CEZ a.s.

02/18/2026 | Press release | Distributed by Public on 02/18/2026 01:02

Information on NPP DUKOVANY 18/2/2026

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 is in Mode 1 - startup mode, Reactor power is 89,2 %, Turbine generator output - 456 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 510 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 515 MWe

Electricity production since the beginning of the year: 1 778 689 MWh.

CEZ a.s. published this content on February 18, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on February 18, 2026 at 07:04 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]