12/12/2025 | Press release | Distributed by Public on 12/12/2025 09:25
Anderson County
Crews are scheduled to work on FM 319. Motorists should expect lane closures with flaggers controlling traffic.
Anderson County construction projects updates:
US 175 Widening Project
Traffic is currently being switched to the new pavement on the westbound lane, while the contractor works on the eastbound lane. Crews are scheduled to continue removing the old bridge while continuing to build the new eastbound bridge. Crews will also finalize ditches and slopes. The project will expand the roadway to four lanes with new bridges across the Neches River.
FM 1990; FM 861; FM 19 - Safety Improvement Project
The contractor is scheduled to continue work on FM 1990, widening and clearing the area near the structures. The project consists of improving drainage, driveways, culverts, and upgrading the guard rail for safety.
----------------------------------------
Cherokee County
Cherokee County construction projects updates:
US 175 Widening Project
The following county road intersections will be closed within the project limits:
The contractor is scheduled to continue work on the eastbound side through Cuney. Right of way prep work will also continue on the westbound side. The contractor will also continue drainage work, bridge work, and clearing utilities. Motorists should use caution when traveling through the work limits. The speed limit has been reduced to 55 mph throughout the project limits. The project consists of expansion to a four-lane roadway with new bridges, grading, asphalt, drainage structures, pavement markings, and signage. (This project is in Cherokee County but is managed by the Athens Area Office.)
FM 855 Improvements
The contractor is scheduled to continue cross structure expansion work and driveway work. Motorists should drive with caution within the construction zone. No lane closures are anticipated. This project consists of improving drainage, cross culverts, driveways, mailbox turnouts, signage, and metal beam guard rail.
SH 204
This week, the contractor is scheduled to continue permanent striping, mailbox installation, sign installation, culvert work, and more. Motorists should drive with caution within the construction zone. Lane closures are anticipated. This project consists of adding a super-two highway section.
US 69 and FM 2493 Grade Separated Interchange Realignment
Motorists should expect short-term lane closures on FM 2493, north of Panther Dr. Crews are scheduled to perform dirt work, tying in FM 2493 and US 69. Crews will also work on construction of the detour, north of Panther Dr, as well as work on the northbound frontage road. Motorists should also be aware of the changes scheduled to begin next week, including speed limit changes at the intersection. A temporary traffic signal will also begin operation on Monday, Jan. 5. The project consists of a grade separated interchange and realignment of FM 2493 West of US 69.
----------------------------------------
Gregg County
Longview crews are scheduled to repair edges on FM 1252 between SH 42 and SH 31. Motorists should be prepared for lane closures on the westbound side of FM 1252. Another crew will be sweeping at various locations.
Gregg County construction projects updates:
FM 2275
The project consists of widening from two lanes to four lanes. This will include a new bridge structure, pavement, metal beam guard fence, and striping. Crews are scheduled to place cement treatment, temporary asphalt for traffic control, and installing storm culverts.
Young St. - City of Longview
This project consists of constructing sidewalks and accessible ramps for people with disabilities on both sides of Mobberly Ave. This week, the contractor will be clearing right of way and pouring concrete for the sidewalk on the south side of the street.
I-20 Resurfacing
This project consists of milling asphalt off the surface and placing new hot mix asphalt from the Sabine River bridge to the Harrison County line. Work will be done in both the east and westbound lanes. The contractor is scheduled to perform punch list items and striping. Motorists should expect lane closures during overnight hours.
----------------------------------------
Henderson County
Athens crews will be performing mill and inlay on SH 31 in Chandler in the eastbound lanes. Motorists should expect lane closures with flaggers controlling traffic. Crews will also perform fog seal operations on FM 1615 and RM 3054. Motorists should expect lane closures and delays at both locations.
Henderson County construction projects updates:
BUS 19 Sidewalks
The contractor is nearing completion. Motorists should expect lane closures while work is in progress. The project includes sidewalk and pedestrian access improvements.
SH 31 Landscape Development
This project consists of adding landscaping, fresh vegetation, and edging. Motorists should expect possible lane closures when work is in progress. Motorists should use caution when traveling through the work zone.
SH 19 Super 2 Project
The contractor has begun cement treating for roadway widening in the northbound lane. Crews are also expected to place flex base material in the northbound lane. Motorists should expect daily lane closures. The speed limit is reduced to 60 mph throughout the project limits. This project includes adding passing lanes in both directions at multiple locations. It also includes grading, drainage structures, pavement markings, and signage.
BUS 31 Rehabilitation
The project includes removal of current surface, base repairs, resurfacing, striping, and signage.
----------------------------------------
Rusk County
Henderson crews will be repairing edges and base failures on FM 839, FM 13, and SH 42. Crews will also perform surface repairs at various locations throughout the county. Contractor crews will also be removing trees at various locations. Expect lane closures with flaggers and a pilot car controlling traffic.
Rusk County construction projects updates:
US 259
This project consists of removing some crossovers for safety and adding left turn lanes to the remaining crossovers. The contractor is scheduled to remove culverts and modify the existing drainage structure.
US 84 - FM 225 East to CR 3155
This project includes reconstruction of US 84, extended structures, a hot mix asphalt surface, new signage, and striping. This week, the contractor is scheduled to install the guard fence and perform edge work. Motorists should expect alternating lane closures.
SH 315
This project consists of widening pavement edges and installing a separation between opposing traffic lanes to improve safety. Work will also include adding a passing lane in each direction. This week, the contractor is scheduled to lay asphalt. Motorists should expect alternating lane closures. Crews will also perform striping and guard fence installation.
SH 43
This project consists of milling approximately six inches off the surface and replacing it with new hot mix. The project also includes clearing the right of way, replacing driveway pipes, and striping. This week, the contractor is scheduled to perform edge work and punch list items. Expect lane closures with flaggers controlling traffic.
US 259 and US 79 Landscaping
This project consists of improving and upgrading the flower beds at US 259/US 79, Wilson St., and US 79/Fairpark St. The contractor will be constructing new borders and placing new vegetation. Motorists should expect temporary lane closures.
----------------------------------------
Smith County
Smith County crews are scheduled to address ditch and drainage issues around the county. Lane closures will be in place. Another crew is scheduled to work on FM 2908. Work will be from FM 2767 to SH 31. Motorists should expect lane closures. Crews will also work on the FM 14 and I-20 overpass. Motorists should expect closures nightly from 6 pm to 6 am, Sunday and Monday. Crews will also work on eastbound and westbound main lanes on I-20 from FM 2015 to US 271. Motorists should expect closures on I-20 from Sunday, Dec. 14 through Wednesday morning. Closures will be from 6 pm to 6 am each day.
Smith County construction projects updates:
US 69 Rehab Existing Road and Restricted Crossing U-Turn (R-Cut)
The contractor is scheduled to perform work on the Mudd Creek bridge. Lane closures are expected. This work will be done during daytime hours. This project consists of rehabilitating existing roadway and installing a restricted crossing U-turn (R-Cut) at the FM 2813 intersection.
US 69 and Henderson St.
The contractor is scheduled to begin beautification work on the medians at US 69 and FM 344. Lane closures are not expected, but motorists should drive with caution. This project consists of beautification work along US 69 in Bullard.
FM 2493 Widen Non-Freeway
The contractor has closed access to CR 172 (Goodson Spur) from FM 2493 for the next four to six weeks as crews work on edge drop-off repairs. Motorists should use CR 177 for the detour. This project consists of widening the existing non-freeway roadway.
Smith County Bridge Rehabilitation
This week, the contractor is scheduled to place material at the SH 19 bridge in Van Zandt County. Also, crews will be removing the metal beam guard fence at the SS 147 bridge. This project consists of cleaning and sealing the existing bridge joints, asphalt work, resurfacing the bridge deck, installing new metal beam guard fencing, steel and concrete repairs.
I-20 Bridge Maintenance
Motorists should expect nightly lane closures on US 69 at I-20. There will also be an eastbound lane closure on the eastbound I-20 service road, just past US 69. The U-turn between US 69 and Jim Hogg Rd. will remain closed. This project is bridge maintenance consisting of cleaning and painting the existing steel bridge structures.
Smith County Bridge Rehabilitation II
Motorists should expect nightly lane closures on I-20 at Saline Creek. Crews are scheduled to perform bridge maintenance and installation of materials. This project consists of cleaning and sealing existing joints, resurfacing the bridge deck, steel and concrete repairs.
FM 16 Widening and Realignment
The project consists of grading, asphalt base, asphalt surface overlay paving, storm drain, bridge, and culvert structures, signing, pavement markings, and signals. A traffic shift is currently in place through town. Traffic will be in two lanes during this phase of construction. Crews will continue embankment installation. Crews are also scheduled to install base and sealcoat from Toll 49 heading west. Paving operations are scheduled to begin in January 2026. (This project is in Smith County but is managed by the Mineola Area Office.)
SH 31 Resurfacing
This project includes base repairs, resurfacing, striping, and sign installation. Awaiting final project acceptance. (This project is in Smith County but is managed by the Athens Area Office.)
---------------------------------------
Van Zandt County
Canton crews are scheduled to perform sealcoat prep on FM 859 between I-20 and US 80. A second crew will be performing bridge channel maintenance and ditch work at various locations. Motorists should expect lane closures with flaggers controlling traffic.
Van Zandt County construction projects updates:
FM 17, FM 47, and FM 859 Bridge Replacement
This project includes construction of new bridges and approaches, grading, base and surface work, and installation of metal beam guard fencing. Motorists should expect reduced speed limits and narrowed shoulders on both the I-20 main lanes and frontage roads. All bridges are open to traffic. The contractor is working on punch list items on all bridges.
FM 1255 Rehabilitate Existing Roadway
This project is for the rehabilitation of the existing roadway consisting of roadway widening, grading, rework base material, cement treatment, flex base, resurfacing intersections & driveways, extending cross structures, signs, and pavement markings. Work will be completed under live traffic conditions. Right of way prep and tree trimming are ongoing. Roadway rehabilitation operations and cross structure installation are ongoing. This work also consists of milling the existing roadway. Lane closures and speed zone reductions are expected. Motorists should expect delays.
I-20 WB Exit Ramp at SH 19
This project consists of ramp improvements. Project closeout is underway.
E Tyler St. at Mill Creek Bridge
This project includes bridge replacement, new approaches, grading, and base repairs. The contractor is working on closeout items. E. Tyler Street is closed to through traffic.
FM 1651 Rehabilitate Existing Roadway
The contractor is scheduled to continue roadway widening between Tundra and SH 19. This project includes widening the road, repairing the base, adding signs, and painting new stripes. Crews will complete groundwork in one-mile segments. Drivers should expect lane closures and slower speed limits in the area. Motorists should expect delays. (This project is in Van Zandt County but is managed by the Athens Area Office.)
FM 279 Rehabilitation
Crews are scheduled to perform edge repairs and bridge maintenance. Motorists should expect delays and use caution when traveling through the area. Lane closures are in place. The project consists of grading, drainage improvements, asphalt paving, striping, and signage. (This project is in Van Zandt County but is managed by the Athens Area Office.)
---------------------------------------
Wood County
This week, crews are scheduled to continue bridge maintenance at various locations. Crews will also address base repairs on FM 14 between SH 154 and FM 49. Crews will also perform overlay on FM 778 between FM 49 and US 80. Expect lane closures and flaggers controlling traffic.
Wood County construction projects updates:
US 69 Grade-Separated Interchange
This project consists of grading, base, asphalt, drainage, structures, overpass, signing, and striping. The project also includes curb and gutter work along the frontage roads. Crews are scheduled to continue work on the retaining walls. Crews are scheduled to work on drainage structures and driveways. Motorists should use caution due to large equipment operating in the work zone. Traffic is now on temporary paving south of existing US 69. Motorists should expect delays.
----------------------------------------
I-20 Total Maintenance Contract