Power equipment failures don't follow procurement timelines.
Every data center has redundancy plans for power systems.
Far fewer have a redundancy plan for the equipment itself.
When a transformer, switchgear lineup, breaker, or protective relay fails unexpectedly, operators often discover a difficult reality:
Replacement equipment may not be available when they need it.
The new risk landscape:
Today's data centers face:
As a result, the consequences of an equipment failure can be more severe than ever.
What a contingency plan should include
Forward-thinking operators are developing strategies that include:
Inventory is part of reliability:
Traditionally, reliability discussions focus on maintenance and redundancy.
Today, reliability must also include availability of replacement equipment.
If a critical component fails and the replacement is 12 months away, redundancy only goes so far.
How IPS helps:
IPS helps data center operators reduce contingency risk through:
Bottom line:
The best time to create a contingency plan is before you need one.
Having a strategy for critical power equipment can mean the difference between a manageable disruption and a major operational event.
Talk to IPS about developing a contingency strategy for your critical power infrastructure.