Quarterly Report for Quarter Ending September 30, 2026 (Form 10-Q)

Management's Discussion and Analysis of Financial Condition and Results of Operations

The following discussion should be read together with our unaudited condensed consolidated financial statements and notes included elsewhere in this Quarterly Report on Form 10-Q and the audited consolidated financial statements and notes in our Annual Report on Form 10-K for the year ended December 31, 2025. This discussion contains forward-looking statements within the meaning of Section 27A of the Securities Act and Section 21E of the Exchange Act that are based on current expectations, estimates and assumptions and involve risks and uncertainties. Words such as "anticipate," "estimate," "plan," "project," "expect," "believe," "intend," "may," "will," "should" and "could" identify forward-looking statements. Actual results and the timing of events may differ materially from those anticipated as a result of the factors discussed in this report, in our Annual Report on Form 10-K and in our other SEC filings. These statements speak only as of the date of this report, and we undertake no obligation to update them except as required by law.

All dollar amounts are in U.S. dollars unless otherwise indicated. "We," "our," "us," "AIB" and the "Company" refer to AIB Data Centers Inc. (formerly BlockchAIn Digital Infrastructure, Inc.; name changed effective June 25, 2026) and its consolidated subsidiaries: One Blockchain LLC; One Blockchain Nolan LLC; Signing Day Sports, Inc. ("SGN"), which became a wholly owned subsidiary on March 16, 2026 in the Business Combination; AIB CLT1 LLC, formed June 23, 2026; and SFM644 LLC, acquired September 11, 2026.

Overview

We develop, own and operate digital infrastructure for AI hosting and high-performance computing ("HPC") colocation. Our operations are centered on our CLT1 campus, where we have approximately 65 megawatts ("MW") of contracted utility power under a 15-year electric service agreement (the "ESA") and have contracted 50 MW of critical IT to the CLT1 Customer under a 12-year Master Colocation Services Agreement (the "Colocation Agreement"). CLT1 is the repurposing of our existing 40 MW grid-interconnected facility, which historically provided hosting services to third-party bitcoin miners. We secure executed utility commitments before committing capital to vertical construction, and we intend to apply that discipline across our pipeline.

Our strategy is to develop right-sized AI/HPC campuses, generally 40 to 90 MW per project, for well-capitalized AI and cloud customers that can enter financeable long-term contracts. We concentrate on selected regions with a community first approach, and do not complete a site acquisition unless power is secured through an executed electric service, power purchase or facilities extension agreement. We use a repeatable design and common equipment specifications across sites to reduce avoidable complexity, and we intend to add simultaneous project commitments only as our delivery capability and liquidity allow.

We are in the development stage of our AI/HPC business. We de-energized the site's bitcoin hosting operations on June 5, 2026 and, other than approximately two weeks in September 2026 when the site was temporarily re-energized for one customer, have not resumed hosting. We have not commissioned any AI/HPC capacity, have not commenced service under the Colocation Agreement and have not recognized revenue under it. Our results for the periods presented therefore reflect the wind-down of legacy hosting together with pre-revenue development costs, and are not indicative of our expected results once CLT1 is commissioned.

Our principal priorities over the next twelve months are to:

(i) design, permit and build the two 25 MW data halls at CLT1 on the timeline required by the Colocation Agreement;
(ii) satisfy the conditions for release of the escrowed CLT1 Customer prepayments and arrange project-level financing;
(iii) advance development of our DFW1 site along with our other development sites; and
(iv) preserve corporate-level liquidity.

Key Milestones

Date Milestone
March 16, 2026 Business Combination with SGN completed, accounted for as a reverse merger; shares began trading on NYSE American on March 17 under "AIB."
May 27, 2026 Amended ESA executed: 65 MW contract demand, 15-year initial term, effective October 1, 2026.
June 5, 2026 Bitcoin hosting operations substantially de-energized.
June 8 and 17, 2026

Underwritten public offering of 38,333,333 shares at $1.65 per share ; gross proceeds of approximately $63.25 million; net cash proceeds of $59.0 million.

June 23-25, 2026 AIB CLT1 LLC formed as the CLT1 project entity; Company renamed AIB Data Centers Inc.
September 11, 2026 Acquired the Texas site ("DFW1"), approximately 55 MW.
September 25, 2026 AIB CLT1 LLC executed the Colocation Agreement with Nebius Inc. (announced September 30, 2026).
September 30, 2026

AIB DFW1 LLC formed as the DFW1 project entity.

October 20, 2026

Nebius Inc. deposited the fit-out charge and security deposit into escrow.

November 11, 2026 Board of Directors approved the formal wind-down of the Company's legacy bitcoin mining hosting operations.

Industry Overview

Demand for data center capacity has stepped up as hyperscale cloud providers, foundation-model developers and specialized AI cloud providers ("neoclouds") scale training and inference workloads. Power availability, rather than building or site features, has become the primary constraint on new capacity in most major U.S. markets: utility interconnection queues and transmission constraints have stretched lead times for large new loads to multiple years in a number of regions. Developers that can secure dedicated, deliverable power therefore hold an increasingly differentiated position.

Current-generation GPU deployments commonly require rack densities of approximately 40 kilowatts to well over 100 kilowatts, compared with roughly 5 to 15 kilowatts for legacy enterprise and colocation designs, which has driven adoption of liquid cooling, higher-capacity electrical distribution and purpose-built structures that most legacy facilities cannot economically accommodate. AI/HPC customers also increasingly contract for capacity on long terms, typically ten years or more, with fixed monthly charges, parent or affiliate credit support and prepayment, deposit or letter-of-credit mechanics that help underwrite construction.

Data centers are also drawing increased scrutiny from governments and communities over energy use, ratepayer impact, water and land use. Certain states and localities have adopted or proposed moratoria, large-load tariffs, cost-allocation mechanisms, interconnection study requirements and water-use restrictions. Texas, where DFW1 is located, enacted Senate Bill 6 in June 2025, which imposes requirements on large loads in ERCOT. These measures could increase our costs, delay development or limit expansion.

Development Portfolio and Pipeline

We have five named development sites in four U.S. metropolitan markets, totaling approximately 345 MW, of which approximately 120 MW is contracted utility power (CLT1 and DFW1). Only CLT1 is subject to a customer agreement. DFW1 is acquired and under current lease negotiations with prospective customers. The other three sites are under non-binding letters of intent, are not subject to definitive acquisition, lease or development agreements. Stage and timing vary by site and are subject to significant execution and financing risk.

We describe capacity using separate measures that are not additive: contracted utility power (executed utility agreements, measured at the utility connection), customer-contracted critical IT capacity (measured at the IT equipment, and lower), and energized capacity (power available today). At the date of this report, CLT1 has 65 MW of contracted utility power and 50 MW of customer-contracted critical IT capacity, and DFW1 has 15 MW energized and 40 MW contracted but not yet energized. DFW2 includes a 60 MW electric service agreement that would be acquired with the site. See "Related-Party Transactions" for GSO1 and MSP1.

Developing AI/HPC capacity is capital-intensive. We expect to fund development through customer prepayments and security under long-term contracts, project-level debt and preferred equity, other debt or equity financing and cash on hand, and, depending on the project, through purchases, ground leases, joint ventures or acquisitions. There can be no assurance that any site will be completed on the timeline or at the capacity currently anticipated, or at all.

Key Factors Affecting Our Financial Performance

Execution at CLT1 and under the Colocation Agreement

Our future revenue depends principally on delivering the CLT1 data halls on schedule and meeting service-level requirements under the Colocation Agreement. We expect substantially all of our revenue for the foreseeable future to come from a single customer, Nebius Inc. (the "CLT1 Customer"), supported by a guaranty from its parent company, Nebius Group N.V. Rent begins data hall by data hall upon completion and acceptance. We currently estimate Data Hall 1 will be delivered by the fourth quarter of 2027 and Data Hall 2 by the first quarter of 2028. These are estimates, not guidance, and depend on permitting, equipment procurement, construction and financing. Late delivery results in rent credits and, if outside dates are missed or initial permits are not obtained within 90 days of the Colocation Agreement effective date, the CLT1 Customer may terminate and receive a refund of prepaid amounts.

Financing

We intend to fund CLT1 primarily with the escrowed Colocation Agreement prepayments and project-level debt and preferred equity. We have not arranged any project-level financing, and its availability and terms are not assured. If prepayments are delayed or not released, or project financing is unavailable on acceptable terms, we may need to raise additional corporate-level capital, including equity that would dilute stockholders. See "Liquidity and Capital Resources."

Power costs and the ESA

The amended ESA, effective October 1, 2026, provides 65 MW for an initial 15-year term and carries a minimum monthly demand charge of $400,000, of which $200,000 is payable currently and $200,000 is deferred, without interest, until the earlier of the date our contracted demand first reaches 40,000 kVA and December 31, 2027. We must also provide credit support of approximately two months of estimated maximum billings. Under the Colocation Agreement, we expect power costs to be passed through to the CLT1 Customer once service commences. Until service commences under the Colocation Agreement, the minimum demand charge is a cost without offsetting revenue, and the deferred portion becomes payable in cash no later than December 31, 2027 regardless of whether CLT1 has been commissioned.

Wind-down of legacy hosting

Our reported revenue, gross margin and net loss through September 30, 2026 were generated by bitcoin hosting arrangements. Bitcoin's price fell from approximately $89,000 at the start of 2026 to approximately $62,000 on June 5, 2026, which made hosting uneconomic for our customers, and we de-energized substantially all hosting operations on that date. Although bitcoin's price has since recovered, to approximately $83,600 at September 30, 2026, the site was temporarily re-energized for only approximately two weeks in September 2026, and in the fourth quarter of 2026 we began decommissioning the legacy hosting infrastructure to redeploy the site for CLT1. We expect no meaningful hosting revenue until CLT1 is commissioned, although we may recognize revenue related to the build-out of the data halls (the "white space") under the Colocation Agreement, the timing and accounting treatment of which we are still evaluating. On November 11, 2026, the Company's Board of Directors approved the formal wind-down of the Company's legacy bitcoin mining hosting operations in connection with the redeployment of the site for CLT1. See Note 12 - Subsequent Events.

Competition and regulation

We compete with data center REITs, AI/HPC developers, hyperscalers and former bitcoin miners for powered sites, long-lead equipment (transformers, switchgear, generators and cooling), skilled labor, capital and customers, and many competitors have substantially greater resources. We believe contracted power at CLT1, the executed Colocation Agreement and our management team's experience position us to compete. State and local regulation of large loads, described under "Industry Overview," may affect our costs and timelines.

CLT1 Development Funding

We expect CLT1 to require capital significantly in excess of our unrestricted cash. We currently intend to fund CLT1 with the escrowed Colocation Agreement prepayments and project-level debt and preferred equity and, based on our current plan, do not expect to require corporate-level common equity for CLT1. However, we have not arranged any project-level financing; release of escrowed funds is subject to conditions, including the pledge and Company payment guarantee described above; and amounts reconcile to actual cost, so the final capital structure could change in a manner that requires additional equity. Failure to obtain adequate financing on acceptable terms could delay, scale back or prevent CLT1 and our other projects. Funding for our remaining pipeline is expected to come from the sources described under "Development Portfolio and Pipeline," and each new project will require additional capital.

The Minnesota site is owned by VCV Minnesota, which is owned by Tiger Cloud. The GSO1 site is subject to a letter of intent with VCV Digital Solutions LLC, an entity controlled by our Chief Executive Officer; our Audit Committee approved the transaction on October 6, 2026. Neither transaction is binding. Related-party transactions are reviewed periodically for appropriateness and collectability. See Note 11 - Related Party Transactions.

Recent Developments

Master Colocation Services Agreement

On September 25, 2026, AIB CLT1 LLC entered into the Colocation Agreement with Nebius Inc. (the "CLT1 Customer") for 50 MW of critical IT capacity at CLT1, in two data halls of approximately 25 MW each. The initial term is 12 years, with two five-year renewal options exercisable by the CLT1 Customer. Escrowed funds may be used only to develop the data center and are released to us upon satisfaction of specified conditions, including a pledge of the equity and assets of AIB CLT1 LLC, and a payment guarantee from the Company. The CLT1 Customer's obligations are guaranteed by its parent company. See Note 10 - Commitments and Contingencies.

Electric Service Agreement

On May 27, 2026, One Blockchain LLC executed the amended ESA described above, expanding available power at CLT1 from 40 MW to 65 MW. Service under the amended ESA commenced on October 1, 2026.

Texas Site (DFW1)

On September 11, 2026, we acquired approximately 29.4 acres in Texas, through a purchase of real property and the acquisition of all membership interests of SFM644 LLC, which holds a facilities extension agreement for up to 40 MW of additional primary electric service. The site has approximately 15 MW of existing primary service; however, under the purchase agreement, the prior owner retains the economic benefit of that service until the site is fully decommissioned in December 2026. We accounted for the transaction as an asset acquisition at a total cost of $16.9 million, consisting of $11.6 million of cash paid (including transaction costs and a $162,500 earnest money deposit) and a $6.0 million deferred payment due when the utility places the related electric facilities in service, recorded at a present value of $5.3 million. Substantially all of the cost was allocated to power interconnection rights ($16.3 million), reported in intangible assets. The deferred payment and the utility's security requirement are supported by letters of credit of $6.0 million and $1.75 million, collateralized by $8.1 million of restricted cash. See Notes 3 - Property and Equipment, Net and 10 - Commitments and Contingencies.

Other Site Opportunities

We paid a $1.2 million refundable deposit in the second quarter of 2026 under a non-binding letter of intent for the approximately 75 MW Minnesota site; our Chief Executive Officer personally guaranteed repayment of the deposit on October 6, 2026. No definitive agreements have been executed. We have also entered into the DFW2 and GSO1 letters of intent described in Note 10 - Commitments and Contingencies and Note 12 - Subsequent Events. Each remains subject to definitive agreements, diligence and financing.

Public Offering of Common Stock

On June 5, 2026, we entered into an underwriting agreement with Lucid Capital Markets, LLC for an underwritten public offering of 33,333,334 shares of common stock at $1.65 per share, which closed on June 8, 2026. On June 17, 2026, we closed the sale of an additional 4,999,999 shares on the underwriter's full exercise of its over-allotment option. We issued 38,333,333 shares in total and received gross proceeds of approximately $63.25 million (net cash proceeds of $59.0 million). The proceeds are being used for working capital, deposits on long-lead equipment, land acquisition, development capital expenditures and general corporate purposes.

Transition of Legacy Hosting Operations

As of September 30, 2026, we had not committed to a formal plan of abandonment, retirement or disposal of the legacy hosting assets, and no impairment, asset retirement obligation, restructuring liability or held-for-sale classification had been recorded. We continue to evaluate redeployment of the site's power and infrastructure for AI/HPC use. Future decisions may result in accelerated depreciation, impairment, asset retirement obligations or other transition costs, the amounts and timing of which cannot currently be estimated. We expect to continue incurring site maintenance, professional, permitting and development costs, some of which cannot be capitalized, during the transition. On November 11, 2026, the Company's Board of Directors approved the formal wind-down of the Company's legacy bitcoin mining hosting operations. The wind-down may result in the accelerated depreciation, impairment, asset retirement obligations or other transition costs described above, the amounts and timing of which cannot currently be estimated. See Note 12 - Subsequent Events.

Business Combination and Signing Day Sports

The Business Combination with SGN closed on March 16, 2026 and was accounted for as a reverse merger; see Note 4 - Business Combination and Control Obtained by a Related Party.

Results of Operations

As described under "Overview" and "Key Factors Affecting Our Financial Performance" above, the Company's results of operations for the periods presented reflect the operation of the 40 MW site under bitcoin mining hosting arrangements. The Company has not yet placed into service any material AI/HPC capacity and has not yet generated revenue from long-term AI/HPC customer contracts. Accordingly, the period-over-period changes in revenue, cost of revenues, gross margin and operating expenses discussed below reflect the operating economics of the site and the transition of the site's customer mix, and are not intended to serve as a forecast of the Company's future results of operations following commissioning of the CLT1 Campus and execution of the Company's AI/HPC strategy.

Three Months Ended September 30, 2026 and 2025

Revenues

Revenue for the three months ended September 30, 2026 was $0.8 million, a decrease of $3.4 million, or 81%, from $4.2 million for the three months ended September 30, 2025. The decrease reflects the June 5, 2026 de-energization of the site in response to a decline in the price of bitcoin, which eliminated variable hosting revenue at the site for most of the quarter. Blue Ridge Digital Mining LLC, a related party, accounted for approximately 80% and 49% of revenues for the three and nine months ended September 30, 2026, respectively. See "Related-Party Transactions" below and Note 11 - Related Party Transactions.

Costs and Operating Expenses

Three Months Ended September 30,
2026 2025 Increase
(Decrease)
Cost of revenues 1,713,843 3,242,391 (1,528,548 )
Gross (loss) profit (900,614 ) 984,894 (1,885,508 )
Gross Margin (111 )% 23 %

Cost of revenue and gross margin. The largest components of our cost of revenues are utility-related expenses, including electricity, bandwidth access and other infrastructure costs. Cost of revenues totaled $1.7 million for the three months ended September 30, 2026, a decrease of $1.5 million, or 47%, compared to $3.2 million for the three months ended September 30, 2025.

Gross profit declined to a loss of $0.9 million for the three months ended September 30, 2026, compared to a gross profit of $1.0 million for the same period in 2025, a decrease of approximately $1.9 million. Gross margin decreased to a loss of approximately 111% for the three months ended September 30, 2026 from approximately 23% for the same period in 2025. Fluctuations in gross profit (loss) are largely affected by two principal factors:

1. Pricing. The average effective billing rate per kWh increased over the period from approximately $0.068 during the three months ended September 30, 2025 to approximately $0.374 during the three months ended September 30, 2026. This increase largely reflects a contractual adjustment of price concessions tied to the price of bitcoin passed to the tenants.
2. Energy costs. The Company's average per-kWh energy procurement cost increased from approximately $0.054 during the three months ended September 30, 2025 to approximately $0.804 during the three months ended September 30, 2026 under the Company's previous energy services contract. The increase reflects minimum monthly charges under that contract, which were incurred while the site was largely de-energized and spread over a significantly lower volume of energy.

The decrease in gross profit primarily reflects the loss of hosting revenue following the de-energization of the site and $1.2 million of utility costs, consisting principally of demand charges. Total energy volume billed to customers decreased to approximately 2.2 gigawatt hours ("GWh") for the three months ended September 30, 2026 from approximately 62.2 GWh for the three months ended September 30, 2025.

Operating expenses. Total costs and operating expenses were $6.0 million for the three months ended September 30, 2026 compared to $4.3 million for the three months ended September 30, 2025. The increase of $1.7 million, or 39%, was primarily attributable to a $3.2 million increase in selling, general and administrative expenses, including $0.7 million of professional fees associated with the development of the CLT1 Campus, as well as consulting arrangements (including non-cash share-based consulting costs), public company costs, payroll, insurance and software licenses, and $1.1 million of advertising and community engagement expenses. These increases were partially offset by a $1.5 million decrease in cost of revenues. Depreciation expense remained consistent.

Operating Loss

Operating loss was $5.2 million for the three months ended September 30, 2026, compared to $0.1 million for the three months ended September 30, 2025, reflecting the $3.4 million decrease in revenue and the $1.7 million increase in costs and operating expenses discussed above.

Other Income / (Expense)

Other income, net was $0.3 million for the three months ended September 30, 2026, consisting of $0.4 million of interest income earned on money market funds and cash collateral accounts following the Company's June 2026 Offering, partially offset by interest expense from the accretion of the discount on the deferred purchase consideration for the DFW1. There was no other income or expense for the three months ended September 30, 2025.

Net Loss

Net loss was $4.8 million for the three months ended September 30, 2026, compared to a net loss of $0.1 million for the three months ended September 30, 2025, an increased loss of approximately $4.7 million, driven by the items discussed above.

Nine Months Ended September 30, 2026 and 2025

Revenues

Revenue for the nine months ended September 30, 2026 was $8.6 million, a decrease of $4.8 million, or 36%, from $13.5 million for the nine months ended September 30, 2025. The decrease was primarily attributable to the June 5, 2026 de-energization of the site in response to a decline in the price of bitcoin, which eliminated substantially all hosting revenue for the remainder of the period, other than during a temporary re-energization of approximately two weeks in September 2026.

Costs and Operating Expenses

Nine Months Ended September 30,
2026 2025 Increase
(Decrease)
Cost of revenues 9,489,840 10,711,720 (1,221,880 )
Gross (loss) profit (847,950 ) 2,759,834 (3,607,784 )
Gross Margin (10 )% 20 %

Cost of revenue and gross margin. The largest components of our cost of revenues are utility-related expenses, including electricity, bandwidth access and other infrastructure costs. Cost of revenues totaled $9.5 million for the nine months ended September 30, 2026, a decrease of $1.2 million, or 11%, compared to $10.7 million for the nine months ended September 30, 2025. The decrease was primarily due to lower energy consumption following the de-energization of the site, partially offset by a higher average per-kWh energy procurement cost, including the effect of the final 2025 utility true-up, and utility costs incurred at the CLT1 Campus.

The Company recorded a gross loss of $0.8 million for the nine months ended September 30, 2026, compared to gross profit of $2.8 million for the nine months ended September 30, 2025, a decrease of approximately $3.6 million. Gross margin decreased to a loss of 10% for the nine months ended September 30, 2026 from approximately 20% for the same period in 2025. Fluctuations in gross profit are largely affected by two principal factors:

1. Pricing. The average effective billing rate increased to approximately $0.068 per kWh for the nine months ended September 30, 2026 from approximately $0.067 per kWh for the nine months ended September 30, 2025.
2. Energy costs. The average per-kWh energy procurement cost increased to approximately $0.070 for the nine months ended September 30, 2026 from approximately $0.051 for the nine months ended September 30, 2025 under the Company's previous energy services contract. The increase primarily reflects the 2025 utility true-up recognized in 2026, which resulted from two factors outside the Company's control: (i) a prolonged regional drought that reduced the utility provider's lower-cost hydroelectric generation and required greater reliance on natural gas-fired generation, and (ii) a significant increase in regional natural gas transportation costs, which do not necessarily move in line with natural gas commodity prices.

The decrease in gross profit primarily reflects the loss of hosting revenue following the de-energization of the site, higher per-kWh energy costs that could not be passed through to customers, and utility costs incurred at the CLT1 Campus.

Operating expenses. Total costs and operating expenses were $17.7 million for the nine months ended September 30, 2026 compared to $13.7 million for the nine months ended September 30, 2025. The increase of $4.0 million, or 29%, reflects a $5.1 million increase in selling, general and administrative expenses, and a $0.1 million increase in depreciation and amortization, partially offset by the $1.2 million decrease in cost of revenues discussed above.

The increase in selling, general and administrative expenses was primarily attributable to:

(i) a $0.5 million net increase in professional, legal and consulting fees, principally related to the Business Combination and the Company's listing on the NYSE American, including $0.7 million of non-cash advisory share consideration issued to Maxim Group LLC in connection with the Business Combination;
(ii) $1.1 million of CLT1-related costs expensed as incurred, including professional fees, site security and earthwork costs;
(iii) a $1.2 million increase in labor and management fee allocations from Tiger Cloud LLC, a related party, for payroll and administrative support provided to the Company, reflecting additional personnel in sales, construction and project management to support the development of CLT1;
(iv) a $1.2 million increase in advertising, community engagement, and investor relations;
(v) a $0.2 million increase in travel, training and conference costs, including costs associated with financing and site acquisition activities;
(vi) $0.35 million of discretionary cash bonuses paid to executive officers in the second quarter of 2026;
(vii) a $0.4 million increase in insurance costs, including directors' and officers' insurance following the Company's listing, and a surety bond renewal in connection with the electric service agreement for CLT1; and
(viii) $0.3 million of other costs, including operating expenses of Signing Day Sports, Inc., which has been consolidated since March 16, 2026, software and license costs and director fees.

These increases were partially offset by a $0.1 million decrease in site maintenance and equipment costs following the de-energization of the site.

Depreciation and amortization. Depreciation and amortization was $0.7 million for the nine months ended September 30, 2026, an increase of $0.1 million, or 17%, compared to $0.6 million for the nine months ended September 30, 2025, primarily reflecting a full period of depreciation on the 60 Antbox containers delivered and accepted during the second quarter of 2025.

Operating Loss

Operating loss was $9.0 million for the nine months ended September 30, 2026, compared to operating loss of $0.2 million for the nine months ended September 30, 2025, an increase of approximately $8.8 million. The increase reflects the $4.8 million decrease in revenues, resulting principally from the de-energization of the site, and the $4.0 million increase in total costs and operating expenses, driven primarily by higher selling, general and administrative expenses associated with the Company's transition to a publicly listed AI/HPC infrastructure platform, advertising expense and utility costs incurred.

Other Income / (Expense)

Other income, net was $0.5 million for the nine months ended September 30, 2026, consisting primarily of $0.5 million of interest income earned on money market funds and cash collateral accounts following the Company's June 2026 Offering, partially offset by interest expense from the accretion of the discount on the deferred purchase consideration for the DFW1. Other income of $0.1 million for the nine months ended September 30, 2025 was primarily attributable to the gain on disposal of assets held for sale.

Net Loss

Net loss was $8.6 million for the nine months ended September 30, 2026, compared to a net loss of $0.1 million for the nine months ended September 30, 2025, an increased loss of approximately $8.4 million, driven by the items discussed above.

Non-GAAP Financial Measures

Non-GAAP financial measures are not a substitute for financial information prepared in accordance with GAAP. Non-GAAP financial measures should not be considered in isolation, but should be considered together with the most directly comparable GAAP financial measures and the reconciliation of the non-GAAP financial measures to the most directly comparable GAAP financial measures. We have presented Adjusted EBITDA to provide investors with an additional tool to evaluate our results of operations in a manner that focuses on what management believes to be our core, ongoing business operations. We believe the inclusion of this non-GAAP financial measure allows for meaningful comparisons between the Company's core business operating results and those of other companies and provides the Company with an important tool for financial and operating decision-making and for evaluating its core business operating results over different periods of time.

Investors should note that the non-GAAP financial measure used by us may not be the same, or calculated in the same manner, as similarly titled measures of other companies. Investors should therefore exercise caution when comparing our non-GAAP financial measures to similarly titled measures of other companies.

Adjusted EBITDA is not a measurement of financial performance under GAAP and should not be considered as an alternative to operating income or any other measure of performance derived in accordance with GAAP. Although management utilizes and presents Adjusted EBITDA, we do so only supplementally and do not consider it a substitute for, or superior to, the information provided by GAAP financial results. Adjusted EBITDA is not meant to be considered in isolation and should be read in conjunction with the consolidated financial statements.

We exclude depreciation and amortization from Adjusted EBITDA because they do not reflect our current or future cash spending levels to support our business and are based on the estimated useful lives of our data center assets, which estimates may vary from actual performance. We also exclude gain or loss on asset sales as it represents profit or loss not meaningful in evaluating current or future operating performance. Additionally, we exclude transaction costs and reimbursement transaction costs, which relate to costs incurred in connection with business combinations and the transaction with Signing Day Sports, including advisory, legal, accounting, valuation and other professional or consulting fees, to enhance comparability of our financial results with our historical operations. The frequency and amount of such charges vary significantly based on the size and timing of the transactions. Management does not consider these costs indicative of our ongoing operating performance and believes their exclusion enhances period-over-period comparability as the Company executes its transition toward AI and HPC infrastructure development.

Adjusted EBITDA

Adjusted EBITDA is a key factor in how we assess the operating performance of our data center and develop our growth strategies and expansion decisions. We define Adjusted EBITDA as net income or loss excluding income tax expense, interest income, interest expense, other income and expense items, gain or loss on asset sales, depreciation, amortization, transaction costs, the reimbursement of transaction costs, and non-recurring legal and professional fees, as presented below:

Three Months Ended
September 30,
Change
2026 2025 $
NET LOSS (4,808,269 ) (63,363 ) (4,744,906 )
Add/(Deduct):
Interest expense 21,237 - 21,237
Interest income (366,265 ) - (366,265 )
Other (income) expense (3,532 ) - (3,532 )
Depreciation and amortization 254,589 255,771 (1,182 )
Transaction costs - 808,187 (808,187 )
Non-recurring legal and professional fees 37,157 - 37,157
ADJUSTED EBITDA (4,865,083 ) 1,000,595 (5,865,678 )

Adjusted EBITDA for the three months ended September 30, 2026 was a loss of $4.9 million, a decrease of $5.9 million, or 590%, from Adjusted EBITDA of $1.0 million for the three months ended September 30, 2025. The decrease was primarily driven by lower revenues following the de-energization of the site, higher energy costs, and higher recurring selling, general and administrative and advertising expenses, as discussed under "Results of Operations" above.

Nine Months Ended
September 30,
Change
2026 2025 $
NET LOSS (8,562,700 ) (116,396 ) (8,446,304 )
Add/(Deduct):
Interest expense 21,237 - 21,237
Interest income (464,980 ) - (464,980 )
Other (income) expense (7,715 ) 5,360 (13,075 )
Depreciation and amortization 755,600 612,752 142,848
Transaction costs 1,204,573 1,280,111 (75,538 )
Reimbursement of transaction costs (1,330,000 ) - (1,330,000 )
Non-recurring legal and professional fees 162,157 - 162,157
Gain on asset sales - (67,714 ) 67,714
ADJUSTED EBITDA (8,221,828 ) 1,714,113 (9,935,941 )

Adjusted EBITDA for the nine months ended September 30, 2026 was a loss of $8.2 million, a decrease of $9.9 million, or 582%, from Adjusted EBITDA of $1.7 million for the nine months ended September 30, 2025. The decrease was primarily driven by lower revenues following the de-energization of the site, higher energy costs, and higher recurring selling, general and administrative and advertising expenses, as discussed under "Results of Operations" above.

Non-Recurring Legal and Professional Fees

Represents legal and professional fees incurred in connection with corporate transaction and financing activities that management does not consider indicative of ongoing operating performance. For the nine months ended September 30, 2026, these fees consisted primarily of the initial NYSE American listing fee, and fees associated with terminated financing transactions.

Liquidity and Capital Resources

As of September 30, 2026, the Company had cash and cash equivalents of $15.3 million, primarily from the net proceeds of the June 2026 Offering, and restricted cash of $10.2 million. Restricted cash is pledged as collateral for standby letters of credit and is not available to fund operations. Amounts deposited into escrow by the CLT1 Customer under the Colocation Agreement may be used only for the development of the CLT1 Campus and are released to the Company only upon satisfaction of specified conditions. The Company's commitments include the $6.0 million Deferred Payment for the DFW1 Site and minimum monthly demand charges under its electric service agreement. The Company has also entered into letters of intent to acquire development sites in Texas and North Carolina for $24.9 million and $36.0 million, respectively, which remain subject to definitive agreements.

The closing of the June 2026 Offering materially improved the Company's liquidity profile and reduced its dependence on related-party funding arrangements. Management believes the capital raised provides the Company with greater flexibility to pursue expansion opportunities, including investments in power infrastructure, land acquisition opportunities, AI and HPC-focused data center development projects, deposits on long lead-time equipment and other strategic initiatives. As a result of the offering, management believes the Company is in a significantly stronger position to execute its long-term growth strategy and pursue opportunities that may not have been available prior to the offering. Management believes that cash on hand will be sufficient to meet the Company's obligations and planned corporate expenditures for at least the next twelve months from the date of this report. Development of the CLT1 Campus is expected to be funded primarily with the escrowed CLT1 Customer prepayments and project-level financing, as described below.

During the third quarter of 2026, the Company completed the acquisition of approximately 29.4 acres of real property and related assets in Texas for an aggregate contractual purchase price of approximately $17.2 million (a total cost of $16.9 million, reflecting the present value of the deferred payment and transaction costs). Approximately $11.6 million was paid in cash, including transaction costs and the earnest money deposit, while the remaining consideration consists of a $6.0 million deferred payment obligation that is payable on the date the utility places the related electric service facilities in service. Management believes the acquisition supports the Company's long-term AI/HPC development strategy and expands its portfolio of powered development sites.

The Company's execution of its AI/HPC infrastructure strategy, including the development, construction and commissioning of the CLT1 Campus, is expected to require capital significantly in excess of the net proceeds from the June 2026 Offering and the Company's current cash on hand. Development of a purpose-built AI/HPC campus of the type the Company is pursuing at CLT1 typically requires substantial investment in land, power delivery, buildings, mechanical, electrical and cooling systems and IT infrastructure, in addition to deposits and progress payments on long lead-time equipment, working capital, interest during construction and other financing-related costs. The Company currently expects to fund these requirements through a combination of customer deposits, prepayments and other security under long-term customer contracts; project-level and asset-level debt financing; additional equity or equity-linked issuances, subject to any applicable contractual lock-up and blackout restrictions; and cash on hand. There can be no assurance that the Company will be able to obtain any of these sources of financing on acceptable terms or at all, and the Company's ability to do so will depend on capital markets conditions, project-specific execution risk, counterparty performance and other factors, some of which are outside the Company's control. A failure to obtain adequate financing on acceptable terms could delay, scale back or prevent the Company's planned AI/HPC development activities.

Cash Flows:

Comparison of Cash Flows for the Nine Months Ended September 30, 2026 and 2025

Nine months ended
September 30,
2026 2025
Cash, cash equivalents and restricted cash, beginning of year 15,265 131,107
Net cash and cash equivalents provided by (used in):
Operating activities (9,480,489 ) 1,833,065
Investing activities (23,129,920 ) 113,582
Financing activities 58,096,337 (2,069,248 )
Cash, cash equivalents and restricted cash, end of the period 25,501,193 8,506

Cash, cash equivalents and restricted cash were $25.5 million as of September 30, 2026, compared to less than $0.1 million as of December 31, 2025. The increase reflected the following:

Operating activities. Net cash used in operating activities was $9.5 million for the nine months ended September 30, 2026, compared to net cash provided by operating activities of $1.8 million for the nine months ended September 30, 2025. The change primarily reflected the $8.6 million net loss, decreases in contract liabilities and accounts payable and accrued expenses of $2.3 million and $1.5 million, respectively, partially offset by a $1.0 million increase in other current liabilities and $1.7 million of non-cash charges, including depreciation, advisory shares and share-based consulting expense. Net cash provided by operating activities for the nine months ended September 30, 2025 primarily reflected increases in contract liabilities, accounts payable and accrued expenses and other current liabilities of $1.3 million, $1.2 million and $1.2 million, respectively, and $0.6 million of depreciation and amortization, partially offset by a $2.2 million increase in accounts receivable.

Investing activities. Net cash used in investing activities was $23.1 million for the nine months ended September 30, 2026, compared to net cash provided by investing activities of $0.1 million for the nine months ended September 30, 2025. Investing activities in 2026 included $11.6 million paid to acquire the DFW1 Texas site, $7.7 million of deposits on assets and construction, $0.6 million of construction in progress payments for the CLT1 Campus, a $2.1 million advance to VCV DIH that was repaid on October 13, 2026, and $1.4 million of land deposits, partially offset by $0.3 million of cash acquired in the Business Combination. An additional $1.9 million of construction in progress costs remained unpaid at September 30, 2026, and $5.3 million of the DFW1 consideration was deferred; neither is included in investing cash flows. Net cash provided by investing activities for the nine months ended September 30, 2025 primarily reflected $0.1 million of proceeds from the sale of assets held for sale. In addition, $2.3 million of property and equipment acquired in 2025 was financed through deferred consideration and is not included in investing cash flows.

Financing activities. Net cash provided by financing activities was $58.1 million for the nine months ended September 30, 2026, consisting of $59.0 million of net proceeds from the June 2026 Offering, partially offset by $0.9 million of payments of consideration payable. Net cash used in financing activities was $2.1 million for the nine months ended September 30, 2025, reflecting $3.6 million of distributions and $0.2 million of payments of consideration payable, partially offset by $1.8 million of contributions.

Related-Party Transactions

We engage in various transactions with related parties in the ordinary course of business. During the reporting periods, the Company reimbursed an affiliate for administrative and operational expenses incurred on its behalf. The Company also maintained a loan receivable from VCV DIH, which is under common ownership with the Company and is therefore a related party. The loan was used to support surety bond and letter of credit requirements and is non-interest-bearing. Management believes the loan is fully collectible based on the collateral structure and the financial condition of the borrower. In addition, a subsidiary of VCV DIH, Blue Ridge Digital Mining LLC, is a customer of the Company's hosting operations, and VCV DIH maintained the surety bond supporting certain obligations under the Company's ESA. Effective September 25, 2026, VCV DIH assigned the letter of credit to the Company, and VCV DIH repaid the related $2.1 million on October 13, 2026.

The Company also has receivables from and payables to other affiliated entities arising from operational activities. These balances are expected to be settled in the ordinary course of business.

During the nine months ended September 30, 2026, the Company also entered into a non-binding arrangement with a related party regarding a potential AI/HPC data center development site in Minnesota (MSP1) and paid a refundable land deposit of $1.2 million. No definitive acquisition, lease or development agreements had been executed as of September 30, 2026, and the deposit is reflected in prepaid expenses and other current assets. VCV Minnesota is owned by Tiger Cloud LLC ("Tiger Cloud"), which is a significant shareholder of the Company, beneficially owning approximately 19.9% of the Company's outstanding Common Stock as of the date of this report. On October 6, 2026, the Company's Chief Executive Officer personally guaranteed repayment of the deposit. The Company continues to evaluate the opportunity and negotiate potential definitive agreements with the related party.

On October 5, 2026, the Company entered into a letter of intent with VCV Digital Solutions LLC, an entity controlled by the Company's Chief Executive Officer, to acquire approximately 72 acres of land in North Carolina (GSO1) with up to 90 MW of planned power capacity for $36.0 million. The Company paid a deposit of $1.8 million directly to the seller, which is refundable during the twelve-month exclusivity period and will be credited against the purchase price at closing. The Company's Chief Executive Officer personally guaranteed repayment of the deposit, and the Audit Committee approved the transaction on October 6, 2026. See Note 12 - Subsequent Events.

Management monitors related-party balances and transactions to ensure transparency and compliance with applicable accounting standards. All related-party transactions are disclosed in the condensed consolidated financial statements and are reviewed periodically for appropriateness and collectability.

Recently Issued and Proposed Accounting Pronouncements

For information on new accounting pronouncements and the impact of these pronouncements on our condensed consolidated financial statements, see Note 2 - "Summary of Significant Accounting Policies" in the notes to our condensed consolidated financial statements.

Critical Accounting Estimates

We describe our most significant accounting policies in Note 2, "Summary of Significant Accounting Policies" in the notes to the condensed consolidated financial statements. We have identified the policies below as those that require significant judgments, assumptions and estimates and that have a significant impact on our financial condition and results of operations. These policies are considered critical because they may result in fluctuations in our reported results from period to period due to the significant judgments, estimates and assumptions about complex and inherently uncertain matters, and because the use of different judgments, assumptions or estimates could have a material impact on our financial condition or results of operations. We evaluate our critical accounting estimates on an ongoing basis and update them as appropriate based on changing conditions.

Utility True-Up Adjustment

The Company procures electricity through a local utility provider and is subject to an annual true-up process that reconciles estimated energy costs with actual consumption and final rates. Management must estimate the true-up accrual at each reporting period, which directly impacts cost of revenues. This estimate involves significant judgment, particularly in forecasting usage patterns, rate changes and the timing of adjustments. The annual true-up credit or charge is typically invoiced in Q3 of the following year.

In July 2026 (the third quarter of 2026), the Company received the final 2025 true-up invoice of $933,620, including $101,132 of interest. The invoice had been paid as of September 30, 2026 and as such, is not included in accounts payable and accrued expenses. In addition, the estimated accrual for the 2026 true-up was $14,825 as of September 30, 2026 and is included in accounts payable and accrued expenses. Other costs included in cost of revenues include fees for network services and water fees.

Asset Acquisitions

The cost of the DFW1 Site acquisition was allocated to land, building and site improvements and power interconnection rights based on their relative fair values, which were determined with the assistance of a third-party valuation specialist using a market approach based on sales of comparable powered sites. The deferred payment was recorded at present value using an imputed interest rate and an estimated settlement date that depends on the utility's in-service schedule. Different assumptions would change the allocation among asset classes and the amount of interest expense recognized.

Goodwill and Long-Lived Assets

Goodwill is tested for impairment annually, or more frequently if events or changes in circumstances indicate that the fair value of the Company's single reporting unit may be below its carrying amount, and long-lived assets are tested for recoverability when events or changes in circumstances indicate their carrying amount may not be recoverable. The de-energization of the site, the decline in revenue and the planned decommissioning of legacy hosting infrastructure required management to assess whether impairment indicators existed. These assessments require judgments about future cash flows, the timing of the AI/HPC transition and market conditions. No impairment was recognized during the nine months ended September 30, 2026.

Emerging Growth Company and Smaller Reporting Company Status

As an emerging growth company under the JOBS Act, we can take advantage of an extended transition period for complying with new or revised accounting standards. We have elected to avail ourselves of such extended transition period, which means that when a standard is issued or revised and it has different application dates for public or private companies, we may adopt the new or revised standard at the time private companies adopt it, until such time that we either irrevocably elect to opt out of the extended transition period or no longer qualify as an emerging growth company. We may choose to early adopt any new or revised accounting standards whenever such early adoption is permitted for private companies.

Subject to certain conditions set forth in the JOBS Act, if, as an emerging growth company, we choose to rely on such exemptions, we may not be required to, among other things, (i) provide an auditor's attestation report on our system of internal control over financial reporting pursuant to Section 404(b) of the Sarbanes-Oxley Act, (ii) provide all of the compensation disclosure that may be required of non-emerging growth companies under the Dodd-Frank Wall Street Reform and Consumer Protection Act, (iii) comply with any requirement that may be adopted by the PCAOB regarding mandatory audit firm rotation or a supplement to the auditor's report providing additional information about the audit and the financial statements, or (iv) disclose certain executive compensation related items such as the correlation between executive compensation and performance and comparisons of CEO compensation to median employee compensation. We will continue to remain an emerging growth company until the earliest of: (i) December 31, 2031, the last day of the fiscal year following the fifth anniversary of the date of our first sale of common equity securities pursuant to an effective registration statement; (ii) the last day of the fiscal year in which our total annual gross revenue is equal to or more than $1.235 billion; (iii) the date on which we have issued more than $1.0 billion in nonconvertible debt during the previous three years; or (iv) the date on which we are deemed to be a large accelerated filer as defined in Rule 12b-2 under the Exchange Act.

We are also a smaller reporting company as defined in the Exchange Act. We may continue to be a smaller reporting company even after we are no longer an emerging growth company. We may take advantage of certain of the scaled disclosures available to smaller reporting companies for so long as our voting and non-voting common stock held by non-affiliates is less than $250.0 million measured on the last business day of our second fiscal quarter, or our annual revenue is less than $100.0 million during the most recently completed fiscal year and our voting and non-voting common stock held by non-affiliates is less than $700.0 million measured on the last business day of our second fiscal quarter.

AIB Data Centers Inc. published this content on November 16, 2026, and is solely responsible for the information contained herein. Distributed via EDGAR on November 16, 2026 at 21:11 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]