-lane, left- and right-lane closure
  • I-20 Eastbound: Single, right-lane closure on Wesley Chapel off-ramp
  • I-20 Eastbound: Single to double, right- or left-lane closure from Panola Road (MM 71.3) to Fairington Road overpass

Friday, February 20, through Friday, February 27, from 8p.m. to 5 a.m.
  • I-285 Southbound: Single to double, left- or right-lane closure from interchange to Columbia Drive
  • I-285 Southbound: Single to double, right-lane and shoulder closures from Glenwood to interchange
  • I-285 Northbound: Single to double, left- or right-lanes and shoulder closure from Columbia to interchange
  • I-285 Northbound: Single to double, left- or right-lanes and shoulder closure from -interchange to Glenwood

Friday, February 20, through Friday, February 27, from 9 p.m. to 5 a.m.
  • I-20 Westbound: Single to double, left-lane closure from Wesley Chapel Road (MM 69.5) to Columbia Drive (MM 66.8)
  • I-20 Westbound: Alternating, single, left- and right-lane and shoulder closure from Panola Road (MM 71.4) to Wesley Chapel Road (MM 68.5)
  • I-20 Westbound: Single to double, right- or left-lane closure from Fairington Road overpass to Panola Road (MM 71.3)
Activity Start Date End Date Times
I-20 Westbound
  • I-20 from Panola Road to Wesley Chapel Road
Single to double, right- or left-lane and shoulder closures February 20 February 27 9 p.m. - 5 a.m.
  • I-20 from Wesley Chapel to Columbia Drive
Single to double, left-lane closure February 20 February 27 9 p.m. - 5 a.m.
  • I-20 Westbound closure from Fairington Road overpass to Panola Road (MM 71.3)
Single to double, right- or left-lane February 20 February 27 9 p.m. - 5 a.m.
I-20 Eastbound
  • I-20 from Wesley Chapel Road to the Panola Road
Single, right-lane and shoulder closure February 20 February 27 9 a.m. - 2 p.m.
  • I-20 connecting (CD) lanes from the I-285 Interchange to Wesley Chapel Road
Single, right-lane and shoulder closure February 20 February 27 9 a.m. - 2 p.m.
  • I-20 from Columbia Drive to Wesley Chapel
Single, right- or left-lane and closure February 20 February 27 9 a.m. - 2 p.m.
  • I-20 from Wesley Chapel Road to Panola Road
Single to double, right-or left-lane and shoulder closure February 20 February 27 7 p.m. - 5 a.m.
  • I-20 connecting (CD) lanes from the I-285 Interchange to Wesley Chapel Road
Single to double, right- or left-lane and shoulder closure February 20 February 27 7 p.m. - 5 a.m.
  • I-20 Columbia Drive to Wesley Chapel Road
Single to double, right- and left-lane and shoulder closure February 20 February 27 7 p.m. - 5 a.m.
  • I-20 From Wesley Chapel Road to Panola Road
Traffic shift in all eastbound lanes February 20 February 27 7 p.m. - 5 a.m.
  • I-20 Eastbound to I-285 Northbound
Single to double, right- or left-lane, left- and right- lane closures February 20 February 27 7 p.m. - 5 a.m.
  • I-20 Eastbound closure on Wesley Chapel off-ramp
Single, right- lane closure February 20 February 27 8 p.m. - 5 a.m.
  • I-20 Eastbound closure from Panola Road (MM 71.3) to Fairington Road overpass
Single to double, right- or left-lane closure February 20 February 27 7 p.m. - 5 a.m.
I-285 Southbound
  • I-285 Southbound from interchange to Columbia Drive
Single to double, left-or right lane closure February 20 February 27 8 p.m. - 5 a.m.
  • From Glenwood Road to the I-20 Interchange
Single to double, and right-lane and shoulder closures February 20 February 27 8 p.m. - 5 a.m.
I-285 Northbound
  • From Columbia Drive to the I-20 Interchange
Single to double, left- or right-lanes and shoulder closure February 20 February 27 8 p.m. - 5 a.m.
  • From interchange to Glenwood
Single to double, left- or right-lanes and shoulder closure February 20 February 27 8 a.m. - 6 p.m.
Flagging Operation
Miller Road over I-20 Flagging operation February 20 February 27 9 a.m. - 4 p.m.
Hillandale Drive at DeKalb Medical Parkway Flagging operation February 20 February 27 9 a.m. - 4 p.m.
How do I learn more?
More information about the I-285/I-20 East Interchange project can be found at the link below.
Visit the Project Website
Stay Connected
Contact Georgia DOT by email at [email protected] or call the project hotline at 833-418-4357.
Advisory: Exact construction dates and times may change due to weather or other factors. Motorists are cautioned to reduce their speed while traveling through work zones. Pay attention and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit http://www.511ga.org/ or download the Georgia 511 app.
Like and follow us!
The information you provide to the Georgia Department of Transportation will be used solely by Georgia DOT. The Department does not sell or offer a subscriber's personal information to third parties for marketing purposes. To no longer receive this e-newsletter, please select "unsubscribe from this list" below.

If you have any questions or concerns, please feel free to send an email to [email protected]

Copyright © 2026 Georgia Department of Transportation, All rights reserved.
I-285/I-20 East Interchange Project

Our mailing address is:
Georgia Department of Transportation
600 W Peachtree St NW # 18
Atlanta, GA 30308-3607
Add us to your address book

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.
Georgia Department of Transportation published this content on February 20, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on February 20, 2026 at 22:54 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]