Macomb County State of the Roads: Department of Roads showcases progress and plans to enhance transportation infrastructure

Macomb County strengthening roads, bridges and traffic network through strategic investments, innovative technology and additional state funding

Officials from the Macomb County Executive Office and the Macomb Department of Roads (MCDR) provided an overview of the current state of Macomb County's roads, highlighted progress that was made in 2025, which included more than $73 million in road, bridge and traffic improvements. With the passage of the state budget and additional road funding signed into law, the agency also previewed plans for 2026.

"The work of the Department of Roads is essential to enhancing public safety and supporting the transportation infrastructure needs of the County and the growth of the region" said Macomb County Executive Mark A. Hackel. "With the addition of new road funding through the state, Macomb County will continue to make strategic investments using data-driven asset management."

Macomb County Executive Mark Hackel

As Michigan's third most populated county and home of the sixth largest road system in the state, MCDR is responsible for the management of more than 1,700 miles of county roadways, 226 bridges, 830 culverts, 900 traffic signals, 350 traffic cameras and 60,000 traffic signs. Macomb County has made significant investments in roads and bridges in recent years while incorporating the use of the latest traffic technology to reinforce MCDR's existing programs and strategies.

"Macomb County is continuously exploring, evaluating and implementing technologies, strategies, projects and programs that strengthen our infrastructure and enhance safety for all road users," said Macomb County Deputy Executive John Paul Rea. "Macomb County is a leader in transportation safety and emerging mobility deployments and is equipped to solve logistical and safety challenges and improve the movement of people and goods in Macomb County."

Deputy Macomb County Executive John Paul Rea

MCDR has made notable progress in recent years, but there is still work to be done. Macomb County estimates $2.6 billion is needed to improve every road and bridge under their jurisdiction.

MCDR's annual programs are strategically focused on maximizing available funding and utilizing a mix of creative solutions to strengthen and enhance transportation infrastructure under Macomb County's jurisdiction. The chart below provides current and projected pavement condition ratings and lane miles improved based on current and anticipated state funding.

Pavement conditions

Year Good Fair Poor Lane miles of road improved
2021 17% 45% 38% 132
2022 121
2023 18% 47% 35% 119
2024 93
2025 (projected) 20% 52% 28% 170
2026 (projected) 336
2027 (projected) 22% 58% 20% 330
2028 (projected) 337
2029 (projected) 25% 64% 11% 326
2030 (projected) 332

Projected pavement conditions and lane miles of road improved are estimated based on data trends and the anticipated state funding increase for county road agencies.


"While the additional funding won't fix every road and bridge overnight, we anticipate that we will be able to make substantial improvements to the overall condition of our roads and bridges in the foreseeable future," said MCDR Director Bryan Santo. "The additional funding will allow the Department of Roads to bolster our existing programs and the services we provide to the communities we serve."

Director Bryan Santo, Macomb County Department of Roads

2025 progress

Through MCDR's strategic programs and transportation asset management practices, the agency invested more than $73 million into Macomb County's transportation network in 2025, which included:

  • Road, bridge and traffic improvements on 81 primary and local roads
  • 47 asphalt resurfacing and concrete pavement repair projects
  • 8 bridge and culvert projects
  • 25 subdivision projects
  • More than 1,400 miles of pavement markings applied to county roads
  • More than 100,000 tons of limestone applied to gravel roads
  • 434 signal timing changes to improve traffic efficiency
  • The installation of more than 16 miles of fiber optic communications network to fortify MCDR's advanced traffic network

Notable projects

10 Mile Road. The project included two segments of 10 Mile Road. Road rehabilitation work took place between Ryan Road and Sherwood Avenue and road reconstruction work was completed between Sherwood Avenue and Lorraine Avenue. The project included new road drainage, curb and gutter, new pavement, traffic signal enhancements and restoration work.

Garfield Road. Reconstruction work between 14 Mile Road and 15 Mile Road included new road drainage, curb and gutter, concrete pavement, traffic signals, replacement of the Harrington Drain and restoration work. The project widened Garfield Road to three lanes with a northbound lane, southbound lane and a center turn lane.

14 Mile Road. Rehabilitation work took place on 14 Mile Road as part of two projects in Sterling Heights and Warren and in Clinton Township and Roseville. Rehabilitation work took place between Van Dyke Avenue (M-53) and Hoover Road included pavement milling, base repair, asphalt overlay, structure adjustments, curb and gutter replacement, pavement markings and restoration work. Rehabilitation work was also completed between Kelly Road and Gratiot Avenue (M-3) and included pavement milling, base repair, asphalt overlay, curb and gutter replacement, pavement markings and restoration work.

2026 preview

Looking forward, MCDR has an extensive mix of work and more than $88 million in infrastructure investments planned for 2026. Below are a few notable projects anticipated to take place in 2026.

Project Location Investment Type of work
Romeo Plank Road 21-½ Mile Road to 23 Mile Road $16,500,000 Reconstruction
Broughton Road 23-½ Mile Road to 24-½ Mile Road $7,000,000 Construction
William P. Rosso Highway I-94 to Jefferson Avenue $12,933,963 Reconstruction
21 Mile Road bridge Over the Salt Slang Gloede Drain $5,120,000 Bridge replacement
Schoenherr Road bridge Over the Red Run Drain $5,281,000 Deck replacement

A full list of projects that were completed in 2025 and proposed projects that are anticipated to take place in 2026 are listed below. The public can stay up to date of what's happening on Macomb County's roadways by signing up for real-time lane closures and construction updates online.

The State of Macomb County Roads presentation is available online.

2025 Project List

Project Location Investment Type of Work Community
10 Mile Road Sherwood Avenue to Lorraine Avenue $10,000,000 Reconstruction Center Line
10 Mile Road Ryan Road to Sherwood Avenue $5,662,873 Rehabilitation Warren
14 Mile Road Van Dyke Avenue (M-53) to Hoover Road $3,789,807 Rehabilitation Sterling Heights and Warren
14 Mile Road Kelly Road to Gratiot Avenue (M-3) $3,836,057 Rehabilitation Clinton Township and Roseville
18 Mile Road Mound Road to Utica Road $2,800,000 Rehabilitation Sterling Heights
Garfield Road 14 Mile Road to 15 Mile Road $8,300,000 Reconstruction Fraser
Powell Road 30-1/2 Mile Road to 32 Mile Road $3,503,249 Reconstruction Washington Township
Romeo Plank Road 30 Mile Road to 31 Mile Road $758,215 Preventive Maintenance Ray Township
Utica Road Hayes Road to Metropolitan Parkway $975,759 Rehabilitation Clinton Township
24 Mile Road Foster Road to Baker Road $732,765 Asphalt preservation and resurfacing Chesterfield Township
25 Mile Road Broughton Road to Foss Road $299,520 Asphalt preservation and resurfacing Macomb Township
Armada Ridge Road West of Russ Road to west of Cryderman Road $449,725 Asphalt preservation and resurfacing Richmond Township
Auburn Road Ryan Road to Jamestown Road $654,395 Asphalt preservation and resurfacing Shelby Township
Card Road 21 Mile Road to 23 Mile Road $736,767 Asphalt preservation and resurfacing Macomb Township
Egan Street Carlier Street to Little Mack Avenue $154,175 Asphalt preservation and resurfacing Clinton Township
Elizabeth Road Hall Road (M-59) to Groesbeck Highway (M-97) $354,550 Asphalt preservation and resurfacing Clinton Township
Haven Ridge Road Rambling Lane to 31 Mile Road $430,850 Asphalt preservation and resurfacing Lenox Township
Kerry Street Groesbeck Highway (M-97) to Egan Street $72,085 Asphalt preservation and resurfacing Clinton Township
McKay Road 33 Mile Road to 34 Mile Road $437,875 Asphalt preservation and resurfacing Bruce Township
Sass Road 23 Mile Road to 24 Mile Road $431,575 Asphalt preservation and resurfacing Chesterfield Township
Millstone Drive Fox Elementary School to Romeo Plank Road $633,700 Concrete pavement repair Macomb Township
Riverwoods Drive Hall Road (M-59) to Winthrop Place $647,805 Concrete pavement repair Macomb Township
Hillsboro Drive Heydenreich Road to Windemere Drive $607,950 Concrete pavement repair Macomb Township
Terra Bella Street Huron Elementary School to Garfield Road $858,210 Concrete pavement repair Clinton Township
Copperwood Drive Entrance $94,070 Concrete pavement repair Washington Township
Van Dyke Avenue Ramp Stanford Boulevard to Van Dyke Avenue $546,735 Concrete pavement repair Washington Township
Metropolitan Parkway and Crocker Boulevard Intersection $169,732 Concrete pavement repair Harrison Township
Metropolitan Parkway and Jefferson Avenue Intersection $135,505 Concrete pavement repair Harrison Township
Chesterfield Road 52000 Chesterfield Road to 24 Mile Road $295,975 Concrete pavement repair Chesterfield Township
Schoenherr Road At Harold Street $27,190 Concrete pavement repair Warren
Kingscross Drive Dequindre Road to Scarboro Way $202,400 Concrete pavement repair Shelby Township
26 Mile Road and Scotland Boulevard Deceleration lane $107,850 Concrete pavement repair Shelby Township
26 Mile Road and Aberdeen Drive Deceleration lane $97,750 Concrete pavement repair Shelby Township
Kelly Court Cul-de-sac $73,695 Concrete pavement repair Shelby Township
Quinn Road Gratiot Avenue (M-3) to Harper Avenue $18,000 Crack seal Clinton Township
Harrington Street Moravian Drive to Groesbeck Highway (M-97) $6,000 Crack seal Clinton Township
Greenfield Road Canal Road to Romeo Plank Road $10,000 Crack seal Clinton Township
Garfield Road 17 Mile Road to 19 Mile Road $42,000 Crack seal Clinton Township
Armada Ridge Road Hicks Road to the Village of Armada limits $14,000 Crack seal Armada Township
Sugarbush Road 21 Mile Road to Cotton Road $8,000 Crack seal Chesterfield Township
Sugarbush Road North of Rachid Lane to north of Sugar Creek Drive $8,000 Crack seal Chesterfield Township
Callens Road Sass Road to Kiely Drive $8,000 Crack seal Chesterfield Township
Haven Ridge Road New Haven Village limits to Rambling Lane $20,000 Crack seal Lenox Township
Haven Ridge Road 31 Mile Road to 32 Mile Road $8,000 Crack seal Lenox Township
Hayes Road 18 Mile Road to Hall Road (M-59) $42,000 Crack seal Clinton Township and Sterling Heights
22 Mile Road Ryan Road to Hayes Road $48,000 Crack seal Shelby Township
21 Mile Road Shelby Road to Garfield Road $48,000 Crack seal Shelby Township and Macomb Township
26 Mile Road 20200 26 Mile Road to 1500' east of Broughton Road $4,800 Crack seal Macomb Township and Ray Township
27 Mile Road Romeo Plank Road to 2300' east of Kunstman Road $12,000 Crack seal Ray Township
32 Mile Road Powell Road to 1300' west of Romeo Plank Road $6,000 Crack seal Armada Township and Ray Township
32 Mile Road Wolcott Road to 300' east of Hicks Road $6,000 Crack seal Armada Township and Ray Township
Armada Center Road Capac Road to Omo Road $34,000 Crack seal Armada Township and Village of Armada
McVicar Road East Gates Street to 33 Mile Road $6,000 Crack seal Bruce Township
Wolcott Road 29 Mile Road to Indian Trail $5,200 Crack seal Ray Township
Utica Road Van Dyke Avenue to Hayes Road $40,000 Crack seal Sterling Heights
25 Mile Road Hayes Road to Romeo Plank Road east of roundabout $13,000 Crack seal Macomb Township
14 Mile Road Over the Red Run Drain $477,000 Bridge Preventive Maintenance Sterling Heights and Warren
18 Mile Road Over the Plumbrook Drain $1,177,247 Bridge Deck Replacement Sterling Heights
32 Mile Road Over Highbank Creek $1,935,000 Bridge Superstructure Replacement Lenox Township and Richmond Township
34 Mile Road Over Highbank Creek $1,398,035 Bridge Replacement Richmond Township
Hayes Road Over the Clinton River $1,393,000 Bridge Rehabilitation Clinton Township and Sterling Heights
Raap Road Over the Fisher Lake Outlet $689,313 Bridge Replacement Bruce Township
South River Road Over the channel to Lake St. Clair $2,257,000 Bridge Replacement Harrison Township
Utica Road Over the Red Run Drain $1,909,000 Bridge Rehabilitation Clinton Township
McKishnie Street Subdivision Road $727,914 Reconstruction Clinton Township
Vanker Avenue Subdivision Road $1,004,011 Reconstruction Shelby Township
Dartmoor Drive Subdivision Road $835,105 Reconstruction Shelby Township
Kingsway Drive Subdivision Road $894,754 Reconstruction Shelby Township
Copperwood Commons Subdivision Road $869,253 Preventive Maintenance Washington Township
Telstar Street Subdivision Road $184,307 Preventive Maintenance Chesterfield Township
Hooker Road Subdivision Road $62,339 Preventive Maintenance Chesterfield Township
Sugarbush Road Subdivision Road $83,571 Preventive Maintenance Chesterfield Township
Fierz Street Subdivision Road $92,154 Preventive Maintenance Clinton Township
Hilldale Street Subdivision Road $228,125 Preventive Maintenance Clinton Township
Ingleside Street Subdivision Road $226,093 Preventive Maintenance Clinton Township
Rhode Drive Subdivision Road $205,539 Preventive Maintenance Shelby Township
Vineyard Avenue Subdivision Road $110,675 Preventive Maintenance Shelby Township
Independence Avenue Subdivision Road $136,649 Preventive Maintenance Shelby Township
Traffic Operations Center Countywide $4,015,000 Operation and Maintenance of the Macomb County Department of Roads Traffic Operations Center Countywide
Fiber Optic Phase 4 Multiple Locations $2,373,076 Fiber Optic Cable Installation Warren, Eastpointe, Roseville, Clinton Township, and Utica
Fiber Optic Phase 5 Multiple Locations $2,287,104 Fiber Optic Cable Installation Utica, Shelby Township, Macomb Township, and Chesterfield Township
Signal Modernization Multiple Locations $1,594,428 Upgrade to Box Span Fraser, Saint Clair Shores, Shelby Township, Macomb Township, and Chesterfield Township
Signal Modernization Multiple Locations $2,023,857 Upgrade to Box Span Various Locations
Signal Modernization Multiple Locations $6,209,753 Upgrade to Box Span Various Locations
Longitudinal Pavement Marking Multiple Locations $1,794,100 Pavement Line Painting Countywide
Special Pavement Marking Multiple Locations $597,740 Upgrade Stop Bars and Crosswalks Countywide
Guardrail Safety Multiple Locations $205,419 Guardrail Upgrades Shelby Township, Macomb Township, Chesterfield Township, Bruce Township, Armada Township, and Richmond Township
26 Mile Road Pedestrian Bridge Non-Motorized Pathway $1,334,168 Pedestrian Bridge Construction Washington Township
Jefferson Avenue Pathway Non-Motorized Pathway $660,810 Pathway Construction Chesterfield Township
Jefferson Avenue Spillway Pedestrian Bridge Non-Motorized Pathway $2,793,154 Pedestrian Bridge Construction Harrison Township
Clinton River Spillway Trail Non-Motorized Pathway $728,635 Pathway Improvements Clinton Township
Schoenherr Road Pedestrian Bridge Non-Motorized Pathway $600,000 Pedestrian Bridge Construction Sterling Heights
Bonior Trail Non-Motorized Pathway $2,032,115 Pathway Improvements Clinton Township

2026 Project List

Project Location Investment Type of Work Community
Romeo Plank Road 21-1/2 Mile Road to 23 Mile Road $16,500,000 Reconstruction Macomb Township
North River Road I-94 to Bridgeview $2,363,329 Rehabilitation Harrison Township
Sugarbush Road Callens Road to Jefferson Avenue $1,300,000 Rehabilitation Chesterfield Township
Jefferson Avenue Metropolitan Parkway to South River Road $1,695,000 Rehabilitation Harrison Township
Romeo Plank Road 28 Mile Road to 29 Mile Road $500,000 Preventive Maintenance Ray Township
32 Mile Road CN Railroad to County Line Road $621,685 Preventive Maintenance Richmond and Richmond Township
Broughton Road 23-1/2 Mile Road to 24-1/2 Mile Road $7,000,000 Reconstruction Macomb Township
10 Mile Road and Little Mack Avenue Intersection $315,577 Reconstruction St. Clair Shores
Little Mack Avenue Tullio Street to South Nunneley Road and Carlier Street $1,710,000 Reconstruction Clinton Township
Rosso Highway I-94 to Jefferson Avenue $12,933,963 Reconstruction Chesterfield Township and Harrison Township
Canal Road Hayes Road to Clinton River Road $3,787,344 Rehabilitation Clinton Township
Schoenherr Road Over the Red Run Drain $5,281,000 Deck Replacement Sterling Heights
Romeo Plank Road Over the Newland Drain $1,857,000 Bridge Replacement Armada Township
Jefferson Avenue Over the Clinton River Spillway $862,000 Bridge Preventive Maintenance Harrison Township
21 Mile Road Over the Salt Slang Gloede Drain $5,120,000 Bridge Replacement Macomb Township
28 Mile Road Over the Ray and Lenox Drain $150,000 Culvert Replacement Lenox Township
Armada Ridge Road Over the Salt River $150,000 Culvert Replacement Richmond Township
Asphalt Pavement Preservation Program Countywide $6,000,000 Pavement Preservation Macomb County
Concrete Pavement Preservation Program Countywide $4,000,000 Pavement Preservation Macomb County
Pointe Rosa Street Jefferson to dead end $885,924 Subdivision Reconstruction Harrison Township
Annsbury Drive Van Dyke Avenue to Baypoint Drive $1,185,527 Subdivision Reconstruction Shelby Township
Bittersweet Lane and Country Club Drive Shelby Road to Sandy Creek Drive $655,051 Subdivision Reconstruction Shelby Township
Fieldcrest Vincent Trail to East Nocturne Lane $776,032 Subdivision Reconstruction Shelby Township
Cedarview Subdivision Christopher Court, Saxon Drive and Brookhill Drive $1,297,805 Subdivision Reconstruction Bruce Township
Shoreline Drive South River Road to dead end $213,120 Subdivision Preventive Maintenance Harrison Township
Ponchartrain Street Acacia Street to Jefferson Avenue $106,560 Subdivision Preventive Maintenance Harrison Township
Mallast Street Jefferson Avenue to Wall Street $120,960 Subdivision Preventive Maintenance Harrison Township
Bruce Hill Drive 24 Mile Road to Chapman Road $135,360 Subdivision Preventive Maintenance Shelby Township
Grace Street Van Dyke Avenue to Driftwood Drive $112,320 Subdivision Preventive Maintenance Shelby Township
Sherwood Lane 24 Mile Road to 25 Mile Road $345,600 Subdivision Preventive Maintenance Shelby Township
Jerome Street Edith Street to Helmandale Street $100,800 Subdivision Preventive Maintenance Chesterfield Township
Joel Street Edith Street to Helmandale Street $95,040 Subdivision Preventive Maintenance Chesterfield Township
Monte Road Belmont Boulevard to Monmouth Drive $51,840 Subdivision Preventive Maintenance Chesterfield Township
Carlier Street Groesbeck Highway (M-97) to Little Mack Avenue $86,400 Subdivision Preventive Maintenance Clinton Township
Laurel Street Gratiot Avenue (M-3) to Hardy Street $123,840 Subdivision Preventive Maintenance Clinton Township
Iroquois Street Gratiot Avenue (M-3) to Radde Street $103,680 Subdivision Preventive Maintenance Clinton Township
Jefferson Avenue Pathway Non-Motorized Pathway $660,810 Non-Motorized Chesterfield Township
Jefferson Avenue Spillway Pedestrian Bridge Non-Motorized Pathway $3,977,917 Non-Motorized Harrison Township
Bonior Trail Pathway Improvements Non-Motorized Pathway $2,125,000 Non-Motorized Clinton Township
Broughton Road Shared Use Pathway Non-Motorized Pathway $3,000,000 Non-Motorized Macomb Township
25 Mile Road Pedestrian Bridge Non-Motorized Pathway $1,300,000 Non-Motorized Shelby Township
Clinton River Spillway Trail (Shady Side Park) Pathway Improvements Non-Motorized Pathway $728,635 Non-Motorized Clinton Township

Media ContactEric [email protected]

Department:Department of Roads
Type:
Press Release
Category:
Announcements
Macomb County, MI published this content on October 21, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on October 21, 2025 at 18:36 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]