City of Olympia, WA

09/16/2025 | Press release | Distributed by Public on 09/16/2025 12:41

09/16/2025 - Elliott Ave Sidewalk - Geotechnical Field Work

Geotechnical work on Elliott Avenue between Division Street and Crestline Boulevard
Starting on Monday, September 22, the City's consultant will conduct Geotechnical Investigation work on Elliott Avenue between Division Street and Crestline Boulevard. The work may include soil sampling, borings, corings and other necessary efforts. The work will be performed during daytime hours and should last for 3 days.

Travelers can expect lane restrictions and traffic delays and should choose an alternate route if possible. Flaggers will direct motorists, pedestrians, and cyclists through the area.
Contact
Brian Pilumalee, Project Engineer
Public Works Engineering
360.753.8297
[email protected]
City of Olympia, WA published this content on September 16, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on September 16, 2025 at 18:41 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]