France's nuclear ambitions are in the news with an auditor's report describing financing challenges for the government's plans to build six pressurized water reactors, as well as the government's new strategy for advancing fusion energy.
Financing challenges: A report by France's Court of Auditors on government support for energy production has been published just weeks prior to EDF's expected final investment decision on six EPR2 units. According to its findings, the state-owned utility Électricité de France could have serious difficulties financing its planned construction of six reactors, which the auditor has estimated would cost a total of €84 billion (about $92.5 billion).
Construction of the EPR2 reactors, which were developed by EDF and Framatome, is scheduled to begin in 2027, with deployments slated for the French cities of Penly, Gravelines, and Bugey at sites where there currently are operating nuclear power plants. Each site is to have two EPR2 reactors. Penly is to be the initial deployment site, serving as a reference for the other two sites. First commercial operations are scheduled for 2038.
Last December, EDF estimated that the cost for building all six EPR2 reactors would be about €72.8 billion (approximately $80.1 billion). The French government agreed to grant a subsidized loan to EDF for the EPR2 program that covers 60 percent of the total program cost. The government also established a contract-for-difference mechanism with a strike price of no more than €100 per MWh, with the state providing payments to EDF whenever market prices fall below that level.
Unfavorable price scenarios: Because the newly estimated cost for the six EPR2 units is significantly higher than the previous estimates, the Court of Auditors pointed out in its report that should wholesale baseload electricity prices fall to unfavorable levels-less than €70 per MWh-"financing requirements for the construction of future EPR2 reactors would increase significantly. This would also constrain the [EDF] group's ability to fund the program without additional state contributions-beyond the subsidized loans already announced-a point highlighted by the Court in its recent report on EDF's economic model" (translated from the original French).
According to the report, wholesale baseload electricity prices for delivery in 2028 and 2029 are presently projected at €65.75/MWh and €60.10/MWh, respectively. Further, current electricity cost increases, which have been caused by energy-flow disruptions at the Strait of Hormuz and low natural gas storage levels in Europe, are expected to be short-lived.
The audit concluded that France's cheapest and most dependable low-carbon energy option would be extending the operational lifetimes of EDF's existing reactors to 60 years each.
National fusion strategy: During a visit to ITER and the French Alternative Energies and Atomic Energy Commission's (CEA's) WEST tokamak, France's minister for higher education, research, and space, Philippe Baptiste, unveiled the government's 10-year national strategy for advancing the research and development of fusion energy. The strategy centers on work with ITER, the WEST tokamak, and the Laser Mégajoule inertial confinement facility, and it envisions doubling the number of students in such relevant fields of study as plasma physics, nuclear engineering, and cryogenic technologies.
Overall, the new strategy seeks to coordinate research efforts, guide investment, and accelerate technological progress regarding fusion energy. According to Baptiste, from 2026 to 2030, the main goals will be consolidation of scientific and technological foundations, strengthening of expertise and experimental infrastructure, and securing of necessary funding. Subsequently, the strategy includes a target date of 2035 for the operation of a European pilot fusion power plant.
While at ITER, Baptiste said, "We all know the importance of working on fusion, on the future of energy in order to have an energy source that is available and also carbon-free. Not only are we strongly supporting ITER, which is a key asset, but we also want to develop national equipment that can also help provide some additional technologies that can be crucial for successful development."