Washington State Department of Transportation

08/13/2026 | Press release | Distributed by Public on 08/13/2026 16:48

Permanent speed limit returns to northbound SR 529 in Marysville in mid August

MARYSVILLE - Pacific Highway travelers will soon see the return of the permanent speed limit along a short stretch of State Route 529 through Marysville in Snohomish County.

The speed limit was reduced to 30 mph during construction in this area. Following completion of the SR 529/Snohomish River & Steamboat Slough - Bridge Repair, Rehab & Paint project, it is being returned to the permanent 45 mph on northbound SR 525 through Marysville between mileposts 5.62 and 6.04.

Washington State Department of Transportation maintenance crews will replace the existing speed limit signs with new signs the week of Monday, Aug. 17. The new 45 mph speed limit is enforceable as soon as the signs are installed.

People traveling through the area can do their part to improve safety by following the speed limit, obeying posted signs and staying focused and sober while driving.

Real-time travel information is available via the WSDOT mobile app, the WSDOT travel map or by signing up for WSDOT's email updates.

Washington State Department of Transportation published this content on August 13, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on August 13, 2026 at 22:48 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]