October 13, 2026
2025-603
The Governor of California
President pro Tempore of the Senate
Speaker of the Assembly
State Capitol
Sacramento, CA 95814
Dear Governor and Legislative Leaders:
State law authorizes my office to establish a high-risk government agency audit program for the purpose of identifying, auditing, and issuing reports on state issues that have major challenges associated with their economy, efficiency, or effectiveness. Since 2013, the State's deteriorating water infrastructure has been a recurring item on our state high-risk list. Accordingly, my office conducted an audit of the oversight of dams and levees by the Department of Water Resources (Water Resources), Governor's Office of Emergency Services (Cal OES), and the Central Valley Flood Protection Board. Overall, we found that poorly maintained dams and levees continue to pose a risk to public safety.
Existing law does not require dam owners to identify and set aside the financial reserves necessary to maintain their dams in satisfactory condition. Consequently, some owners of dams that require repairs or improvements to meet state safety standards have delayed those activities because they do not have the financial resources. Such delays increase the risk that these dams may fail, which could endanger hundreds of thousands of people and billions of dollars of property. Water Resources expects that its reevaluation of conditions of risky dams will lead to an increase in the number of dams in poor or unsatisfactory condition. Moreover, Water Resources does not have the authority to take meaningful action to minimize the risk that a dam poses until the dam reaches a state of imminent failure. Cal OES has not collaborated with Water Resources to ensure that owners of dams complete their required emergency action plans, which help protect life and property if dams fail.
We also found that Water Resources has not followed state law requiring it to take over the maintenance of levees when levees' local maintaining agencies do not meet their contractual obligations. Water Resources determined that the maintenance work would draw resources away from its statewide flood-risk reduction efforts. However, the lack of maintenance increases the chance that levees may fail, which would endanger hundreds of thousands of people in the surrounding communities and could cause billions of dollars in property damage.
Respectfully submitted,
GRANT PARKS
California State Auditor
| Cal OES | Governor's Office of Emergency Services |
| EAP | Emergency Action Plan |
| FEMA | Federal Emergency Management Agency |
| FMAP | Flood Maintenance Assistance Program |
| LMA | local maintaining agencies |
| SWIF | Systemwide Improvement Framework |
In our December 2025 biennial assessment of statewide issues that represent a high risk to the State or its residents, our office concluded that the condition of the State's dams and levees remains a high-risk issue.1 In the assessment, we noted that from 2023 to 2025, the number of the State's dams in poor or unsatisfactory condition had nearly doubled, from 30 to 52 of the State's 1,230 dams in operation at that time. Although the public and private entities that own dams in the State are responsible for their construction, operation, and maintenance, state law provides the Department of Water Resources (Water Resources) with primary oversight authority over the dams to ensure Californians' safety. In the same 2025 assessment, we also highlighted that levee maintenance in the Sacramento River and San Joaquin River drainage basins had worsened since 2022. The maintenance and safety of levees is a tiered system in which the State, through Water Resources and the Central Valley Flood Protection Board (Board), assume these responsibilities from the federal government. Although Water Resources is largely responsible for overseeing the levees in this area, the State delegated levee maintenance duties to local maintaining agencies (LMAs), which include levee districts, reclamation districts, cities, counties, private landowners, and other public agencies and municipalities. Nonetheless, Water Resources must inspect the levees on a regular basis to ensure that LMAs are performing their statutory responsibilities.
Water Resources has assessed 1,077 of the State's 1,222 dams as satisfactory and 87 as fair.2 However, as of May 2026 there are now 57 dams in poor or unsatisfactory condition, including 40 that have hazard classifications of high or extremely high.3 Hazard classifications are based on the number of people who would be in danger if a dam failed and the projected financial damage. They do not indicate the likelihood of a dam's failure and are not a measure of the condition of the dam. Failure of just one of these 40 high or extremely high hazard dams could pose harm to as many as hundreds of thousands of people and cause billions of dollars in property damage.
A number of factors may play a role in these dams' deficient condition, but the most common are their age, the less comprehensive safety standards that were in place at the time of their construction, and their owners' inability to pay for repairs. Existing law does not require dam owners to determine and set aside the financial reserves necessary to maintain their dams in a state of good repair. Although the Legislature strengthened Water Resources' enforcement authority beginning in 2017, the agency has only sent notices of violations to dam owners but has not taken further actions, thereby allowing serious deficiencies to persist. According to Water Resources, its efforts to ensure that dams are repaired before they fail have been hampered by its limited resources. Exacerbating this problem, the owners of 60 dams with significant and higher hazard classifications, including some dams in fair or satisfactory condition, have not complied with state law that requires them to create and submit to the Governor's Office of Emergency Services (Cal OES) Emergency Action Plans (EAPs) that are intended to help protect life and property if the dams fail. In addition, some dam owners who did submit plans have not been responsive to Cal OES's requests for revisions, yet Cal OES has not acted to ensure that they do so. Figure 1 summarizes our results regarding the State's oversight of dams.
Water Resources assessed more than 1,000 dams as being in satisfactory condition.
Water Resources also assessed 40 dams that it classified as high or extremely high hazard as being in poor or unsatisfactory condition, meaning they do not meet safety standards.
The failure of at least one of these dams could pose danger to hundreds of thousands of people and cause billions of dollars in damage.
Old age, weak safety standards at the time of their construction, and a lack of funding.
Water Resources lacks the authority to address abandoned dams before they cause emergencies and has taken minimal enforcement action against dam owners because it is hampered by a limited budget.
Many high-risk dams lack emergency action plans, called EAPs, and Cal OES's requests for revisions to EAPs are unmet.
Source: Cal OES, dam owners, and Water Resources.
Water Resources rated nearly one-third of the 102 LMAs in 2025 as performing unacceptable routine maintenance of levees in the State Plan of Flood Control-a system of flood control facilities that the State is responsible for overseeing. According to Water Resources and the LMAs we spoke with, the LMAs could not afford to perform the necessary maintenance; however, Water Resources has not exercised its full authority to address the risks the chronically underperforming LMAs pose. Although Water Resources has established some targeted repair programs and systemwide efforts to reduce flood risk, its limited funding and LMAs' inability to pay their shares of the costs have hindered Water Resources from addressing all identified critical sites. Water Resources estimates that it and LMAs combined require at least $165 million per year more than they already spend annually to fully address levee maintenance in the State Plan of Flood Control over the next 30 years. Forming state-managed maintenance areas when LMAs do not meet federal maintenance standards would allow Water Resources to perform the work to ensure compliance while holding the landowners who benefit financially responsible; however, Water Resources has not taken this step. Figure 2 summarizes our results regarding the State's oversight of levees.
Figure 2 explains the following:
Nearly one-third of LMAs performed unacceptable routine maintenance of their levees in the State Plan of Flood Control. The primary reason for the lack of maintenance was that LMAs claimed they could not afford the necessary maintenance. Water Resources could, but has not, formed state-managed maintenance areas to perform the maintenance in place of the LMAs. Rather than forming maintenance areas, Water Resources' has completed systemwide projects that do not directly address the LMAs' unacceptable maintenance and that are expensive and lengthy. Consequently, the State has not used the full extent of its authority to limit the risk attributable to LMAs' insufficient maintenance.
Source: LMA representatives and Water Resources.
To address these findings, we make recommendations to the Legislature to broaden Water Resources' enforcement authority and to amend state law to include additional deadlines for dam owners to submit EAPs to Cal OES. We further recommend that Cal OES coordinate with Water Resources to take enforcement actions against dam owners that have never submitted their EAPs to Cal OES; that Water Resources use the full extent of its enforcement authority to ensure that dam owners make needed repairs; and that Water Resources form state-managed maintenance areas when it determines that LMAs do not meet their federal requirements.
The Board and Cal OES agreed with our findings and stated that they will implement our recommendations. Water Resources disagreed with many of our recommendations and did not clearly indicate whether it will take actions to implement any of them.
In December 2025, the State Auditor's Office issued its biennial assessment of statewide issues that represent a high risk to the State or its residents. Conducted as part of our state high-risk government agency audit program, that assessment concluded that the condition of the State's dams and levees remains a high-risk issue.4 Dams are large structures constructed to impound water and store it in lakes and reservoirs. The stored water can be used to mitigate the impact of potential floods, provide drinking water, generate electricity, and provide a space for recreational activities.5 Levees, on the other hand, are earthen embankments that contain, control, or divert the flow of water to provide protection from flooding.
We noted in our state high-risk assessment that since 2023, the number of the State's dams in poor or unsatisfactory condition has increased by 73 percent, from 30 dams to 52 dams. We also said that this increase is likely to continue as Water Resources continues to reevaluate the oldest and riskiest dams. We emphasized that nearly half of all dams in concerning conditions pose an extremely high downstream risk, meaning that a dam failure would cause considerable loss of human life or result in inundation of an area that would affect a population of 1,000 or more people. We found in that assessment that dam safety planning throughout the State remains incomplete: Cal OES had at that time approved EAPs for only 67 percent of the dams required to submit such plans. These EAPs identified the actions that dam owners, and other entities included in the plan, would take to mitigate risk in the event of dam failure. In addition, our assessment highlighted that levee maintenance had worsened over time as the number of LMAs with less-than-acceptable maintenance ratings increased from 71 in 2022 to 80 in 2024, or about 78 percent of all LMAs at that time.
The purpose of our state high-risk government agency audit program is to strengthen the operation of state government by recommending improvements for statewide issues that pose the potential to cause detriment to the State's residents. Consequently, we performed this audit to offer potential solutions to the issues the State is facing in overseeing its dams and levees.
Public or private entities that own dams in the State are responsible for their construction, operation, and maintenance. However, to ensure Californians' safety, state law provides Water Resources with primary oversight authority over all dams under its jurisdiction (jurisdictional dams). The text box provides examples of Water Resources' responsibilities. In addition, Cal OES is responsible for approving the EAPs that dam owners must create when a dam poses a significant hazard to residents.
Source: State law.
Although the State has been responsible for the supervision of dams since 1929, the 2017 Oroville Dam crisis in Butte County drew renewed attention to dam safety. During this crisis, major storms caused the reservoir of the Oroville Dam to rise until it overflowed the dam's spillway, which is a safety structure built to release extra water from a reservoir, and threatened to collapse the spillway and cause major flooding. The imminent threat that the dam posed prompted county officials to evacuate about 188,000 residents from across Butte, Sutter, and Yuba counties until officials determined that it was safe for them to return home. After the Oroville Dam crisis, the State passed a number of laws to enhance Water Resources' inspections of dams and mitigate the risk of a similar crisis in the future.
Following the Oroville Dam crisis, the Legislature amended state law in 2017 to require that Water Resources assign each dam a hazard classification based on the number of people who would be in danger if the dam failed and the dollar value of damage the dam's failure could cause. Water Resources uses the Federal Emergency Management Agency's (FEMA) categories for determining the hazard potential; however, Water Resources added extremely high as an additional classification. We provide the definitions of each classification later in the report. State law requires Water Resources to revise a dam's hazard classification when it identifies changes in a dam's downstream population, critical infrastructure, or land use.
In 2018, the Legislature enacted a requirement that Water Resources inspect dams with a significant or greater hazard each year and dams with a low hazard every two years. During these inspections, Water Resources must evaluate whether the dam owners have adequately maintained their dams and whether the dams have any signs of deficiencies that the dam owners need to remediate. As part of their inspections, Water Resources engineers review records of dam owners' self-inspections and maintenance activities, perform an onsite visual inspection, and require owners to demonstrate that dams follow certain emergency preparedness procedures that state law requires. Based on the results of its inspections, Water Resources assigns dams condition assessments that we define later in the report. Water Resources also identifies dam deficiencies as part of its reevaluation program, which assesses whether its riskiest dams meet current operating standards.
When dam owners or Water Resources identify that dams have functional deficiencies, Water Resources requires that the owners correct the deficiencies in order to mitigate risks. Water Resources works with dam owners to establish reasonable deadlines for them to prepare plans and schedules for their projects and then to complete required work. According to Water Resources' management, dam owners often must complete complex repair projects to remediate their dams' deficiencies. For example, deficiencies such as large cracks in a dam or problems with a submerged feature may require complicated planning and extensive construction. Figure 3 outlines the various steps that Water Resources requires dam owners to take to verify a deficiency, plan to remediate the deficiency, and then to complete their plan. The figure also identifies the points at which Water Resources reviews and approves the work. According to Water Resources management, given the complexities of analyses, planning, and work, it can take up to two decades to remediate a deficiency from the time Water Resources or the dam owner first identifies it. In the meantime, Water Resources may impose reservoir restrictions on the dams to reduce the risks posed by their deficiencies.
Water Resources identifies a safety deficiency at a dam.
This plan and schedule includes activities like planning and performing engineering analyses to better understand the cause and effect of the deficiency, and analyses to choose between multiple solution options.
Water Resources may order a safety reservoir rection as a temporary risk reduction measure at this step.
If Water Resources asks for revisions, the dam owner will revise tis plan and schedule until Water Resources approves.
The dam owner may incrementally submit documentation to Water Resources for approval of portions at a time.
Water Resources may require that the dam owner conduct additional analyses.
Water Resources conducts construction inspections to ensure that the dam owner is completing the work in accordance with the approved plans and specifications.
Water Resources also works with the dam owner to review and approve any changes to the project.
Water Resources conducts a final inspection of the project.
Source: Water Resources.
As part of the legal requirements established following the Oroville Dam crisis, Water Resources must ensure that owners of a dam with a significant or greater hazard classification prepare a map showing the area at risk of inundation if the dam were to fail and cause flooding (inundation maps). Inundation maps show the areas that would be flooded and water travel times if dam failure were to occur. Dam owners and emergency management authorities use inundation maps to facilitate timely notification and evacuation of areas that could be affected by a dam failure or flood condition. State law requires that dam owners submit their inundation maps to Water Resources for review and approval when Water Resources classifies their dams as having a significant or greater hazard classification, or when their dams' circumstances change.
Cal OES and Water Resources share responsibility to ensure that owners of dams with a significant or greater hazard classification create EAPs for their dams. As we previously describe, an EAP outlines actions to be undertaken during an emergency to minimize or eliminate the potential loss of life and property damage. State law requires that EAPs adhere to FEMA guidelines and to requirements that Cal OES establishes. Further, Cal OES must approve the EAPs. For dams that Water Resources had classified as a significant or greater hazard as of June 2017, state law required dam owners to submit their initial EAPs to Cal OES from January 1, 2018, through January 1, 2021, with the specific due date dependent on the hazard level of the dam. State law requires owners of dams that are newly classified as a significant or greater hazard to create an EAP upon Water Resources' approval of their inundation map. Although state law requires EAPs to be approved by Cal OES, it grants Water Resources the authority to take administrative actions against noncompliant dam owners that lack an approved EAP.
The Legislature amended state law beginning in 2017 to authorize Water Resources to take administrative enforcement actions against dam owners who violate state law governing the safety of their dams, Water Resources' requirements, or Cal OES's EAP requirements. In 2022, Water Resources finalized regulations that outline how it may execute its enforcement authority. When dam owners are not compliant, Water Resources may issue a Notice of Violation to them that describes their violations and the remedial actions that they are required to take. Although Water Resources has never taken punitive enforcement actions against dam owners that fail to remedy their violations because of its managers' claims of limited enforcement resources, Water Resources may issue administrative complaints that seek to impose the penalties that the text box lists. The penalties are meant to compel owners to remedy their violations.
Source: State law.
The State is responsible for overseeing the levees in the State Plan of Flood Control. The State Plan of Flood Control is the name given to a portion of the Central Valley flood management system for which the State provided assurances of cooperation to the federal government. For example, the State must maintain and operate the State Plan of Flood Control portion of the Central Valley flood management system according to federal requirements. Levees within the State Plan of Flood Control are known as project levees and are located in the Sacramento River and San Joaquin River watersheds, as Figure 4 shows. Water Resources performs verification inspections of LMAs' maintenance of the project levees and reports to the U.S. Army Corps of Engineers (Army Corps) periodically regarding the status of levee maintenance, a process we describe in more detail below.
Source: State Plan of Flood Control Descriptive Document.
The federal government, Water Resources, the Board, and LMAs share responsibility for overseeing or managing the project levees, as the text box shows. Facilities of flood management, including project levees, in the State Plan of Flood Control are ultimately subject to federal jurisdiction. However, the maintenance and safety of project levees is a tiered system in which the State, through Water Resources and the Board, assumes these responsibilities from the federal government. The LMAs-which include levee districts, reclamation districts, cities, counties, private landowners, and other public agencies and municipalities-then assume the responsibilities from the State through agreements with it. LMAs are typically funded through local benefit assessments and special taxes.
The Army Corps:
The Board:
Water Resources:
LMAs:
Source: Army Corps, Water Resources, and the Board.
Because of these overlapping responsibilities, the entities involved must collaborate to ensure consistency between federal and state investment approaches for project levees. Similarly, Water Resources has to carefully consider involved local, state, and federal agencies, as well as special interest nongovernmental organizations, when updating the Central Valley Flood Protection Plan every five years, which the Board must adopt. This plan presents a systemwide approach to protecting the lands currently protected from flooding by existing facilities, such as project levees, of the State Plan of Flood Control. The Board and Water Resources also collaborate to lead, support, and plan flood risk reduction efforts throughout the State Plan of Flood Control.
Water Resources inspects the project levees on a regular basis. For example, it completes annual spring and fall maintenance inspections for each LMA that has a levee in the State Plan of Flood Control. During these inspections, it evaluates the status of maintenance practices and observable levee conditions and then rates the levees as acceptable, minimally acceptable, or unacceptable, as the text box describes. During these inspections, Water Resources ensures that LMAs are performing their legal and statutory responsibilities and are meeting their legal obligations under assurance agreements with the State. Water Resources also uses the inspection results to identify repair needs.
Acceptable-No immediate work required, other than routine maintenance. The flood protection project will function as designed and intended with a high degree of reliability, and necessary cyclical maintenance is being performed adequately.
Minimally Acceptable-One or more deficient conditions exist in the flood protection project that needs to be improved or corrected. However, the project will essentially function as designed with a lesser degree of reliability than what the project could provide.
Unacceptable-One or more deficient conditions exist that may prevent the project from functioning as designed, intended, or required.
Source: Water Resources.
Water Resources' Inspection Section also implements the Utility Crossing Inspection Program. Through this program, the Inspection Section performs external inspections of pipes and other conduits that cross project levees. The Utility Crossing Inspection Program inspects about 20 percent of State Plan of Flood Control pipes annually on a 5-year cycle. Water Resources makes the data it collects through these various inspections available to LMAs, the Board, the Army Corps, and the public.
Levees are susceptible to unexpected failure. For example, deficiencies caused by erosion from wave action, rodent burrowing, and unauthorized encroachments can, if left unaddressed, worsen over time to become critical problems. Further, according to Water Resources management, significant weather events such as extreme tides, severe rainfall, or rapid temperature rise leading to rapid snow melt can cause higher-than-average quantities of water to run through the waterways adjacent to levees. When the waterways are inundated with these large quantities, it is known as a high-water event. High-water events place stress on levees that can exacerbate existing minor issues or directly damage the levees.
Because levees may require repairs beyond what Water Resources identifies as normal LMA maintenance, the agency oversees a multitude of programs related to repairing levees. The text box lists each of Water Resources' levee repair programs and describes its purpose. After Water Resources catalogs and classifies project sites, it contacts LMAs in order of risk priority to offer cost-sharing opportunities to complete the identified repairs.
Flood System Repair Program:
Storm Damage Emergency Repair Program:
Pipe Repair Program:
Source: Water Resources.
State law identifies requirements that Water Resources must adhere to when completing dam inspections, and Water Resources' policies reflect these requirements. For example, state law requires that inspections must include visual inspection of major features of the dam, including its groins, abutments, toe areas, spillway, and outlet works. In addition, state law requires Water Resources to inspect dams every year or two years, depending on the hazard classification of the dam. The text box lists the definitions of each hazard classification.6 Water Resources must also require engineers to ensure that dam owners demonstrate the full operability of certain dam features at least every three years. We reviewed Water Resources' policies and procedures and determined that they included all key legal requirements.
Low-No probable loss of human life and low economic and environmental losses. Losses are expected to be principally limited to the owner's property.
Significant-No probable loss of human life but could cause economic loss, environmental damage, impacts to critical facilities, or other significant impacts.
High-Expected to cause loss of at least one human life.
Extremely High-Expected to cause considerable loss of human life or result in an inundation area that has a population of 1,000 or more.
Source: Water Resources.
We also found that Water Resources' dam engineers followed Water Resources' inspection policies. We reviewed inspection records for 10 dams with high or extremely high hazard classifications, which according to their definitions mean they could endanger at least one or at least 1,000 lives respectively: two were assessed as satisfactory condition, one was assessed as fair condition, six were assessed as poor condition, and one was assessed as unsatisfactory condition. The text box lists the definition of each condition assessment. These dams are located throughout the State, consist of five different design types, vary in age and capacity, and generated power in some instances. We reviewed the most recent inspection report for each dam and found that engineers followed Water Resources' policies. For example, available documentation demonstrated that engineers reviewed the major dam features and ensured that dam owners demonstrated that their critical dam features were operational or noted that they were not.
Satisfactory-No existing or potential dam safety deficiencies are recognized. Acceptable performance is expected in accordance with the minimum applicable state or federal regulatory criteria or tolerable risk guidelines.
Fair-No existing dam safety deficiencies are recognized for normal operating conditions. Rare or extreme hydrologic and seismic events, such as floods and earthquakes, may result in a dam safety deficiency. Risk may be in the range to take further action.
Poor-A dam safety deficiency is recognized for normal operating conditions, which may realistically occur. Remedial action is necessary. This condition may also be used when uncertainties exist as to critical analysis parameters that identify a potential dam safety deficiency. Investigations and studies are necessary.
Unsatisfactory-A dam safety deficiency is recognized that requires immediate or emergency remedial action to resolve the problem.
Not Rated-The dam has not been inspected, is not under state jurisdiction, or has been inspected but has not been rated.
Source: Water Resources.
Although most dams are in satisfactory or fair condition, Water Resources has identified many dams that are in poor or unsatisfactory conditions, with several of those dams posing substantial risks to downstream residents and economies. As Table 1 shows, 1,077 of the 1,222 dams that Water Resources regulates are in satisfactory condition. Further, 87 additional dams are in fair condition, which indicates that no existing dam safety deficiencies exist for normal operating conditions. However, Water Resources has rated 56 dams as being in poor condition and one in unsatisfactory condition. Further, 39 of the 56 dams that are in poor condition and the one dam that is in unsatisfactory condition pose a high or extremely high hazard to downstream residents and property.
Failure of any of the 40 dams in poor or unsatisfactory conditions could cause significant loss to local communities. These dams are spread throughout the State but are clustered in densely populated urban areas. As Figure 5 shows, dams in poor condition that pose extremely high hazard are generally concentrated in the Bay Area, San Diego, and Los Angeles areas-the most populated areas in the State. If the deficiencies of these riskiest dams cause them to fail, they could collectively endanger as many as 1.5 million people and cause more than $265 billion in economic damage. For example, it is estimated that the failure of one of these dams assessed as in poor condition could endanger more than 400,000 people and cause nearly $92 billion in economic damage. Table A in Appendix A provides data regarding the hazard posed by poor and unsatisfactory dams.
Figure 5 shows the locations of 40 dams across the state that have elevated hazard ratings and low condition ratings. There are 19 dams with high hazard and poor condition, 20 dams with extremely high hazard and poor condition, and one dam with extremely high hazard and unsatisfactory condition.
Source: Water Resources data.
We reviewed six dams to better understand their specific circumstances for their identified deficiencies. These included four dams that Water Resources had assessed as poor, one in unsatisfactory condition, and one in fair condition. Water Resources' engineers have identified multiple deficiencies at each dam we selected. These dams were all classified as extremely high hazard, are used for different purposes, and are of varying ages. Table B in Appendix B presents a summary of each dam's circumstances.
Many of the dams in the State were not built to operate within modern safety requirements. Safety requirements for dam design plans to limit public risk have evolved significantly since the State began regulating dams in 1929. As a result, dams built before the State established its current requirements have had to be retrofitted to meet those standards. Water Resources' management stated that approximately 60 to 70 percent of the deficiencies that Water Resources engineers have found among the 144 dams with less than satisfactory condition assessments are related to not meeting design standards.
For example, Water Resources' management explained that Dam F in Table B, which was built before 1960, does not meet modern standards because it was built when the standards were not as comprehensive as they are today. Water Resources requires that this dam be able to safely pass up to 220,000 cubic feet per second of water, which is the highest load that Water Resources estimates the dam would incur under very extreme conditions using a methodology established in 1999-more than 40 years after the dam's construction. However, this dam can safely pass only 147,000 cubic feet per second of water, which is 33 percent less than the modern requirement. According to the dam owner, if this dam experienced a situation involving this extreme load of water, the water would spill over the top of the dam, causing flooding downstream and erosion of the dam. All six of the dams we reviewed had deficiencies related to age, and 32 of the 39 high or extremely high hazard dams in poor condition were built before 1960.
Failure to meet standards can also occur because of lack of maintenance. For example, according to the dam owner, Dam F in Table B is also deficient because the sediment accumulating from natural storm runoff has built up over time to the extent that it now inhibits the dam's intake tower, which is designed to retain water. However, the dam owner did not remove the sediment. As a result, the intake tower may cause other dam features to break apart during an emergency, which could result in the dam's failure and downstream flooding. Water Resources' management also explained that over time, materials such as the concrete and steel used in dam features and appurtenances, such as spillways, age because of exposure to the elements, inhibiting those features from functioning as intended.
In another instance, Dam C in Table B is more than a century old, and its concrete is deteriorating. In this case, the concrete has deteriorated to such an extent that repairs cannot be completed without further compromising the dam's integrity. Prior to discovering the condition of the concrete, Water Resources determined that the entire dam was seismically unstable, and the deteriorating concrete has further jeopardized the dam's stability should an earthquake occur and has made the dam more vulnerable during large storm events. Figure 6 displays an example of concrete deterioration that contributed to Water Resources assessing that specific dam to be in poor condition.
Figure 6 shows extreme concrete deterioration to two dam structures exposed to the elements. The first image shows a large crack running down a concrete pillars with concrete missing along parts of the crack. The second image shows concrete flaked off a concrete slab, with pieces of concrete pooled underneath the slab. The figure emphasizes that large cracks degrade the dam's structural integrity.
Source: Auditor photographs taken during on-site visit in March 2026 and interviews with dam owners.
Several dams that are in poor and unsatisfactory condition have operated with deficiencies for at least nine years. We reviewed Water Resources' data to identify when a dam was first assessed by Water Resources as less than satisfactory. The data are from as early as 2017, when Water Resources began tracking dam conditions. We found that 16 of the 40 high or extremely high hazard dams in poor or unsatisfactory condition as of May 2026 had deficiencies that resulted in Water Resources assessing them as fair or poor in 2017. Overall, the percentage of dams in satisfactory condition has decreased from 92 percent of all dams in 2017 to 89 percent in 2025, while the percentage of dams in poor condition has increased from 0.5 percent to 4 percent over the same period. Additionally, only 31, or about 2 percent, of all dams under its jurisdiction (jurisdictional dams) have improved their condition from less than satisfactory to satisfactory condition from 2017 through 2026. Water Resources anticipates that this trend will continue as it completes reevaluations of risky dams that will lead to an increase in the number of dams found to be in poor or unsatisfactory condition during the upcoming years.
Water Resources' management informed us that dam repair projects are often delayed by dam owners because they cannot afford the cost of repairs. When Water Resources identifies deficiencies at dams, it works with dam owners to establish deadlines for them to prepare plans and schedules for their projects and then to complete required work. Figure 7 provides an example of a dam owner-the owner of Dam A in Table B-that missed the deadlines that Water Resources established for it to provide plans to address its dam's deficiencies and for one of its project milestones. While the dam owner undergoes the planning process, Water Resources may impose a reservoir restriction on the dam to reduce the risks posed by the dam's deficiencies. Water Resources has active restrictions on 49 dams as of September 2025, including restrictions on Dams A, C, and E in Table B. Water Resources received $464 million in 2023 for dam safety and climate resilience, a portion of which it plans to use for grants to supplement dam owner repair costs. However, Water Resources estimates that the cost for dam owners to repair California's jurisdictional dams to obtain satisfactory assessments is approximately $28 billion. Specifically, Water Resources estimates that dams currently in less than satisfactory condition require $18.5 billion now. It further estimates an additional $9.4 billion for dams it will likely identify as less than satisfactory in the next five years. Water Resources released guidelines for its grant program for public comment that closed in August 2026.
Figure 7 shows a dam owner's timing to respond to three dam deficiencies. The owner missed its deadlines to submit to Water Resources its plans to address its dam's deficiencies by five to six years. The first deficiency type, labelled as outlet deficiencies, had an initial deadline of August 2017 but the dam owner did not submit its plans until May 2023. The next two deficiencies, labelled as spillway deficiencies and collapsing spillway wall, both had initial deadlines of September 2017 but the dam owner did not submit a plan for either deficiency until October 2023. The figure emphasizes that the dam owner has still not repaired any of these deficiencies at its dam as of 2026. Lastly, the figure notes that the dam owner missed its project milestone for the outlet deficiencies in March 2026.
Source: Correspondence between Water Resources and dam owner.
To better understand how long the dams' deficiencies have been outstanding and why their owners have not completed their required remediations, we reviewed Water Resources' correspondence records and interviewed representatives of the six dams with extremely high hazard classifications that we discussed earlier. The owners of dams A, B, C, E, and F in Table B told us that they do not have resources to pay for their repairs. Water Resources estimates the repair costs for Dam B to be about $22 million while the owner of Dam F estimates its repair costs at $314 million. Although representatives of these owners cited delays in their projects because of complexities involved in developing plans or staffing issues, each also explained that their organization ultimately did not know how they would fund their repairs. The owners of Dams A and B explained that they have several assets in addition to their dams for which they must prioritize limited funding. For example, the owner of Dam B took approximately two decades to begin to address a deficiency at one of its dams because it prioritized funding for other projects-such as those related to potable water-that it believed had a greater impact on the livelihood of its constituents than repairing the dam. Similarly, the owner of Dam A stated that it took more than five years to develop a plan to address deficiencies with its dam because it prioritized funding other projects-such as an improvement project for a water treatment facility-during that time. Without plans to pay for their projects, it is unclear whether the dam owners will be able to complete their projects to address public safety concerns.
In June 2017, Water Resources identified that Dam C may have potential geologic, structural, or performance issues that would jeopardize its ability to withstand flood events and therefore requested that the dam owner develop a comprehensive assessment to address these concerns. The dam owner submitted this assessment in 2019, and Water Resources verified in 2025 that the owner had made some of the necessary repairs. However, the dam owner did not complete the rest of the repairs after discovering the extent of the concrete deterioration at the dam. The dam owner instead opted to replace the dam entirely. In September 2025, the dam owner informed Water Resources that its estimated cost to replace the dam ranged from $474 million to $675 million and that it had lost a major funding source for the project. As a result, the dam owner no longer had sufficient funding for the replacement project, resulting in further delays to remediate the dam's deficiencies. To mitigate risks in the meantime, Water Resources and the dam owner have agreed to reduce the amount of water the dam is allowed to hold, to minimize the effects of flooding should the dam fail.
Only the owner of Dam D has made progress on resolving its dam's deficiencies and is on track to complete the work. Water Resources first assessed the dam as being in fair condition in June 2023 when it determined that the dam could not withstand the extreme water load that the department estimated it could experience. Water Resources further downgraded the dam's assessment to poor in December 2023 upon discovering a further deficiency. According to the dam owner, it has since worked to address both deficiencies and has experienced delays only because it had to revise its plans based on feedback from its federal oversight agency and acquire additional environment impact permits, but not because of funding concerns. The dam owner expects all required repairs on the dam to be completed by 2027. According to Water Resources management, because it does not have concerns regarding the owner's ability to afford its repairs, this scenario is an excellent example of how permitting can interfere with the timeliness of dam repair projects.
State law currently assigns dam owners the responsibility for dam maintenance but does not require that dam owners maintain funding for these repairs. According to state law, dam owners are responsible for operating and maintaining their dams so that they do not constitute a danger to life or property. However, even though planning to fund repairs for dams that pose high and extremely high hazards is an important component of ensuring public safety, state law does not require dam owners to conduct any formal planning or to maintain a financial reserve to support large-scale repair projects or respond to emergencies. In the absence of these requirements, some dam owners we reviewed have not prioritized funding their repair projects and, as a consequence, they have experienced significant delays in addressing deficiencies. These delays leave people and property downstream from the dams vulnerable to flooding for periods longer than necessary. State law amendments that would require dam owners to have a long-term plan identifying expected maintenance and repairs, along with strategies to fund them, would help ensure the safety of the surrounding communities. A representative of one of the dam owners-which owns several dams with ratings of less than satisfactory-agreed that this requirement would be beneficial.
Water Resources has not fully exercised its enforcement authority to ensure that dam owners repair their dams in a timely manner. Beginning in 2017, state law granted Water Resources authority to take administrative enforcement action against dam owners that do not comply with any provision of state law pertaining to the supervision of dams and reservoirs or that disregard Water Resources requirements to take corrective action to restore their dam conditions. As Figure 8 illustrates, enforcement actions that Water Resources may take against a noncompliant dam owner include civil penalties; reservoir restrictions; property liens, fees, penalties and interest imposed by statute; and any other actions that Water Resources deems necessary to ensure compliance. As of April 2026, Water Resources' engineers had referred owners of 44 dams for enforcement actions. As we discuss later, Water Resources sent notices of violations to owners of 16 of these dams that had not submitted inundation maps or EAPs for their dams. Water Resources resolved the referrals related to three dams without sending a Notice of Violation and rejected the referrals related to five other dams for various reasons, including determining that the dam owner was not responsible for its unpaid annual fees or that Water Resources had a pre-2017 copy of the dam's inundation map. However, as Figure 9 shows, Water Resources has not taken action against owners of the remaining 20 dams to ensure that they addressed their violations, such as owners of four dams that had violations for not remediating their dams' deficiencies. Water Resources' managers said it has not taken further enforcement action because of the time it took to develop its enforcement regulations and because of its lack of enforcement resources.
Figure 8 is a flowchart which shows the steps Water Resources takes to compel dam owners to comply with its order to address safety issues. First, Water Resources refers dam owners for enforcement when owners do not comply with its safety orders. Next, enforcement staff review referrals to ensure validity and either accept or reject the case. If the enforcement branch accepts the case, then enforcement staff send Notices of Violations to dam owners. These notices describe violations and required remedies, set deadlines to resolve the violations, and describe the consequences for lack of action. If the dam owner fails to remedy the violation, enforcement staff sends Administrative Complaints to the dam owner. An Administrative Complaint alleges failure to act, describes the penalties that Water Resources is imposing against the dam owner, and provides an option to request a hearing to argue the violation. The penalties that Water Resources may impose include civil penalties, reservoir restrictions, property liens, fees, or any other actions that Water Resources deems necessary to ensure compliance.
Source: Water Resources and California Code of Regulations.
Figure 9 shows the state of the 44 referrals that Water Resources' engineers have referred for enforcement as of April 2026. Water Resources rejected five referrals, resolved three referrals without enforcement, resolved four cases after sending a Notice of Violation, and recorded sending a Notice of Violation for 12 cases that remain unresolved. The remaining 20 cases are pending enforcement action. Of these, four are related to non-remediated dam deficiencies, five are related to unpaid annual fees, eight are related to missing inundation maps or EAPs, and three are related to illegal dam status.
Source: Water Resources.
Water Resources' initial lack of action on enforcement is because it has prioritized adoption of regulations for its other responsibilities over its enforcement regulations. Water Resources' management stated that the 2017 revisions to state law granted the department several new areas of authority that each required it to develop new regulations. Water Resources began developing regulations for its enforcement authority in 2020, three years after the law passed, because it prioritized developing the regulations for its other authorities and subsequently finalized the regulations in September 2022.
According to its management, Water Resources has not taken compelling enforcement actions against dam owners since it finalized its regulations because it has not been able to staff its enforcement branch and it believed that it could not afford to defend its actions in administrative hearings if dam owners challenged them. The Department of Finance approved a budget change proposal in July 2023 that provided six positions for the enforcement branch and allocated special funds for those positions. However, Water Resources management acknowledged that this budget change proposal did not account for the resources required to participate in administrative hearings. Further, Water Resources management stated that the Legislature required it to cut its budget, including the special funding for the dam safety program, in fiscal year 2024-25 by nearly 8 percent, which affected positions throughout the department, including the dam safety program and enforcement. Although Water Resources used its existing staff to evaluate enforcement referrals and send notices of violations, its management claimed that the reduced funding limited the department's ability to hire for new positions, so it focused instead on ensuring that it fulfilled its mandated responsibilities, which do not include enforcement. Water Resources' management further stated that it would have pursued an administrative complaint against a few noncompliant dam owners had it requested and obtained sufficient funding for the associated legal costs. In January 2026, Water Resources' management submitted a budget change proposal, which was approved in June 2026, that increased the annual rates it charges dam owners so that it can cover litigation costs associated with administrative complaints. According to Water Resources' management, it has filled four of the six enforcement positions to date. However, Water Resources management stated that the department has not been able to fill the remaining positions because it cannot find qualified individuals to accept the positions.
Because of these limitations, Water Resources has not compelled dam owners to make repairs and bring their dams up to legal standards. Since developing its enforcement branch in 2023 through May 2026, Water Resources staff have referred four cases to its enforcement branch in which the dam owners have not taken sufficient action to repair a deficiency. For example, the owner of one dam has refused to fix a large hole in its dam, as Figure 10 shows, that could cause flooding and, in turn, could affect nearly 300 people and cause more than $88 million in economic damage.7 These cases, which range in nature from unresponsive owners to outstanding issues with critical dam features, have been pending with the enforcement branch for an average of two years.
Source: Water Resources staff and Google Maps as of September 2026.
Notwithstanding its lack of enforcement action, Water Resources' current options for sanctions would not ensure that dam owners remediate their dams. Despite such efforts as sending notices of violations to noncompliant dam owners, levying fines, and restricting reservoir levels, some dam owners may continue to ignore Water Resources' orders and operate their dams without remediating their deficiencies. This could be particularly true if dam owners claim they cannot afford the cost of repairs. Water Resources does not plan to refer dam owners to its enforcement branch if the owners claim they cannot afford the work required to remediate their deficient dams, as long as they provide updates to Water Resources about their progress and follow its safety orders. However, allowing dam owners to continue to operate dams without making necessary repairs could place lives and property in jeopardy. For example, according to a case study published by the Association of State Dam Safety Officials, two dams in Michigan failed in 2020, causing extensive property and environmental damage and resulting in the evacuation of 10,000 people. Both dams had long-standing, known deficiencies that created a flood risk; however, the former and current dam owners did not make repairs because they claimed that they could not afford them.
Water Resources' inability to directly address dam deficiencies unless the dam poses a danger to the safety of life or property creates undue risk. Under extreme circumstances, Water Resources has the authority to repair a dam during an emergency and undertake that responsibility directly. State law requires Water Resources to immediately employ any remedial means necessary to protect life and property if either the condition of any dam or reservoir is so dangerous to the safety of life or property as not to permit sufficient time for its issuance and enforcement of an order to the dam owner to address the condition or if passing or imminent floods threaten the safety of a dam or reservoir, and in either case, constitutes emergency-level danger. Consequently, if a dam owner's continued inaction results in the dam posing an emergency-level risk, Water Resources must initiate immediate action to mitigate the threat posed by the condition of the dam. However, because of the complicated nature of that work, Water Resources may not have adequate time to mitigate the threat after it has determined that the dam poses emergency-level danger, and the dam's failure could cost lives and cause expensive damage.
When an owner is noncompliant, Water Resources does not have the authority to take meaningful action to minimize the risk that an extremely high or high hazard dam poses to public safety before the dam poses emergency-level danger. In a situation when a dam owner remains noncompliant even after Water Resources has exercised its existing enforcement options, as we discussed previously, it cannot act before the dam poses emergency-level danger. This leaves a gap in state law that puts public safety at risk. If Water Resources could legally condemn the dam and then complete work to minimize the risk of it reaching emergency-level danger, these actions would help ensure public safety. That effort could include completely removing the dam or altering the condition of the dam or its environment so that the dam poses minimal risk to the public. Although the specific action could vary widely based on the unique design, placement, function, and necessity of each dam, we refer to this action broadly as decommissioning the dam.
According to Water Resources, developing a plan to decommission a dam is a costly and complicated effort. It would likely take a dam owner several years to prepare a decommission plan and obtain the needed approval. Because dams serve important functions, such as providing flood control and retaining reservoirs used for drinking water, decommissioning a dam could have significant implications for the dam's surrounding communities. For example, removing a flood control dam would allow water to flow freely where it had previously been restrained, leading to an inundation of residential or commercial properties that were otherwise merely at risk from the dam's failure. Consequently, dam owners would need to coordinate with the surrounding communities to develop a plan that addresses their needs and concerns. Further, according to Water Resources' management, environmental permitting could be an obstacle when decommissioning a dam.
Dam owners must develop an EAP to minimize loss of life and damage to the local economy stemming from emergency conditions affecting their dams. As we discuss in the Introduction, state law requires that the owner of a dam with a significant or higher hazard classification develop and submit an inundation map for Water Resources to review. Upon Water Resources' approval of the map, state law also requires that the dam owner work with public agencies to develop and submit an EAP for Cal OES to review and approve and to resubmit an EAP if their safety conditions change. State law requires that EAPs describe the response process, as well as the roles and responsibilities of the dam owner in the event of an incident involving the dam. In addition, EAPs must contain notification flowcharts and contact information for public agencies in the dam's flooding inundation zone. The owner must inform federal, state, and local agencies of the impact that a dam failure would have on their jurisdictions and allow the agencies to adequately plan their responses. The text box lists examples of key actions from EAPs that dam owners and local agencies would take in the event of a failure.
Dam owners:
Local agencies:
Source: Federal Emergency Management Agency (FEMA) guidelines.
Although Cal OES has made some progress in approving EAPs, there are many still pending its approval. In December 2025, our state high-risk assessment reported that Cal OES had approved 577 EAPs. During this audit, we identified that as of March 2026, Cal OES had approved 26 additional EAPs, for a total of 603 approved EAPs. Cal OES's recent approvals included 21 for high hazard dams. However, there are still 245 EAPs, or 29 percent, that have not been approved, including EAPs for 141 dams with high hazard classifications and 58 dams with extremely high hazard classifications. The extremely high hazard dams alone threaten to cause from $438,000 to $143 billion in property damage should any of those dams individually fail. On average, an extremely high hazard dam without an approved EAP could endanger nearly 18,000 people. As such, it is critical that Cal OES ensure that dam owners submit or resubmit their EAPs on time for its review and approval, prioritizing the extremely high hazard dams.
Of the 245 unapproved EAPs for dams that must submit EAPs to Cal OES, a quarter have yet to do so. Cal OES staff review the EAPs and either approve them or require that dam owners revise them to address specific areas of the plans. Cal OES may reject an EAP multiple times until the EAP meets all of its requirements. As Figure 11 shows, owners of 62 dams have never submitted their EAPs. Cal OES has reviewed the remaining 165 EAPs that it has received and rejected them because of various deficiencies, such as missing important identifying information or failing to properly identify impacted communities and agencies. Cal OES's application review data as of March 2026 show that Cal OES first rejected these EAPs an average of four years ago. For example, a dam in the Bay Area first submitted its EAP to Cal OES in April 2021, and Cal OES returned it for edits in May 2021. The last time this dam submitted its EAP for review was in June 2022, and it has not resubmitted since its latest rejection in July 2022.
Figure 11 is a bar graph which shows the various states of Cal OES's reviews of EAPs as of March 2025. Dam owners have never submitted 62 EAPs to Cal OES for review. Of these, seven EAPs are for dams with extremely high hazard classifications, 34 are for dams with high hazard classifications, and 21 are for dams with significant hazard classifications. Cal OES has received 18 EAPs but has not yet reviewed them. Of these, three are for dams with extremely high hazard classifications, 12 are for dams with high hazard classifications, and 3 are for dams with significant hazard classifications. The figure highlights that 165 EAPs, the majority of EAPs, have been reviewed by Cal OES at least once, with 80 EAPs returned by Cal OES back to the dam owners for revisions more than once and 85 returned just once. Of those EAPs returned more than once, 22 are for dams with extremely high hazard classifications, 43 are for dams with high hazard classifications, and 15 are for dams with significant hazard classifications. Of those EAPs returned once, 26 are for dams with extremely high hazard classifications, 52 are for dams with high hazard classifications, and seven are for dams with significant hazard classifications.
Source: Cal OES data.
Of the 62 dams that have never submitted an EAP, Water Resources classified 60 as a significant or greater hazard classification in 2017. Further, 14 currently have a less than satisfactory condition assessment, including nine in poor condition. As we discuss in the Introduction, state law established deadlines starting on January 1, 2018, through January 1, 2021, for dam owners to submit their EAPs to Cal OES for review, depending on their hazard classification. Therefore, all 60 dams with a significant or greater hazard classification are delinquent in submitting their EAPs. The other two dams were only more recently assigned a hazard classification by Water Resources in 2023. Because Water Resources assigned these hazard classifications after the state law established the requirements in 2017 and because the state law does not include a deadline for newly classified dams, there is no formal deadline for these two dams to submit their EAPs to Cal OES or to submit their inundation maps to Water Resources for review.
Our review of 10 EAPs submitted to Cal OES that it reviewed but did not approve as of March 2026 found that owners generally struggle to fulfill certain requirements for EAPs. Specifically, we identified that nine of these EAPs were noncompliant in areas involving working with local agencies to develop processes to notify them during emergencies. Cal OES's EAP program manager stated that his team is unable to approve some EAPs because the dam owners did not sufficiently complete portions of their plans pertaining to coordination during emergencies with local agencies that would be affected by the dam's failure. Our review also found that unapproved EAPs were missing critical information, including hazard classifications, emergency notification templates, coordination of actions to reduce water flows, and plans to update and distribute the EAPs as needed. Furthermore, five EAPs did not include their approved inundation map. Coordination with local agencies during an emergency is important because the failure of a dam could affect areas far outside the immediate vicinity of the dam, as Figure 12 shows.8 Local agencies that could be affected by a dam's failure may not be aware of the risks to their communities unless the dam owner informs them. Further, without emergency procedures for risks posed by the dam, those agencies cannot complete emergency simulations to refine their responses.
Figure 12 shows the inundation zone of a particular dam, the location of which is east of Clearlake, west of Yuba City, and North of Santa Rosa, Napa, Lake Berryessa, and Fairfield. The map shows the direction of flood water from the dam flowing south and then turning east towards Woodland, Sacramento, Davis, and Dixon. The water then flows slightly north of Woodland and south of Sacramento, inundating the surrounding areas. The figure provides examples of local agencies that would need to be consulted when developing an EAP: Lake County Sheriff's Office, Yolo Office of Emergency Services, Woodland Police Department, Davis Police Department, and Colusa County Office of Emergency Services. The figure shows four locations of local agencies and three of these are inside the inundation zone.
Source: Dam Breach Inundation Map Web Publisher.
The dam owners we spoke with cited different reasons for not having completed their EAPs, including lack of staffing and not being aware of the requirement. We spoke with representatives of five dam owners with EAPs that Cal OES has not yet approved. Representatives of two dam owners stated that staff turnover presented challenges in responding to requests from Cal OES regarding EAP revisions. Representatives of two other dam owners were unaware of whether they had an EAP for their respective dams, or that they even needed one. Moreover, two dam owners indicated that inconsistencies among different reviewers at Cal OES presented challenges in finalizing their EAPs because subsequent reviewers would find the need for additional revisions that were not identified by the initial reviewers. Cal OES's deputy director stated that such revisions are a result of Cal OES updating its standards and EAP requirements over time.
Despite the lack of response from some dam owners, Cal OES does not coordinate with Water Resources to ensure that delinquent dam owners respond to its requests. State law grants Water Resources the authority to take various enforcement actions against dam owners for violating state law, including for not submitting EAPs. As we discuss in the Introduction, if a dam owner does not prepare an EAP and submit it to Water Resources and Cal OES, Water Resources may issue a Notice of Violation that serves as a letter of reprimand to the dam owner. If the dam owner remains noncompliant, state law grants Water Resources the authority to impose reservoir restrictions or fines and take civil action. However, Water Resources and Cal OES have not worked together to ensure that such enforcement occurs. As a result, Water Resources has sent 16 Notices of Violation to dam owners that have not submitted inundation maps or draft EAPs to it but has not taken enforcement action against the owners of 48 dams with a significant or greater hazard classification that violated state law by not submitting their EAPs to Cal OES for review by the required deadlines.
State law does not specifically require dam owners to be responsive to Cal OES's follow-up requests after it has reviewed and rejected an EAP. State law gives Cal OES full authority to determine whether an EAP meets its requirements, which it bases on FEMA guidelines. State law also requires that if Cal OES determines that a dam owner's EAP does not meet Cal OES's requirements, it shall reject the EAP and require the dam owner to resubmit with revisions. However, state law does not contain deadlines for when dam owners must submit revisions to Cal OES. Cal OES's program manager explained that it does not impose deadlines because there are no applicable state laws that authorize such deadlines. Instead, Cal OES's program manager told us that his team communicates with delinquent dam owners through monthly phone calls and letters that the office sends twice per year. Although Cal OES could establish deadlines through regulations, it has not done so because Cal OES's management believes such regulations would be of questionable use for getting dam owners to respond to its requests. As a result, Cal OES does not have the means to establish that the owners of the 183 dams that are in the process of resubmitting EAPs, as Figure 11 depicts, are delinquent.
Although Water Resources has the authority to take enforcement actions against delinquent dam owners, it stated that it cannot do so against dam owners that have not resubmitted revised EAPs to Cal OES. Without deadlines for resubmission in the state law or regulations, Water Resources' management stated that they cannot take enforcement actions against delinquent dam owners because they are not technically in violation of any requirements, even if they delay resubmitting EAPs for several years. This situation presents a serious problem because when owners operate dams without adequate emergency plans, they risk the safety of local communities during emergencies.
LMAs are required to perform routine maintenance on the levees they manage. As we discuss in the Introduction, the State entered into agreements with LMAs to manage the levees in the State Plan of Flood Control. According to these agreements, LMAs' duties include completing routine maintenance of their levees. For example, LMAs must selectively control vegetation on their levee slopes, control rodents, and repair erosion, caving, and other structural problems. Water Resources annually performs LMA maintenance inspections, as state law requires. We reviewed Water Resources' LMA maintenance inspection policy and other records, such as completed inspection reports, and found that Water Resources met the Army Corps' requirements for the content and frequency of its LMA maintenance inspections. We also reviewed inspection reports completed in 2025 for 20 LMAs with different maintenance ratings and found that Water Resources' engineers followed the department's policy in completing the inspections. To evaluate inspections of levees, we selected the 20 LMAs based on their historical maintenance ratings, as Table 2 describes, and confirmed that Water Resources adhered to its policies and procedures for the inspections. Therefore, we determined that Water Resources satisfactorily completed its inspections according to requirements.
According to Water Resources' inspection data, it gave nearly one-third of LMAs unacceptable maintenance ratings in 2025 for failing to perform their required routine maintenance on the levees they manage. After its staff complete inspections, Water Resources calculates the percent of miles of levees under an LMA's management that its engineers rated as unacceptable or minimally acceptable to determine the overall maintenance rating. The text box shows examples of how Water Resources determines its overall maintenance ratings. As Table 3 shows, Water Resources rated 32 of the 102 LMAs as unacceptable during its fall 2025 inspections. In fact, Water Resources has rated 23 of these 32 LMAs as unacceptable for at least the last five years. Table C in Appendix C shows the specific hazard that each LMA with an unacceptable rating from 2025 poses to its surrounding area.
Source: Water Resources.
We found that the LMAs received unacceptable ratings largely because of vegetation management and animal control deficiencies. These deficiencies may either cause structure problems in levees or prevent engineers from identifying those problems. To understand the reasons for the unacceptable ratings that LMAs received, we reviewed the inspection reports for five LMAs from our previous selection of LMAs that Water Resources rated as unacceptable for at least the last five years. For the selected LMAs, we reviewed inspection reports for all of the levees they managed going back to 2021 to understand what deficiencies led Water Resources to give the LMAs their ratings and to evaluate whether the LMAs had the same deficiencies year to year or deficiencies that worsened over time. As the text box shows, vegetation management and animal control were among the most common reasons cited by Water Resources for its ratings of the five LMAs we reviewed. Table D in Appendix D provides key information about these LMAs and a summary of their deficiencies as of fall 2025.
Source: Water Resources.
One of the LMAs that we reviewed-Madera County Flood Control and Water Conservation Agency-received a rating of unacceptable in 2025. According to Water Resources' inspection report, of the more than 26 miles of levees that the LMA manages, approximately 17 miles were in unacceptable or minimally acceptable condition. Water Resources' inspection reports noted erosion at one of the levees, a condition that it had first identified in 2007 and that the LMA still had not resolved. In their reports, Water Resources' engineers also noted that dense vegetation, which had been present since 2012, was obscuring their view of the erosion.
Some of the deficiencies, like animal burrows and erosion sites, can have a direct impact on the structural integrity of levees. When LMAs do not backfill animal burrows, such as those that Figure 13 shows, the holes can create a seepage path through the levee, weakening its structural integrity. Erosion sites are areas where erosion-the displacement of solid particles originating from soil, rock, and other sediments-is occurring near or on a levee. If erosion encroaches into a levee or its foundation, it can threaten the integrity and stability of a levee and is a sign that the levee is near failure and would reasonably be expected to fail during a single flood season or high-water event.
Figure 13 is a photograph taken by the auditors on a site visit in March 2026 of a series of animal holes in a levee. The figure indicates that the largest hole is greater than one foot in diameter and states that animal burrow holes disrupt the structural integrity of levees and create spaces where water can seep through and further erode the levees.
Source: Auditor photograph taken during on-site visit in March 2026.
Other common levee maintenance deficiencies do not directly affect the structural integrity of levees but can still pose significant problems. Because Water Resources engineers mainly perform their inspections of hundreds of miles of levees visually from vehicles while driving on top of the levees, large amounts of overgrown vegetation, as Figure 14 shows, make it difficult for the engineers to identify deficiencies like animal burrows and erosion sites that do affect levees' structural integrity. Large woody vegetation and large encroachments, such as abandoned vehicles and debris, can also affect engineers' ability to properly inspect levees. If significant deficiencies are hidden from engineers' view, the engineers cannot identify them, and the LMA cannot address them. Moreover, encroachments and woody vegetation can impede Water Resources' and other agencies' efforts to service levees during emergencies. For example, a fallen tree trunk, thick shrubs, or an unpermitted encroachment, such as a chain-link fence, could prevent a truck from reaching the point at which a levee needs repair. Such delays could lead to more damage and potential levee failure.
Figure 14 is a photograph taken by the auditors on a site visit in March 2026 of vegetation such as bushes along a riverbank. The graphic notes that this vegetation obscures the levee, which limits the ability of engineers to see problems like animal holes.
Source: Auditor photograph taken during on-site visit in March 2026.
Routine maintenance of levees is important because it reduces the likelihood that levees will fail and cause flooding that would damage property and endanger lives. Small levee deficiencies can progress to more critical deficiencies that can lead to a levee failing during a high-water event. For example, dry-weather failures occur occasionally in the Delta Region and can be attributed to factors such as burrowing animals, pre-existing weaknesses in levees and their foundations, slow deterioration of levees over time, and other circumstances like high astronomical tides. Specifically, levees in the Delta Region can experience high-water events that are caused by high tides bringing increased water from the ocean into the levee systems. The most recent example of a dry-weather failure is the June 2004 Upper Jones Tract levee breach, which caused $50 million in damage. Although the Upper Jones Tract levee is not within the State Plan of Flood Control, it serves as an example of how LMAs' lack of maintenance increases the risk that their levees could fail and flood the surrounding area. Fifteen of the 32 LMAs that Water Resources rated as unacceptable in 2025 manage levees located in the Delta Region.
Water Resources stated that LMAs do not maintain their levees at acceptable levels because they cannot afford the cost of the maintenance work, among other reasons. According to Water Resources' management, Water Resources does not have policies or a process that require an LMA to improve its levee maintenance to address identified deficiencies. However, according to the managers, Water Resources' staff have learned through informal conversations with LMAs that they do not maintain their levees because they cannot afford to complete repair work and they cannot force landowners to remove encroachments. Further, according to the managers, some LMAs have stated that they face environmental permitting restrictions that delay or prevent them from completing necessary repairs. According to its May 2023 Operation, Maintenance, Repair, Rehabilitation, and Replacement Cost Evaluation and Historical Expenditure Memorandum, Water Resources estimates that it and LMAs combined require at least $165 million more annually to fully address levee maintenance in the State Plan of Flood Control over the next 30 years.
In our interviews with some LMAs, they confirmed that the cost of work is the reason they do not maintain their levees. We spoke with representatives from two LMAs to seek their perspectives. These LMAs confirmed that they could not afford the cost of their maintenance solely from the revenue that they generated from their assessments on landowners. In one case, the levees that an LMA managed were located on land owned by only two landowners. A representative of that LMA with whom we spoke, who was also a landowner, claimed that the landowners could not afford the cost of a contract to have the levee maintained and did not have the time to complete the work themselves. The representative stated that he did not have sufficient information about state or federal grant programs to actively seek funding to help pay for the work. In another case, a representative of a county that manages the LMA explained that the LMA's inability to afford maintenance was largely due to the county applying the LMA assessment revenue to its Educational Revenue Augmentation Fund, as state law requires.9 The representative explained further that the county tried to raise its assessment amount, but it had to get voter approval to do so, and the action failed. The representative also noted that the county relied heavily on Water Resources' Flood Maintenance Assistance Program (FMAP) funding to support the LMA's maintenance costs. The county was awarded $202,600 through the program in calendar year 2024. However, Water Resources eliminated the program in fiscal year 2024-25 after the Legislature cut the allocation for operations, maintenance, repair, rehabilitation, and replacement that it used for that purpose. The LMA representatives stated that losing FMAP funding put a strain on the county's financial resources.
Moreover, the cost of acquiring environmental permits may be preventing some LMAs from maintaining their levees in a better condition. Water Resources' management and the Board's chief engineer noted that permitting and environmental restrictions prevent and delay LMAs from addressing their maintenance deficiencies. The representative from the county LMA also noted that the cost of complying with the California Environmental Quality Act was a barrier to resolving its levee deficiencies. The cost for it to acquire the required environmental permits is more than $1.4 million, which is more than half of the total cost of the work that would bring its levees back to acceptable ratings.
The State has the responsibility to repair levees when LMAs cannot maintain them at required conditions. The State assured the federal government that it would maintain project levees in accordance with federal standards. Consequently, even though the State established agreements with LMAs to perform the routine maintenance of project levees, the State is ultimately responsible for ensuring that the levees are maintained. However, the State has not used the full extent of its authority to ensure that project levees are maintained acceptably.
When Water Resources determines that an LMA is not maintaining its project levees according to federal regulations, it must start the process in which the State takes over maintenance of those levees. Because Water Resources bases its maintenance inspection criteria on federal standards, assigning an LMA an unacceptable maintenance rating indicates that the LMA has not maintained its levees in accordance with federal standards. State law establishes that in these situations, Water Resources must initiate proceedings to convert the LMA's levees into a state-managed maintenance area. By doing so, Water Resources takes over the maintenance responsibility, while the landowners who benefit from the levee continue to hold financial responsibility for the maintenance. Water Resources must provide the LMA an opportunity to protest the determination. If the LMA's protest is unsuccessful, Water Resources then proceeds to form the maintenance area, for which counties continue to charge landowners the costs of maintenance.
Water Resources has not formed a maintenance area to ensure that project levees are maintained in acceptable condition. According to Water Resources' management, because LMAs have provided assurances to the State and the federal government that they will maintain their levees to the required standard, it is the responsibility of the LMA to correct maintenance deficiencies. Water Resources would exercise its authority to intercede and form a maintenance area only after careful consideration of how its resources can be prioritized to provide the greatest flood-risk reductions possible. According to the managers, Water Resources does not believe that forming maintenance areas is an effective long-term strategy to reduce the risk attributable to LMAs' lack of maintenance because the department does not consider unacceptable maintenance ratings to be the only sign of increased risk. The managers explained that the purpose of the maintenance ratings is to evaluate whether Army Corps standards are being met. They further stated that determining the risk a levee poses requires considering its design, an LMA's emergency response, how land around the levee is used, and how water interacts with the levee. The Army Corps requires that the levees be maintained in such a manner as may be necessary to obtain the maximum benefits of the levee, including repairing damage caused by erosion or other forces and ensuring that no caving has occurred that might affect the stability of the levee. The managers acknowledged that LMAs' unacceptable levee maintenance increases the chance that a levee may fail but cautioned that the scale of increased risk is unknown. They said that the real benefit of LMAs performing acceptable maintenance is that their levees would then qualify for federal funding to repair problem sites after emergencies. However, they stated that maintaining the acceptable rating is not good value for LMAs that manage levees that protect smaller populations, because they are less likely to qualify for the federal funding, which is allocated partly based on the number of people the levee repair will help to protect.
Water Resources' explanation for not forming maintenance areas does not take into consideration long-term implications, and it neglects to consider that landowners benefiting from levees would be responsible for the costs of the maintenance area. Even though LMA maintenance ratings do not serve as a comprehensive evaluation of risk that a levee poses, the managers acknowledged that unacceptably maintained levees have a greater chance of failing. Consequently, although maintaining levees in acceptable condition may not guarantee that a levee does not fail, particularly in extremely adverse situations, that condition should nonetheless decrease the likelihood that levees would fail under normal circumstances. Further, Water Resources' concern that forming a maintenance area is not a good prioritization of its resources overlooks the benefit that it can receive by recouping the cost of forming the maintenance area. According to state law, when Water Resources acts to form a maintenance area in response to an LMA's inadequate maintenance, the cost of forming a maintenance area and the ongoing work performed by maintenance areas is assessed to the landowners that benefit directly from the levees.
Although Water Resources does not believe that LMAs' unacceptable maintenance ratings signify a risk that must be systematically addressed, it has nonetheless provided funding to LMAs to support their maintenance efforts. Starting with the Budget Act of 2018, Water Resources used a portion of its operations, maintenance, repair, rehabilitation, and replacement allocation for several years to supplement LMA maintenance costs through its FMAP program. The FMAP program helped LMAs obtain acceptable maintenance ratings until 2024, when Water Resources no longer had funds to support the program.
Despite Water Resources' management agreeing that LMAs' lack of maintenance increases the chance that a levee may fail, they reiterated that the purpose of the maintenance inspections is to evaluate whether LMAs are performing the maintenance required according to their agreements, but they do not by themselves signify risk of failure. This perspective aligns with Water Resources' description of the inspection program's purpose: to verify that local agencies are performing their legal and statutory responsibilities according to state law and their legal obligations with the State. However, Water Resources' annual inspection report, which combines the results of all of Water Resources' individual LMA inspection reports for the year and provides background regarding its programs, demonstrates the importance of the inspection results beyond compliance with federal regulations. The report explains that the criteria Water Resources uses for the inspections provide realistic views of the severity of deficiencies and of the significant differences among LMA maintenance performances. Further, the annual report says that using these criteria for inspections protects levee operability and integrity by requiring open visibility and access to those portions of the levee most susceptible to high-water damage while retaining vegetation that possesses both habitat and environmental value. Therefore, we disagree with Water Resources' position that the ratings themselves do not signify increased risk of failure.
Water Resources uses state-funded programs to reduce the risk that levees pose, including those that LMAs with unacceptable maintenance ratings manage. According to Water Resources management, instead of focusing on overall LMA maintenance ratings as a sign of risk, Water Resources focuses on the details of its inspection results, through which it identifies sites on levees that may not maintain integrity during high-water events. For example, Water Resources uses its Flood System Repair Program to work with LMAs to repair deficient sites that it identifies through its maintenance inspections and through LMA reporting. The Flood System Repair Program addresses levee deficiencies that Water Resources identifies as critical, meaning they could reasonably result in the levee's failure during a single flood season or high-water event. The Flood System Repair Program has also provided funding to repair some sites it identified as serious that were in danger of reaching critical status. The program uses a risk-based analysis to target sites that are likely to cause the most harm. Water Resources initiates repairs on those sites, including within poorly maintained levees, regardless of the maintenance performance of the LMA, thereby reducing the risk that the levees will fail. According to its 2022 Central Valley Flood Protection Plan update, Water Resources implemented the Flood System Repair Program in 2017 and has since spent $18.6 million working with 10 LMAs with unacceptable maintenance ratings to repair 16 sites on their levees. Water Resources also uses its Storm Damage Emergency Repair Program and Pipe Repair Program for similar purposes.
Nevertheless, these programs do not address all critical sites, and Water Resources may not be able to fund the programs at effective levels. Since 2012, when Water Resources began to catalog levee sites that it identified as needing repair, it has been unable to complete repair projects as of August 2026 for 14 of the 48 critical sites that it had identified. Thirteen of these 14 sites have been critical sites in the Flood System Repair Program site catalog since at least 2023, and the other site was upgraded from serious to critical in 2025. According to a Water Resources manager, Water Resources has not completed all of the repairs of critical sites because it has not had enough funding to support those projects. Further, he stated that a few LMAs have declined to participate in the program because they determined that they could not afford their share of expenses. For the same reasons, Water Resources has also not been able to complete repairs at all the sites it has identified as serious in terms of risk of failure. This is problematic because Water Resources has relied heavily on funding it received from Proposition 1E, passed in 2006, to support nearly half of its Flood System Repair Program project costs. Water Resources has since exhausted that funding source and does not have additional funding available to repair projects for new critical sites that it will inevitably identify. Absent additional funding, it will only have its general fund allocation to support the Flood System Repair Program, meaning that it will likely complete fewer projects in the future than it has completed thus far.
Water Resources also completes various systemwide improvement projects that reduce the water load levees face, and in doing so it indirectly reduces the risk posed by levees with unacceptable maintenance ratings. According to Water Resources management, as part of the Central Valley Flood Protection Plan, Water Resources plans to complete projects that would ease the impact of high-water events on problematic levees. For example, Water Resources worked with the Army Corps and local agencies to develop a forecast-informed approach to operating the Lake Oroville Reservoir and the New Bullards Bar Reservoir. This new operations approach uses improved monitoring, weather forecasts, and runoff projections to build more flexibility and efficiency into reservoir operations and is meant to reduce flood risk for communities along the Yuba River and Feather River during extreme atmospheric-river storm events. Nonetheless, according to Water Resources management, these approaches provide cross-regional benefits but are expensive, lengthy, and do not directly mitigate risks in other parts of the system that are not part of the project benefit area.
Additionally, Water Resources and the Board have worked with LMAs to help them obtain federal funding to repair levee sites. Specifically, according to the Board's chief engineer, the Board encourages LMAs that are deemed ineligible to participate in the Army Corps' Public Law 84-99 funding program-which provides funding to repair levee sites after emergencies-to gain or regain eligibility in the program by developing a Systemwide Improvement Framework (SWIF) plan. Water Resources provided funding through its FMAP program that LMAs used to sustain and improve their eligibility for the program. The Board's chief engineer explained that through a SWIF plan, the LMA implements a long-term plan to bring its system into compliance with federal requirements, which could allow the LMA to make progress toward addressing its deficiencies. According to the Board's chief engineer, having a SWIF plan in place indicates to the Board that the LMA is taking action to improve the maintenance of its levee. The Board reported that the percent of project levee miles managed by LMAs, regardless of maintenance rating, that participated in the program has increased from 36 percent in 2016 to 86 percent in 2025. However, 15 of the 32 LMAs with unacceptable ratings are not active in the program.
The Board is responsible for taking enforcement actions against unpermitted encroachments, but it is unable to address its workload. The Board takes enforcement actions against landowners' unpermitted encroachments on levees, which the Board's chief engineer described as a statutory requirement for the Board. As we discuss earlier, unpermitted encroachments can prevent engineers from observing deficiencies and can impede agencies from responding to emergencies on levees. Because the Board is unable to immediately address all encroachments, it focuses its efforts on the most egregious encroachments that cause damage to the State Plan of Flood Control or that have the potential to cause damage. Water Resources' annual inspection reports identified approximately 3,000 encroachments each year in 2024 and 2025 for the Board to address. However, the Board addressed only a total of 61 encroachments during those years, according to its chief engineer. The chief engineer also indicated that the Board's enforcement process is administratively burdensome and that it has sought statutory changes to make the process more efficient.
To ensure that dam owners are prepared to address needed repairs for their dams, the Legislature should amend state law to require that dam owners with high and extremely high hazard classifications create ongoing maintenance and repair plans for their dams and submit them to Water Resources for review and approval as part of their annual inspections. The Legislature should require that dam owners update these plans every five years and include the following details:
To ensure that dam owners develop or make necessary revisions to their EAPs promptly for Cal OES's review and approval, the Legislature should do the following:
To ensure that all owners of high and extremely high hazard dams develop sufficient ongoing maintenance and repair plans, the Legislature should do the following:
To ensure that the safety of the public is addressed before a dam's condition results in an emergency, the Legislature should amend state law to allow Water Resources to order the condemnation and decommissioning of a dam when Water Resources' other means of enforcement are unsuccessful.
To improve its ability to address unpermitted encroachments on levees, by January 2027 the Board should seek the statutory changes that are required to streamline its encroachment enforcement process and should annually request the amount of funding necessary to complete its work.
To ensure that all owners of dams submit and resubmit required EAPs, Cal OES should immediately report to Water Resources those dam owners who are delinquent in submitting or resubmitting their EAPs so that Water Resources can take the appropriate enforcement action against those owners. Further, it should establish a process to report such information to Water Resources on a quarterly basis, including reporting dam owners that do not meet new deadlines that the Legislature establishes.
To ensure that it exercises its full enforcement authority over the safety of dams, Water Resources should develop processes by January 2027 to do the following:
To ensure that it has sufficient financial resources to support its enforcement of dam safety, Water Resources should immediately seek approval from the Department of Finance to charge dam owners fees sufficient to support that work.
To ensure that all owners of dams submit required EAPs, when Cal OES notifies Water Resources of delinquent owners-including those dam owners that do not meet new deadlines that the Legislature establishes-Water Resources should immediately take appropriate enforcement action against those owners for failing to submit or resubmit required EAPs in a timely manner.
To alleviate delays and increased project costs related to both dams and levees, by March 2027, Water Resources should identify all impediments, including environmental permitting, that could cause delays or excessive costs in completing dam and levee repair work or in decommissioning a dam and develop a plan by August 2027 to work with appropriate parties, including the Legislature, to minimize those impacts.
To ensure that levees are maintained properly and to comply with state law, Water Resources should immediately initiate the process to form a maintenance area when it determines an LMA does not meet its federal requirements.
To improve its ability to address high-risk sites on levees, by January 2027 Water Resources should annually identify the sites that require repair in the next year and seek the funding needed to allow it to address all the critical and serious sites that it identifies on project levees.
We conducted this performance audit in accordance with generally accepted government auditing standards and under the authority vested in the California State Auditor by Government Code section 8543 et seq. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on the audit objectives. We believe that the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objectives.
Respectfully submitted,
GRANT PARKS
California State Auditor
October 13, 2026
Staff:
Kris Patel, Audit Principal
Sean McCobb, Senior Auditor
Tanner Burke
Delise Coleman
William Goltra
Arseniy Sotnikov
Legal Counsel:
Ethan Turner
Water Resources is responsible for inspecting and assigning a condition assessment to each jurisdictional dam in the State. During its annual inspections, Water Resources must evaluate whether the dam owners have adequately maintained their dams and whether the dams have any signs of deficiencies that the owners need to remediate. In addition, state law requires that Water Resources assign each dam a hazard classification based on the number of people who would be in danger if the dam failed and the dollar value of damage the dam's failure could cause. As of May 2026, Water Resources assessed 57 dams as either poor or unsatisfactory. Table A lists 40 dams that Water Resources assessed as of May 2026 as in poor or unsatisfactory condition and that had a hazard classification of high or extremely high.
As part of our audit, we selected one dam that was in fair condition, four dams that were in poor condition, and one dam that was in unsatisfactory condition to review in detail. Table B presents key information about these six dams and a summary of their deficiencies as of April 2026.
In 2025, Water Resources determined that 32 LMAs were in unacceptable condition. As a result, nearly 270,000 people and approximately $39 billion in property may be at risk, including critical infrastructure. For our evaluation, we analyzed hazard risk data from the Army Corps that the Board relies on for its planning considerations. The Army Corps maintains hazard risk data using a comprehensive system approach to determine levee-related flood risks, rather than evaluating risks related to each LMA. In a 2024 report on flood protection services, the Yolo County Local Agency Formation Commission-a county agency that, in part, conducts studies of existing government agencies and encourages the efficient provision of government services-noted an inherent interdependency among the different LMAs within each levee system. As a result, even if an LMA manages only a small portion of a levee system, the failure of its portion could cause harm to the entire basin that the system protects. Table C presents the hazards posed by the levees that each of the 32 LMAs manage.
As part of our audit, we selected five LMAs with unacceptable ratings to review in detail. Table D presents key information about these LMAs and a summary of their deficiencies as of fall 2025.
State law authorizes the State Auditor to establish a program to audit and issue reports with recommendations to improve any state agency or statewide issue that we identify as being at high risk for the potential of waste, fraud, abuse, and mismanagement or as having major challenges associated with its economy, efficiency, or effectiveness. In December 2025, we issued our latest assessment of high-risk issues that the State and selected agencies face. Because we continue to identify water infrastructure as a high-risk issue for the State, we performed this audit to evaluate Water Resources' and the Board's efforts to reduce the risk of failure of dams and levees. We also evaluated what actions Cal OES has taken to ensure that dam owners complete EAPs that meet its requirements. Table E lists the objectives we developed and the methods we used to address them. Unless otherwise stated in the table or elsewhere in the report, statements and conclusions about items selected for review should not be projected to the population.
The U.S. Government Accountability Office, whose standards we are statutorily obligated to follow, requires us to assess the sufficiency and appropriateness of the computer-processed information we use to support our findings, conclusions, or recommendations. In performing this audit, we relied on electronic data files that we obtained from Water Resources, Cal OES, the Board, and the Army Corps. Specifically, we used the data from these sources to create a map depicting where dams are located throughout the State and the inundation area of a dam in the Bay Area. We also used these data to select the dams and levees that we reviewed, to determine the numbers of dams and levees not adequately maintained, to approximate the hazard posed by dams and levees, to determine the number of owners of dams that do not have approved EAPs and whether Cal OES had reviewed submitted EAPs, and to determine the number of LMAs participating in the Public Law 84-99 program. Based on our review of the data and discussions with Water Resources and Cal OES, we determined that their data sets were sufficiently reliable. However, we did not review the accuracy of the Army Corps or the Board's data sets, or specifically Water Resources' hazard data. Although we recognize that there may be limitations that affect the precision of the data we present, our findings and conclusions are not dependent on those data, there is sufficient evidence in total to support our audit findings, conclusions, and recommendations.
September 22, 2026
Grant Parks
California State Auditor
621 Capitol Mall, Suite 1200
Sacramento, CA 95814
Dear Auditor Grant Parks,
The Central Valley Flood Protection Board (Board) acknowledges receipt of the California State Auditor's redacted draft State High-Risk Program Report 2025-603 (redacted draft report) and agrees with the Auditor's recommendations.
The Board appreciates the report's acknowledgment of the Board's efforts to work with the local maintaining agencies within the Central Valley that operate and maintain State Plan of Flood Control facilities, to gain or regain eligibility in the U.S. Army Corps of Engineers Public Law 84-99 Rehabilitation Program. Through this program, maintaining agencies are required to develop a plan to reduce deficiencies over time within their respective boundaries. The program also provides federally funded rehabilitation for damages that occur from a federally declared flood emergency, if the local maintaining agency is eligible in the program.
The Board agrees with the report's recommendations that to improve the Board's capability to address unpermitted encroachments on levees, the Board should seek statutory changes and additional resources to address unpermitted encroachments that require the Board's enforcement actions. The findings in the report provide further support that additional State resources are necessary to reduce high risk, unpermitted encroachments and unauthorized work that affect State Plan of Flood Control facilities. Unauthorized activities pose a significant flood threat to lives and property within the Central Valley due to the possibility of damage or ultimate failure of flood risk reduction infrastructure. Although PL 84-99 eligible districts account for 93% of the population protected by federal levees, many smaller rural districts remain ineligible.
The Central Valley Flood Protection Plan has noted a need for increased resources in this area from both state and local sources. These additional resources are needed to keep the existing system operating as intended, even as system improvements are pursued to further reduce the risk of catastrophic flooding. Further, the Board has developed multiple tools that streamline application and enforcement processing, including an online permit application portal available to the public, and an internal viewer that displays all permit applications and issued permits as well as active enforcement cases. These tools were developed within the Board's limited budget and reflect its continued efforts to develop and implement efficiencies that support the Board's permitting and enforcement programs and overall mission.
Thank you again for the opportunity to comment on the redacted draft report.
Sincerely,
Brian Johnson, Board Secretary
On behalf of the Central Valley Flood Protection Board
September 18, 2026
Mr. Grant Parks
California State Auditor
621 Capitol Mall, Suite 1200
Sacramento, California 95814
Subject: Response to 2025-603-State High-Risk Audit regarding the State's Water Infrastructure
Dear Mr. Parks:
The California Department of Water Resources (DWR) appreciates the opportunity to respond to the draft audit report (Report 2025-603) for the State High Risk Program dated October 13, 2026. ① While we appreciate the hard work of California State Auditor staff, overall, the draft audit report portrays a fundamental lack of understanding of the complexities of flood management in California's Central Valley and dam safety statewide, leading to recommendations that will not effectively advance statewide public safety. Our response below seeks to clarify inaccurate or incomplete findings and correct misstatements in the draft audit report.
SPFC Levees and Flood Risk Management
The audit acknowledges that the Central Valley Flood Protection Plan (CVFPP) provides a systemwide approach for reducing flood risk associated with State Plan of Flood Control (SPFC) facilities. ② However, the draft report does not fully consider the breadth of risk management strategies articulated in the CVFPP or the way DWR, the Central Valley Flood Protection Board (CVFPB), and local maintaining agencies (LMAs) implement those strategies. As a result, the audit's characterization of levee risk in the Central Valley is incomplete and inconsistent with the CVFPP's risk-based framework. The CVFPP uses a risk-based framework to prioritize actions to the areas of highest risk to provide as much safety benefit as possible for the public. ② The audit inappropriately focuses on levee maintenance which is only a component of overall risk reduction actions.
DWR and the CVFPB share responsibility for approximately 1,600 miles of SPFC levees, weirs, bypasses, and related flood management infrastructure. Under the Central Valley Flood Protection Act of 2008, the CVFPP-updated every five years-serves as the State's strategic blueprint for reducing flood risk in both the Sacramento and San Joaquin Valleys. The CVFPP relies on a diversified portfolio of structural and nonstructural actions, including improvements to levees, flood control reservoir operations, operations and maintenance (O&M), emergency response, and floodplain management. State law also requires the CVFPP to prioritize recommended actions based on their contribution to overall flood risk reduction. ② Conversely, the draft audit narrowly focuses on maintenance as the overall determinate of flood risk. While adequate maintenance is important as discussed in the CVFPP, it is not the ultimate determinate of risk to lives and property.
Narrow Focus on Levee Maintenance
② Although the audit references the CVFPP, it does not meaningfully incorporate the plan's risk-based approach when evaluating levee conditions. Instead, the report relies almost exclusively on maintenance inspection results and assumes a direct, uniform correlation between maintenance deficiencies and flood risk. This approach overlooks several critical factors:
The audit also mischaracterizes the importance DWR places on maintenance. The CVFPP makes it clear that improved operations and maintenance of levees throughout the SPFC system is a high priority for DWR. The CVFPP's investment portfolio has resulted in the development and implementation of several new programs to improve O&M by addressing the highest-risk deficiencies in partnership with the responsible maintaining agencies. The audit acknowledges these programs but claims DWR does not think improved maintenance is important enough.
Ultimately, the audit's narrow focus on maintenance and MA formation simply does not reflect how risk is managed across the SPFC system to most effectively protect life and property.
Inaccurate Findings on Levee Risk
② ③ The narrative presented in the draft report does not acknowledge DWR's commitment to improved operations and maintenance and states that DWR is reluctant to use its authority to form maintenance areas (MAs). This portrayal is inaccurate.
④ ⑤ The report makes several unsubstantiated assertions including that DWR does not consider unacceptable maintenance a significant risk, DWR does not have policies or processes that require LMAs to improve levee maintenance, and that DWR reluctance to form MAs increases flood risk.
④ DWR's commitment to maintenance is well documented. The CVFPP is DWR's comprehensive plan for addressing flood risk in the Central Valley, and it explicitly incorporates maintenance as a key element. Our process to ensure LMAs perform required maintenance in accordance with assurance agreements has multiple components. We conduct maintenance inspections of all SPFC levees twice a year and report maintenance deficiencies to the CVFPB and the LMAs. Additionally, we have provided over $400 million to support local maintenance activities through multiple funding programs. In our inspections, we highlight priority items that will improve LMA levee maintenance ratings and encourage LMAs to address the higher-risk factors first in our threat assessment and recommendation section of the annual report. We also provide technical support to any levee system operator on request.
⑥ DWR is not opposed to forming MAs when doing so is in the public interest; DWR currently operates ten MAs in the Central Valley. However, MA formation carries substantial upfront costs-often tens of millions of dollars-that must be weighed against other investments that may yield greater risk-reduction benefits. DWR must prioritize limited resources to maximize overall flood risk reduction, which does not always result in MA formation. The assertion that DWR's reluctance to form MAs increases flood risk is wrong. ⑤ The CVFPP clearly articulates DWR's risk-based approach to prioritize investments to reduce flood risk. ⑥ MA formation is a tool DWR uses, when and where appropriate, but it is not a focus of the risk prioritization approach DWR developed.
Dam Safety
DWR's dam safety program regulates a wide range of non-federal dams and over 600 dam owners in a geographically complex and seismically active state. The draft audit report inadequately represents California's dam safety program in numerous aspects. Dam safety is a highly complex technical field that requires specialized expertise in engineering and science. This is why DWR has availed itself of the Association of Dam Safety Officials' (ASDSO) Peer Review Program. At DWR's request, ASDSO assessed California's dam safety program and found it to be the leading state dam safety program in the nation.
⑦ While the draft report expresses concerns regarding risk and public safety, it does not fully appreciate the reevaluation program DWR established in 2018 following the Oroville spillways incident. This reevaluation program is critical to ensuring dam safety. The objective of the reevaluation program is to periodically review all dams that pose a hazard to life (high and extremely-high hazard) against current dam safety standards. For each dam, the process starts with a risk assessment in line with federal guidelines that consider the following: (1) identification of multiple scenarios of how a dam could fail, (2) the likelihood of each scenario occurring, and (3) the consequence (probable life loss) associated with each scenario. The results are measured against industry standards for acceptable risk. If the risk is higher than this standard, DWR conducts a focused reevaluation consisting of technical engineering analyses to determine if the dam is deficient. If deficiencies are identified, DWR changes the condition assessment to a rating less than satisfactory (Unsatisfactory, Poor, or Fair) in accordance with federal guidelines. It should be noted that the condition assessment rating does not consider potential life loss (consequence) and minimally reflects the likelihood of failure. Thus, DSOD uses its risk assessments and engineering analyses to refine the likelihood and consequence of failure and assess the need for risk-reduction measures, such as reservoir restrictions. DWR may adjust these risk-reduction measures (further restrictions, additional monitoring, emergency planning) if warranted.
⑧ A dam identified as deficient through the reevaluation program does not indicate the dam is degraded or poorly maintained; rather, it indicates that dam safety standards and external hazards such as earthquakes and floods have changed since the dam was built. Dam owners are not in violation of the California Water Code in such circumstances.
Narrow focus on Inspections and Enforcement
⑦ A major simplification contained in the draft audit report is the heavy focus on field inspections and enforcement with limited to no acknowledgment of the breadth of the dam safety program. DWR's reevaluation program is responsible for identifying over two-thirds of dam deficiencies, which the report notes. ⑦ Without adequate appreciation of DWR's reevaluation program (risk assessments and technical analyses described above), the draft report limits itself to condition assessments (Unsatisfactory to Satisfactory) as the only indicator of the chance of failure. ⑨ Additionally, while the report acknowledges that restrictions are taken, it fails to appreciate how much a restriction can reduce risk, often significantly reducing or eliminating the potential loss of life.
The draft audit report acknowledges the significant hazards dams can pose to Californians, which is why DWR's dam safety program takes a multipronged approach to minimize risks to people and property. The dam safety program uses geological evaluations, engineering analyses, and complex design reviews to guide its actions. Condition assessments, which again indicate deficiencies, are a simple and limited tool used by State and federal agencies to screen dams for their financial assistance programs, and it is recognized that further information is needed to properly prioritize assistance.
A. Inspections
⑦ The audit's focus on inspections leads to the potential misinterpretation that poor maintenance and a lack of action are the only reasons dams may be in less-than-satisfactory condition. For instance, the draft report provides examples and photos of visible issues with dams, such as concrete cracking, that exacerbate this skewed focus. This further demonstrates the lack of technical understanding that the most critical deficiencies are found through DWR's reevaluation program; these are not visible in an inspection and most often occur because design loads (earthquakes and floods) are larger than original expected. Design standards, engineering methods, and science have changed over time. These dams were not necessarily built poorly.
The draft audit report draws attention to the increasing number of dams in less-than-satisfactory condition and the length of time to address deficiencies. DWR's inspections and its reevaluation program can identify dams that have deficiencies (and associated downgrade in condition assessment) relatively quickly. As the draft report notes, it can take decades to repair these deficiencies, which results in a net increase in the number of dams with a less-than-satisfactory condition assessment. This does not mean dam safety is not being addressed. Approximately 5 to 10 dams each year are being repaired and returned to satisfactory condition, and a vast majority of all deficient dams are at some stage of addressing their deficiencies. ⑩ Because the auditors focused on a small subset of dams over a short period of time, the draft report did not recognize all components contributing to the increase in the number of deficient dams.
⑪ The draft report implies that if an owner lacks funds, they are not taking action. Numerous recent projects have not had funding barriers, yet they still took decades to construct. Most owners advance plans and designs despite funding and permitting issues because it can help achieve some of the limited financial assistance that exists for dam safety. Dam projects are complex and design development, ensuring constructability, and project quality cannot be rushed. It is also critical that projects do not add risk when dams and dam reservoirs need to remain in service during construction to provide water supply or flood control.
Funding, however, is the biggest issue owners face both in California and across the country. The draft report correctly notes that DWR has estimated that over $28 billion is needed to fix California's dams over the next five years. When projects cost more than $100 million, these repairs can exceed the annual budget of all but a few dam owners. These constraints are not a result of poor prioritization or negligence. Laws, statutes, and revenue sources often limit the ability of owners to raise funds, and doing so can have unreasonable impacts on local communities.
B. Enforcement
⑫ Lacking funds and less-than-satisfactory condition assessments are not a violation of the California Water Code (Water Code), and broad enforcement based on limited funding will not be successful unless owners are in violation of the Water Code. Based on the number of dams in less-than-satisfactory condition, the audit should consider whether the number truly shows noncompliance and whether enforcement is really a solution to a much bigger problem for which the auditors pose no solution. ⑬ Dam owners want funding for their projects, but funding of the scale necessary is difficult to obtain, and enforcement will not change that.
Ninety-five percent of dam owners are taking action to address their deficiencies by restricting reservoirs, initiating planning for fixes, and filing permits for long-term projects. ⑭ The remaining 5% may warrant enforcement as violations are identified, and DWR does take action.
FEMA's model state dam safety program notes that enforcement should be a last resort for compliance because it can lead to excessive costs and delays in addressing dam safety concerns. The consequences of these actions must be considered by the regulator including the time and cost associated with such legal actions.
DWR will continue to evolve its enforcement program, and it will take enforcement action against those owners that do not act on dam safety issues that are clearly in violation of the Water Code. DWR will also continue to require risk-mitigation measures, such as adjusting restrictions, for projects that are delayed.
DWR will continue its reevaluation program for its inventory of high and extremely high hazard dams (those posing a risk of life loss) to identify deficiencies. The biggest risk to Californians is not the dams with known deficiencies but rather the dams that may be deficient that are currently unknown. DWR needs to identify all deficient dams as quickly as reasonably possible to ensure their condition assessment rating is correct, but to also understand any likelihood of failure and potential actions or risk-reduction measures that must be taken.
Finally, DWR will update its 2016 peer review by seeking a new review by ASDSO to further assess its program. This will provide a technical review of and guidance to the DWR dam safety program regarding the recommendations presented here and other aspects of the dam safety program that have not been discussed in this audit. This review would also provide feedback on legislative needs and actions that could be used to guide statutory changes, rulemaking, and outreach on a State and federal level.
Response to Audit Recommendations
Levees: The auditor recommends that DWR:
⑮ This recommendation is outside of DWR's authority and control. While DWR can identify the impediments, we cannot implement a plan that is related to modifying other agencies' authorities and would require action by the Legislature.
Forming maintenance areas for all LMAs that have unacceptable maintenance ratings is a deviation from the CVFPP's risk-based approach to flood management, which prioritizes actions to address the highest risks first, and would result in inefficient use of State resources. Numerous LMAs with unacceptable ratings are either actively seeking federal deauthorization because the land behind them has been converted to riparian habitat, solely protects private property, or an LMA-lead effort to transition maintenance to the State is already underway. In these cases, using the Department's authority to form an MA would not best serve the public interest, nor would it reduce overall flood risk to lands protected by SPFC facilities.
DWR inspects and identities needed repairs throughout the SPFC twice annually. We continually seek funding to address these repairs through the State's deferred maintenance funding sources.
Dam Safety: The auditor recommends that DWR:
To ensure that it exercises its full enforcement authority over the safety of dams, Water Resources should develop processes by January 2027 to do the following:
⑧ The recommendation simplifies issues surrounding deficiencies by equating those to Water Code violations. Condition assessments and funding are not violations of the Water Code. The speed at which dam owners address large scale deficiencies should not constitute a violation of the Water Code provided owners are making progress, despite challenges. DWR's current enforcement processes consider reasonable progress and milestones, which are used to determine when cases are referred for enforcement. However, enforcement cannot be a rigid process because every owner, dam, and potential violations vary in complexity. Enforcement at this scale also neglects the legal complexity and resources DWR would need. Due process requires that the enforcement branch act independently of the remaining dam safety program, and case development heavily relies on the whole program. This would detract from the dam safety program meeting all its statutory requirements. As the program is solely funded by dam owners, it needs to consider the impact reallocations might have on dam owners. Enforcement actions, while warranted in certain cases, will add costs to owners that will delay compliance and have minimal impact on improving the overarching funding issues.
⑯ Additionally, the specified focused on administrative complaints oversimplifies the process by narrowing the actions to enforcement regulations allow DWR to achieve compliance. There are multiple actions DWR can take, and other strategies have successfully reached compliance. The ultimate objective of DWR is to mitigate deficiencies efficiently, and administrative complaints are an intense legal process that are not always effective and timely in addressing dam safety concerns.
To ensure that it has sufficient financial resources to support its enforcement of dam safety, Water Resources should immediately seek approval from the Department of Finance to charge dam owners fees sufficient to support that work.
To ensure that all owners of dams submit required EAPs, when Cal OES notifies Water Resources of delinquent owners-including those dam owners that do not meet new deadlines that the Legislature establishes-Water Resources should immediately take appropriate enforcement action against those owners for failing to submit or resubmit required EAPs timely.
To alleviate delays and increased project costs related to both dams and levees, by March 2027 Water Resources should identify all impediments, including environmental permitting, that could cause delays or excessive costs in completing dam and levee repair work or in decommissioning a dam and develop a plan by August 2027 to work with appropriate parties, including the Legislature, to minimize those impacts.
⑱ Requested Technical Corrections to Audit Report
Levees
Dam Safety
If you have any questions or need additional information, please feel free to reach out to me or Deputy Director Laura Hollender at (916) 820-8125, or [email protected].
Sincerely,
Tom Gibson
Director
To provide clarity and perspective, we are commenting on the response to our audit report from Water Resources. The numbers below correspond with the numbers we have placed in the margin of the response.
① We disagree with Water Resources' statement that the report portrays a fundamental lack of understanding of the complexities of flood management and dam safety. We conducted this audit according to generally accepted government auditing standards and the California State Auditor's thorough quality control process. In following audit standards, we are required to obtain sufficient and appropriate audit evidence to support our conclusions and recommendations. As is our standard practice, we engaged in extensive research and analysis for this audit to ensure that we could present a thorough and accurate representation of the facts. Finally, we believe that our recommendations, if fully implemented, will effectively advance statewide public safety. Accordingly, we stand by the conclusions in our report.
② Water Resources incorrectly asserts that our draft report does not adequately consider the risk management strategies articulated in the Central Valley Flood Protection Plan. In addition, we disagree with Water Resources' belief that our report inappropriately focuses too narrowly on levee maintenance when considering the department's overall risk reduction actions. We discuss some of the risk management strategies that Water Resources has employed and the progress that those strategies have had in resolving the risks attributable to LMAs' lack of maintenance. However, Water Resources has a backlog of levee sites needing repair, and has exhausted one of its funding sources for that work. Moreover, despite its efforts, maintenance ratings for many LMAs have not improved. As we stated, Water Resources rated 32 of the 102 LMAs as unacceptable during its fall 2025 inspections. In fact, Water Resources has rated 23 of these 32 LMAs as unacceptable for at least the last five years. As we stated, we found that the LMAs we reviewed received unacceptable ratings largely because of vegetation management and animal control deficiencies. Furthermore, we state that some of the deficiencies, like animal burrows and erosion sites, can have a direct impact on the structural integrity of levees. As such, we stand by our conclusion that maintenance of levees is important because it reduces the likelihood that they will fail and cause flooding that would damage property and endanger lives.
③ We stand by our conclusion that Water Resources is reluctant to form maintenance areas. Water Resources has disregarded state law that requires it to start its process to form a maintenance area when it determines that LMAs are not meeting federal requirements. As Table 3 shows, Water Resources has allowed 23 LMAs to perform maintenance at an unacceptable level for at least the last five years. Moreover, although not referenced in the report, according to its data, Water Resources has rated nine of those LMAs as unacceptable for at least 19 years and another 10 for at least 10 years. Six of the nine LMAs that have performed unacceptable maintenance for at least 19 years could endanger hundreds or thousands of people. Despite the consistent lack of maintenance by some LMAs, Water Resources has not formed a maintenance area to ensure that project levees are maintained in acceptable condition.
④ We disagree with Water Resources' claim that our report makes unsubstantiated assertions. Water Resources' management told us that the department does not have policies or a process that require an LMA to improve its levee maintenance to address identified deficiencies. Further, we do not state in the report that Water Resources does not consider unacceptable maintenance a significant risk. It is puzzling that Water Resources implies in its response that it considers unacceptable maintenance a significant risk while also stating that our audit too narrowly focused on levee maintenance.
⑤ We stand by our determination that Water Resources' reluctance to form maintenance areas increases flood risk. Water Resources' management acknowledged that unacceptable levee maintenance increases the chance that a levee may fail. When an LMA does not maintain its levees and Water Resources does not intervene by forming a maintenance area, Water Resources enables the LMA's levees' conditions to worsen, which further increases the risk that levees could fail and flood surrounding communities.
⑥ Water Resources' statement is misleading. Water Resources has not formed a maintenance area to ensure that project levees are maintained in acceptable condition, meaning that it has not proactively initiated the formation of a maintenance area because of an LMA's lack of maintenance. On the contrary, the maintenance areas cited in its response that Water Resources currently operates were required by state law or requested by LMAs.
⑦ We disagree with Water Resources' characterization of our audit report's focus on inspections and its concern regarding our lack of appreciation of its reevaluation program. Water Resources identifies deficiencies as part of its reevaluation program, which assesses whether its riskiest dams meet current operating standards. In fact, Water Resources acknowledges in its response that our report notes that its reevaluation program is responsible for identifying over two-thirds of dam deficiencies. Moreover, Water Resources also identifies in that same response that it changes the condition assessment of a dam based on the reevaluation program. The condition ratings we reviewed that Table 1 summarizes reflect changes based on reevaluations that Water Resources conducted for dams as of May 2026. In addition, Water Resources' management stated that approximately 60 to 70 percent of the deficiencies that Water Resources engineers have found among the 144 dams with less than satisfactory condition assessments are related to not meeting design standards.
⑧ Water Resources appears to misunderstand our recommendation. Our recommendation directs Water Resources to take enforcement action against dam owners that have not met its orders to address their dams' deficiencies, which is a violation of state law. Further, our recommendation does not direct Water Resources to take a rigid approach to enforcement, but rather that it should take enforcement action when a dam owner does not address Water Resources' orders within a reasonable period of time. However, we expect Water Resources to exercise its discretion in determining whether dam owners have addressed its orders within a reasonable period of time.
⑨ Water Resources' perspective is unfounded. Water Resources may impose a reservoir restriction on a dam to reduce the risks posed by the dam's deficiencies while the dam owner undergoes the planning process to address the deficiencies. We further state that Water Resources has active restrictions on 49 dams as of September 2025, including a restriction on three of the dams that we reviewed. In addition, Water Resources may issue a reservoir restriction as part of its enforcement actions.
⑩ We stand by our audit methodology and believe that our selection of dams for review provided us with a thorough perspective in conducting our audit. We reviewed six dams, including four dams that Water Resources had assessed as poor, one in unsatisfactory condition, and one in fair condition, to better understand their specific circumstances for their identified deficiencies. These dams were all classified as extremely high hazard, are used for different purposes, and are of varying ages. In addition, Water Resources' engineers have identified multiple deficiencies at each dam we selected. Further, although we did not review all 144 dams in less than satisfactory condition, Water Resources' perspective that approximately 60 to 70 percent of the deficiencies that Water Resources engineers have found among those dams are related to not meeting design standards.
⑪ Although we recognize that a lack of funds can be a key barrier that causes dam owners to delay their dam repair projects, our report does not imply that dam owners that lack funding are not taking any action. Water Resources' management informed us that dam repair projects are often delayed by dam owners because they cannot afford the cost of repairs. In fact, Water Resources acknowledges in its response that funding is the biggest issue owners face in addressing deficiencies. Further, the owners of five of the six dams we reviewed explained that they ultimately did not know how they would fund their repairs.
⑫ We disagree with Water Resources' implication that we concluded that lacking funds and owning a dam in less than satisfactory condition is a violation of state law. Water Resources may take administrative enforcement action against dam owners that disregard its requirements to take corrective action. Consequently, our conclusion is that dam owners that disregard Water Resources' requirements, including those related to remediating their dams' deficiencies, are in violation of state law.
⑬ Water Resources' response appears to undermine its ability to take appropriate enforcement action. In particular, we disagree with Water Resources that our audit does not pose a solution to the problem that dam owners may not be able to afford to repair their dams. To prevent additional dam owners from reaching this condition, our recommendations are specifically focused on ensuring that dam owners maintain adequate plans and funds to maintain their dams. We further recommend that the Legislature provide Water Resources with the authority to use its existing enforcement means to take actions against dam owners that do not develop sufficient plans for maintenance and repairs of their dams on time or that do not maintain adequate emergency funds. To address dam owners that currently cannot afford to adequately maintain their dams, we recommend Water Resources identify impediments that could cause delays or excessive costs in completing dam repair work and work with appropriate parties, including the Legislature, to minimize those impacts and reduce the burden on dam owners. Further, we recommend that Water Resources hold dam owners accountable to repair and improve their dams within reasonable timelines, or-to the extent the Legislature implements our recommendation that it provide Water Resources with additional authority-Water Resources should condemn the dam, order the owner to decommission the dam, or decommission the dam on the owner's behalf if the owner abandons the dam.
⑭ Water Resources' statement that it takes action against dam owners that warrant enforcement is not entirely accurate. Water Resources has not taken action against the owners of 20 dams that its engineers have referred for enforcement to ensure that they addressed their violations. According to its management, Water Resources has not taken compelling enforcement actions against dam owners since it finalized its regulations because it has not been able to staff its enforcement branch, and it believed that it could not afford to defend its actions in administrative hearings if dam owners challenged them.
⑮ We are puzzled by Water Resources' response to our recommendation. Water Resources is ideally positioned to identify the specific obstacles that must be overcome to ensure that the State's levees and dams are adequately maintained. Our recommendation is for Water Resources to work with relevant parties, including the Legislature, to address all impediments it identifies, which we believe is within the department's authority and control.
⑯ Water Resources mischaracterizes our recommendation by stating that it narrows the department's actions to only Administrative Complaints to achieve compliance. Our recommendation aligns with Water Resources' enforcement regulations that state that Water Resources may issue dam owners an Administrative Complaint when they do not take corrective action in response to Water Resources' Notices of Violation. We would expect Water Resources to use its other actions and strategies as needed while still adhering to its regulations.
⑰ Water Resources incorrectly states that it does not have enforcement cases that warrant enforcement actions. Water Resources has not taken action against the owners of 20 dams that its engineers have referred for enforcement to ensure that they addressed their violations. Further, Water Resources stated during our audit that it would have pursued an administrative complaint against a few noncompliant dam owners had it requested and obtained sufficient funding for the associated legal costs.
⑱ Water Resources' inclusion of suggested wording changes in its response to the audit is surprising. As we do for all audits, we provided Water Resources a five-day period to review and comment on a draft copy of the report, and we asked it to contact us if it had any concerns with the text. However, even though we met with the department's management during its review period specifically to discuss such matters, Water Resources failed to share with us its concerns on the draft report text. Nevertheless, we carefully considered Water Resources' comments and suggested text changes, and we made changes that we believed were warranted based on the evidence we obtained during the audit and the additional perspective Water Resources provided in its response.
⑲ During the publication process for the audit report, page numbers shifted. Therefore, the page numbers cited by Water Resources in its response may not correspond to the page numbers in the final published audit report.
September 18, 2026
Grant Parks
California State Auditor
621 Capitol Mall, Suite 1200
Sacramento, CA 95814
Subject: 2025-603 State High Risk: Water Infrastructure
Dear Grant Parks:
The California Governor's Office of Emergency Services (Cal OES) received the California State Auditor's (CSA) High Risk Audit 2025-603 redacted Draft Report on September 14, 2026, via email. Cal OES appreciates the opportunity to respond and provide its corrective action plan to CSA's High Risk Audit recommendation.
The CSA's finding states: "…The owners of 60 high-risk dams have not complied with state law that requires them to create and submit to the…Cal OES emergency action plans (EAPs)… some dam owners who did submit plans have not been responsive to Cal OES's request for revisions… Cal OES has not coordinated with Water Resources [Department of Water Resources (DWR)] to ensure that they do so…"
The CSA recommends: "…To ensure that all owners of dams submit and resubmit required EAPs, Cal OES should immediately report to Water Resources [DWR] those dam owners who are delinquent in submitting or resubmitting their EAPs, including those dam owners that do not meet new deadlines that the Legislature establishes, so that Water Resources [DWR] can take the appropriate enforcement action against those owners. Further, it should establish a process to report such information to Water Resources on a quarterly basis."
Cal OES corrective action: Cal OES agrees with CSA's recommendation.DWR is responsible for implementing California's Dam Safety Program pursuant to Division 3, Part 1 of the California Water Code. Also, consistent with Title 23 of the California Code of Regulations, section 337, DWR is responsible for enforcement actions over dam owners in coordination with Cal OES. Accordingly, Cal OES will coordinate with DWR's Division of Safety of Dams (DSOD) to pursue appropriate enforcement action against dam owners who have never submitted the required EAPs. In addition, Cal OES will report to DWR DSOD those dam owners who failed to resubmit their EAPs and have become nonresponsive to Cal OES requests for revisions.
Following coordination discussions with DWR DSOD, Cal OES will update its policies and procedures to ensure compliance with the CSA's recommendation. These updates will include procedures for:
Cal OES appreciates the assistance and guidance provided by CSA during its audit. If you have additional questions or concerns, please contact Rosa Golla, Cal OES Office of Audits and Investigations Chief, at (279) 300-7157.
Sincerely,
CAROLINE THOMAS JACOBS
Director
cc: Rosa Golla, Chief, Office of Audits and Investigations
Ian Bastek, Chief Deputy Director, Operations
Lori Nezhura, Deputy Director, Planning, Preparedness, and Prevention