OVERVIEW
The Company is a diversified energy company engaged principally in the production, gathering, transportation, storage and distribution of natural gas. The Company operates an integrated business, with a common geographic footprint that enables the Company to share management, labor, facilities and support services across various businesses and pursue coordinated projects designed to produce and transport natural gas from the Appalachian Basin to markets in the eastern United States and Canada. The Company's efforts in this regard are not limited to affiliated projects. The Company has also been designing and building pipeline projects for the transportation of natural gas for non-affiliated natural gas customers in the Appalachian Basin. In addition to expansion projects and the integration of recently acquired Utility assets in Ohio, as discussed below, the Company continues to focus on the ongoing modernization of its regulated Pipeline and Storage and Utility assets. The Company reports financial results for three business segments: Integrated Upstream and Gathering, Pipeline and Storage, and Utility.
Fiscal 2026 Highlights
This Item 7, MD&A, provides information concerning:
1.The critical accounting estimates of the Company;
2.Changes in revenues and earnings of the Company under the heading, "Results of Operations;"
3.Operating, investing and financing cash flows under the heading "Capital Resources and Liquidity" and;
4.Other Matters, including: (a) 2026 and projected 2027 funding for the Company's pension and other post-retirement benefits; (b) disclosures and tables concerning market risk sensitive instruments; (c) rate matters in the Company's New York, Pennsylvania and FERC-regulated jurisdictions; (d) environmental matters; (e) new authoritative accounting and financial reporting guidance; and (f) effects of inflation.
The information in MD&A should be read in conjunction with the Company's financial statements in Item 8 of this report, which includes a comparison of our Results of Operations and Capital Resources and Liquidity for fiscal 2026 and fiscal 2025. For a discussion of the Company's earnings, refer to the Results of Operations section below. A discussion of changes in the Company's results of operations from fiscal 2024 to fiscal 2025 has been omitted from this Form 10-K, but may be found in Item 7, MD&A, of the Company's Form 10-K for the fiscal year ended September 30, 2025, filed with the SEC on November 21, 2025.
On October 1, 2026, the Company acquired all of the issued and outstanding equity interests of Vectren Energy Delivery of Ohio, LLC ("CenterPoint Ohio") from CenterPoint Energy Resources Corp. (the "Seller") for an aggregate purchase price of $2.64 billion, consisting of $1.44 billion in cash consideration and a $1.2 billion promissory note issued by the Company to the Seller. The $1.44 billion in cash consideration was funded with a combination of common equity, long-term debt and short-term borrowings. This acquisition adds significant regulated scale for the Company, approximately doubling the size of the Company's gas utility rate base, while expanding its operations beyond New York and Pennsylvania into the neighboring state of Ohio, a state with a historically constructive regulatory and political environment that is supportive of natural gas. The Company has renamed the acquired entity National Fuel Gas Distribution of Ohio, LLC ("Distribution Ohio"). Refer to Item 8, Note B - Acquisitions and Divestitures, for further discussion of this acquisition.
On October 14, 2026, the Company announced its plan to separate the Company into two independent, publicly traded companies through a tax-free spin-off of the Company's Integrated Upstream and Gathering business ("IUG"). The Company's IUG business will become an independent public company focused solely on its highly integrated, Appalachian upstream and gathering natural gas assets. Post-separation, the Company will be a 100% rate-regulated natural gas company in New York, Pennsylvania and Ohio, with both utility and interstate pipeline and storage assets. The Company expects to complete the separation during the second half of calendar year 2027, subject to customary conditions, including the filing and effectiveness of applicable filings (including a Form 10 registration statement) with the SEC, the completion of financing arrangements, and final
-36-
approval by the Company's Board of Directors. The Company intends to separate IUG through a pro rata distribution of shares of at least 80.1% of IUG to National Fuel shareholders in a manner that is intended to be tax-free for the Company and its shareholders for U.S. federal income tax purposes. The Company expects to retain an ownership stake of up to 19.9% in IUG after the completion of the spin-off, which it intends to dispose of in a tax-efficient manner to further strengthen its investment grade balance sheet.
The Company has continued to pursue development projects to expand its Pipeline and Storage segment. One project on Supply Corporation's system, referred to as the Tioga Pathway Project, is an expansion and modernization project in northwest Tioga County, Pennsylvania. On May 5, 2025, FERC issued the Section 7(b)/7(c) certificate for the project and on January 8, 2026, FERC issued the Notice to Proceed with Construction. The project was placed in service on November 1, 2026.
Supply Corporation also announced that it will serve as the transporter of 205,000 Dth per day of natural gas supplies to the Shippingport Power Station site in Beaver County, Pennsylvania, which will support a co-located data center that is currently under development. The project obtained FERC authorization under the Commission's prior notice regulations on November 7, 2025 and was placed in service on November 1, 2026.
Supply Corporation has also developed its Line N System Upgrade Project, which will consist of modernization of primarily 1960's era pipeline in Beaver County, Pennsylvania, as well as minor compressor station and facility upgrades, to create approximately 294,000 Dth per day of additional natural gas transportation capacity (1) from a new interconnection on the southern portion of Supply Corporation's Line N system in Greene County, Pennsylvania to an existing Supply Corporation interconnection with Tennessee Gas Pipeline Company, LLC at Mercer and (2) from an existing Supply Corporation interconnection with Texas Eastern Transmission, LP at Holbrook to a new interconnection at the Shippingport Industrial Park in Shippingport, Pennsylvania. Supply Corporation executed long-term precedent agreements with two shippers for 100% of the incremental capacity created by the project. The project has a projected in-service date of November 2028. The Tioga Pathway Project, Shippingport Lateral Project and Line N System Upgrade Project are all discussed in more detail in the Capital Resources and Liquidity section that follows.
From a rate perspective, Distribution Corporation, in its New York jurisdiction, is currently in the third year of a three-year rate plan that was approved by the NYPSC on December 19, 2024. The rate plan reflects a return on equity of 9.7% and authorized a revenue requirement increase of $57.3 million in fiscal 2025, an additional revenue requirement increase of $15.8 million in fiscal 2026, and an additional revenue requirement increase of $12.7 million in fiscal 2027. The settlement also included standard make-whole language allowing full recovery of revenues that would have been billed at the new rates between October 1, 2024 and December 31, 2024. In addition, on May 5, 2026, Distribution Corporation filed a petition with the NYPSC for authorization to implement a system modernization tracker reconciliation mechanism through which qualified leak prone pipe removal costs incurred by the Company would be tracked and recovered. On August 17, 2026, the Commission issued an order authorizing Distribution Corporation to implement a system modernization tracker reconciliation mechanism commencing on October 1, 2027 that will remain in effect until the Commission next sets new base rates for Distribution Corporation or September 30, 2029, whichever comes first.
In Distribution Corporation's Pennsylvania jurisdiction, the PaPUC issued an order on October 22, 2026 ("2026 Rate Order") related to Distribution Corporation's rate case filing authorizing an annual revenue increase of approximately $10.4 million and reflecting a return on equity of 9.86%. The 2026 Rate Order authorizes continuation of the Company's weather normalization adjustment mechanism as a pilot until a final order is entered in the Company's next base rate case. It also approves a five-year residential energy efficiency pilot and associated cost-recovery rider. The 2026 Rate Order further approves the return of approximately $7.2 million of remaining OPEB surcredit funds to customers. In accordance with PaPUC regulations, Distribution Corporation filed a supplement to its Pennsylvania gas tariff in compliance with the 2026 Rate Order ("Compliance Filing"). The Compliance Filing was approved by the PaPUC and rates were implemented by Distribution Corporation on November 9, 2026. For further discussion of Distribution Corporation's rate matters, refer to the Rate Matters section below.
-37-
From a FERC rate perspective, Supply Corporation filed an NGA Section 4 rate case at FERC on April 30, 2026 proposing rate increases to be effective November 1, 2026. Supply Corporation's filing requests an annual cost of service of approximately $404 million, an increase of approximately $95 million from Supply Corporation's settlement of its 2023 rate proceeding. New rates went into effect on November 1, 2026, subject to refund. For further discussion of FERC rate matters, refer to the Rate Matters section below.
The Company's Integrated Upstream and Gathering segment had a 4% increase in proved reserves from the prior year to a total of 5,191 Bcfe at September 30, 2026. As discussed in the following Critical Accounting Estimates section, the Company uses the full cost method of accounting for determining the book value of its exploration and production properties and that book value is subject to a quarterly ceiling test. The Company recorded a non-cash impairment charge under the ceiling test during the quarter ended December 31, 2024 of $108.3 million ($79.1 million after-tax). At September 30, 2026, the ceiling exceeded the book value of the exploration and production properties, and thus, did not result in an impairment charge in the quarter ended September 30, 2026. Please refer to the Critical Accounting Estimates section below for more details on this matter and a sensitivity analysis concerning commodity price changes.
On March 27, 2026, the Company entered into an Amended and Restated Credit Agreement (the "Credit Agreement") with PNC Bank, National Association, as administrative agent and lender, and 12 additional lenders. The Credit Agreement provides a $1.3 billion unsecured committed revolving credit facility with an initial maturity date of March 27, 2031. For further discussion of the Credit Agreement, refer to the Capital Resources and Liquidity section below.
The Company expects to use cash from operations and short-term and/or long-term borrowings, as needed, to meet its financing needs for fiscal 2027. The Company continues to evaluate these financing needs and options to meet them. Given the current economic conditions, which include continued inflationary pressures, volatile interest rates and the ongoing impacts of federal policy changes, the cost and/or availability of capital may be impacted, but the Company continues to expect to meet its financing needs.
CRITICAL ACCOUNTING ESTIMATES
The Company has prepared its consolidated financial statements in conformity with GAAP. The preparation of these financial statements requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. In the event estimates or assumptions prove to be different from actual results, adjustments are made in subsequent periods to reflect more current information. The following is a summary of the Company's most critical accounting estimates, which are defined as those estimates whereby judgments or uncertainties could affect the application of accounting policies and materially different amounts could be reported under different conditions or using different assumptions. For a complete discussion of the Company's significant accounting policies, refer to Item 8 at Note A - Summary of Significant Accounting Policies.
Exploration and Development Costs. In the Company's Integrated Upstream and Gathering segment, upstream property acquisition, exploration and development costs are accounted for under the full cost method of accounting. Under this accounting methodology, all costs associated with property acquisition, exploration and development activities are capitalized, including internal costs directly identified with acquisition, exploration and development activities. The internal costs that are capitalized do not include any costs related to production, general corporate overhead, or similar activities. The Company does not recognize any gain or loss on the sale or other disposition of properties unless the gain or loss would significantly alter the relationship between capitalized costs and proved reserves attributable to a cost center.
Proved reserves are estimated quantities of reserves that, based on geologic and engineering data, appear with reasonable certainty to be producible under existing economic and operating conditions. Such estimates of proved reserves are inherently imprecise and may be subject to substantial revisions as a result of numerous factors including, but not limited to, additional development activity, evolving production history and continual reassessment of the viability of production under varying economic conditions. The estimates involved in
-38-
determining proved reserves are critical accounting estimates because they serve as the basis over which capitalized costs are depleted under the full cost method of accounting (on a units-of-production basis). Unproved properties are excluded from the depletion calculation until proved reserves are found or it is determined that the unproved properties are impaired. All costs related to unproved properties are reviewed quarterly to determine if impairment has occurred. The amount of any impairment is transferred to the pool of capitalized costs being amortized.
In addition to depletion under the units-of-production method, proved reserves are a major component in the SEC full cost ceiling test. The full cost ceiling test is an impairment test prescribed by SEC Regulation S-X Rule 4-10. The ceiling test, which is performed each quarter, determines a limit, or ceiling, on the amount of property acquisition, exploration and development costs that can be capitalized. The ceiling under this test represents (a) the present value of estimated future net cash flows, excluding future cash outflows associated with settling asset retirement obligations that have been accrued on the balance sheet, using a discount factor of 10%, which is computed by applying an unweighted arithmetic average of the first day of the month commodity prices for each month within the twelve-month period prior to the end of the reporting period (as adjusted for hedging) to estimated future production of proved reserves as of the date of the latest balance sheet, less estimated future expenditures, plus (b) the cost of unproved properties not being depleted, less (c) income tax effects related to the differences between the book and tax basis of the properties. The estimates of future production and future expenditures are based on internal budgets that reflect planned production from current wells and expenditures, which are based on current costs, associated with future production. The amount of the ceiling can fluctuate significantly from period to period because of additions to or subtractions from proved reserves and significant fluctuations in natural gas prices. The ceiling is then compared to the capitalized cost of exploration and production properties less accumulated depletion and related deferred income taxes. If the capitalized costs of exploration and production properties less accumulated depletion and related deferred taxes exceeds the ceiling at the end of any fiscal quarter, a non-cash impairment charge must be recorded to write down the book value of the reserves to their present value. This non-cash impairment cannot be reversed at a later date if the ceiling increases. It should also be noted that a non-cash impairment to write down the book value of the reserves to their present value in any given period causes a reduction in future depletion expense. At September 30, 2026, the ceiling exceeded the book value of the exploration and production properties by approximately $1.3 billion (after-tax). The 12-month average of the first day of the month price for natural gas for each month during 2026, based on the quoted Henry Hub spot price for natural gas, was $3.62 per MMBtu. (Note: Because actual pricing of the Company's producing properties varies depending on their location and hedging, the prices used to calculate the ceiling may differ from the Henry Hub price, which is only indicative of 12-month average prices for 2026. Actual realized pricing includes adjustments for regional market differentials, transportation fees and contractual arrangements.) In regard to the sensitivity of the ceiling test calculation to commodity price changes, if natural gas prices were $0.25 per MMBtu lower than the average prices in the twelve-month period used at September 30, 2026 in the ceiling test calculation, the ceiling would have exceeded the book value of the Company's exploration and production properties by approximately $847.5 million (after-tax), which would not have resulted in an impairment charge. This calculated amount is based solely on price changes and does not take into account any other changes to the ceiling test calculation, including, among others, changes in reserve quantities and future cost estimates.
It is difficult to predict what factors could lead to future non-cash impairments under the SEC's full cost ceiling test. Fluctuations in or subtractions from proved reserves, increases in development costs for undeveloped reserves and significant fluctuations in natural gas prices have an impact on the amount of the ceiling at any point in time.
As discussed above, the full cost method of accounting provides a ceiling to the amount of costs that can be capitalized in the full cost pool. In accordance with current authoritative guidance, the future cash outflows associated with plugging and abandoning wells are excluded from the computation of the present value of estimated future net revenues for purposes of the full cost ceiling calculation.
Regulation. The Company is subject to regulation by certain state and federal authorities. The Company, in its Utility and Pipeline and Storage segments, has accounting policies which conform to the FASB authoritative guidance regarding accounting for certain types of regulations, and which are in accordance with
-39-
the accounting requirements and ratemaking practices of the regulatory authorities. The application of these accounting principles for certain types of rate-regulated activities provides that certain actual or anticipated costs that would otherwise be charged to expense can be deferred as regulatory assets, based on the expected recovery from customers in future rates. Likewise, certain actual or anticipated credits that would otherwise reduce expense can be deferred as regulatory liabilities, based on the expected flowback to customers in future rates. Management's assessment of the probability of recovery or pass through of regulatory assets and liabilities requires judgment and interpretation of laws and regulatory commission orders. If, for any reason, the Company ceases to meet the criteria for application of regulatory accounting treatment for all or part of its operations, the regulatory assets and liabilities related to those portions ceasing to meet such criteria would be eliminated from the balance sheet and included in the Consolidated Statement of Income for the period in which the discontinuance of regulatory accounting treatment occurs. Such amounts would be classified as an extraordinary item. For further discussion of the Company's regulatory assets and liabilities, refer to Item 8 at Note F - Regulatory Matters.
RESULTS OF OPERATIONS
EARNINGS
2026 Compared with 2025
The Company's earnings were $665.4 million in 2026 compared to earnings of $518.5 million in 2025. The increase in earnings of $146.9 million was primarily the result of higher earnings in the Integrated Upstream and Gathering segment, partially offset by a higher loss in the Corporate category. In the discussion that follows, all amounts used in the earnings discussions are after-tax amounts, unless otherwise noted. Earnings were impacted by the following event in 2025:
2025 Event
•Non-cash impairment charges of $141.8 million ($103.6 million after-tax) recorded during 2025 in the Integrated Upstream and Gathering segment, consisting mostly of a ceiling test impairment charge of $108.3 million ($79.1 million after-tax). The remaining charges are related to an impairment of certain water disposal assets.
Earnings (Loss) by Segment
Year Ended September 30
2026 2025 2024
(Thousands)
Integrated Upstream and Gathering $ 503,390 $ 324,698 $ (57,041)
Pipeline and Storage 117,804 120,957 79,670
Utility 90,066 83,249 57,089
Total Reported Segments 711,260 528,904 79,718
All Other 296 (814) (617)
Corporate (46,113) (9,586) (1,588)
Total Consolidated $ 665,443 $ 518,504 $ 77,513
-40-
INTEGRATED UPSTREAM AND GATHERING
Revenues
Integrated Upstream and Gathering Operating Revenues
Year Ended September 30
2026 2025
(Thousands)
Gas Produced in Appalachia (after Hedging) $ 1,252,385 $ 1,151,240
Gathering 11,630 11,813
Other 20,608 21,083
Operating Revenues $ 1,284,623 $ 1,184,136
Production
Year Ended September 30
2026 2025
Gas Production (MMcf) 419,469 426,357
Average Prices
Year Ended September 30
2026 2025
Average Gas Price/Mcf
Weighted Average $ 2.80 $ 2.59
Weighted Average After Hedging(1) $ 2.99 $ 2.70
(1)Refer to further discussion of hedging activities below under "Market Risk Sensitive Instruments" and in Note J - Financial Instruments in Item 8 of this report.
2026 Compared with 2025
Operating revenues for the Integrated Upstream and Gathering segment increased $100.5 million in 2026 as compared with 2025. Gas production revenue after hedging increased $101.1 million due to the impact of a $0.29 per Mcf increase in the weighted average price of natural gas after hedging, partially offset by a 6.9 Bcf decrease in natural gas production. The decrease in natural gas production in 2026 as compared with 2025 was largely due to the base production decline on producing wells, mostly offset by wells recently turned in line.
Refer to further discussion of derivative financial instruments in the "Market Risk Sensitive Instruments" section that follows. Refer to the tables above for production and price information.
-41-
Earnings
2026 Compared with 2025
The Integrated Upstream and Gathering segment's earnings in 2026 were $503.4 million, an increase of $178.7 million when compared with earnings of $324.7 million in 2025. The $178.7 million increase was primarily attributed to the following factors:
(Millions)
Prior period's non-cash impairments of assets $ 103.6
(1)
Higher natural gas prices after hedging 94.6
Lower interest expense 13.6
(2)
Lower income tax expense 4.1
(3)
Prior period mark to market adjustment on contingent consideration 3.9
(4)
Lower other tax expense 1.7
(5)
Lower premiums paid on early redemption of debt 1.4
(6)
Earnings impact associated with remeasurement of state deferred income taxes
due to ceiling test impairments
1.0 (7)
Higher depletion expense (15.9) (8)
Lower natural gas production (14.7)
Higher lease operating expense (12.4) (9)
Higher other operating expenses (1.4) (10)
Other items (0.8)
$ 178.7
(1)Includes a ceiling test impairment of $79.1 million and a $24.5 million impairment of certain water disposal assets recorded during the quarter ended December 31, 2024.
(2)The decrease in interest expense was mainly attributed to lower short-term and long-term intercompany borrowings.
(3)The decrease in income tax expense was mainly attributed to the corporate tax sharing agreement, which allocates the Company's tax benefit to each subsidiary based on the subsidiary's taxable income. This was combined with net operating loss and state tax rate adjustments.
(4)Includes unrealized losses in 2025 related to contingent consideration received as part of the sale of this segment's California oil properties in 2022, net of tax effects. The fair value of the contingent consideration was reduced to zero during 2025.
(5)The decrease in other tax expense was primarily attributable to fewer wells subject to the Impact Fee. This decrease reflects wells reaching the 15-year limit for Impact Fee assessments, resulting in fewer fee-eligible wells despite an increase in the overall well count.
(6)Represents this segment's share of the premiums incurred in connection with the Company's redemption of long-term debt in 2025, partially offset by premiums incurred on long-term debt redemptions in 2026. Refer to Note H - Capitalization and Short-Term Borrowings for further discussion.
(7)The increase was due to a $1.0 million earnings reduction associated with the remeasurement of state deferred income taxes in 2025.
(8)The increase in depletion was primarily due to a lower depletion rate in the prior year as a result of ceiling test impairments recorded in the third and fourth quarters of fiscal 2024, as well as the first quarter of fiscal 2025, that lowered Seneca's full cost pool depletable base.
(9)The increase in lease operating expense was primarily the result of additional third-party gathering and transportation costs combined with higher road maintenance costs.
(10)The increase in other operating expenses was mainly attributed to higher gathering operation and maintenance costs and higher accretion expense, partially offset by lower abandonment costs recognized during 2026, as well as lower personnel costs.
-42-
PIPELINE AND STORAGE
Revenues
Pipeline and Storage Operating Revenues
Year Ended September 30
2026 2025
(Thousands)
Firm Transportation $ 324,967 $ 323,470
Interruptible Transportation 744 709
325,711 324,179
Firm Storage Service 101,891 100,292
Interruptible Storage Service 182 -
102,073 100,292
Other 3,927 3,130
$ 431,711 $ 427,601
Pipeline and Storage Throughput - (MMcf)
Year Ended September 30
2026 2025
Firm Transportation 816,238 785,147
Interruptible Transportation 2,637 984
818,875 786,131
2026 Compared with 2025
Operating revenues for the Pipeline and Storage segment increased $4.1 million in 2026 as compared with 2025. For the year ended September 30, 2026, the increase in operating revenue was primarily driven by an increase in storage revenues of $1.8 million and an increase in transportation revenues of $1.5 million, along with higher other revenues of $0.8 million. The increase in storage revenues was primarily attributable to remarketed capacity from customer contract negotiations, higher rates and deliverability enhancements on existing contracts, and increased commodity revenue driven by colder weather, partially offset by a decrease in storage revenues from contract revisions. The increase in transportation revenues was primarily attributable to new long-term contracts, rate increases on existing contracts and an adjustment to match electric surcharge revenues with electric power costs recorded in operation and maintenance expense, partially offset by a decrease in transportation revenues from revisions to existing contracts. The increase in other revenues primarily reflects an adjustment to match electric surcharge revenues with electric power costs recorded in operation and maintenance expense mentioned above along with a gain from the sale of vehicles.
Transportation volume increased by 32.7 Bcf in 2026 as compared with 2025, primarily due to an increase in new and existing shipper demand, as well as increased utilization resulting from colder weather. Volume fluctuations, other than those caused by the addition or termination of contracts, generally do not have a significant impact on revenues as a result of the straight fixed-variable rate design utilized by Supply Corporation and Empire.
The majority of Supply Corporation's and Empire's transportation and storage contracts allow either party to terminate the contract upon six or twelve months' notice effective at the end of the primary term and include "evergreen" language that allows for annual term extension(s). The Pipeline and Storage segment's contracted transportation and storage capacity with both affiliated and unaffiliated shippers is expected to increase in fiscal 2027, primarily due to the Tioga Pathway and Shippingport Lateral projects that were placed in service on November 1, 2026, which combined are expected to add 380 MDth per day of incremental contracted capacity compared to fiscal 2026 levels. These projects are discussed in more detail in the Capital Resources and Liquidity section that follows.
-43-
Earnings
2026 Compared with 2025
The Pipeline and Storage segment's earnings in 2026 were $117.8 million, a decrease of $3.2 million when compared with earnings of $121.0 million in 2025. The $3.2 million decrease can be attributed to the following factors:
(Millions)
Higher depreciation expense $ (3.5)
(1)
Higher operating expenses (3.1)
(2)
Higher interest expense (1.8)
(3)
Higher operating revenue 3.2
Lower income tax expense 1.5
(4)
Other items 0.5
$ (3.2)
(1)The increase in depreciation expense primarily reflects additional plant in-service.
(2)The increase in operating expense is primarily due to higher power costs related to Empire's electric motor drive compressor station along with higher transportation costs driven by higher fuel and material costs. Partially offsetting these increases was a decrease in outside service expense, largely driven by lower storage well re-plugging costs and preventative maintenance, as well as a decrease in personnel costs. The increase in electric power costs is offset by an equal increase in revenue.
(3)The increase in interest expense was primarily driven by an increase in interest on additional intercompany long-term borrowings associated with the Company's June 2026 debt issuance, partially offset by a decrease in intercompany short-term borrowings.
(4)The decrease in income tax expense is mainly attributed to the corporate tax sharing agreement, which allocates the Company's tax benefit to each subsidiary based on the subsidiary's taxable income. This was combined with a change in state apportionment factors used in the current year when compared to the prior year, along with a decrease in Pennsylvania state income tax rates in the current year.
UTILITY
Revenues
Utility Operating Revenues
Year Ended September 30
2026 2025
(Thousands)
Retail Revenues:
Residential $ 716,937 $ 610,370
Commercial 97,045 82,364
Industrial 5,330 4,417
819,312 697,151
Transportation 117,039 111,692
Other 12,189 8,786
$ 948,540 $ 817,629
-44-
Utility Throughput - (MMcf)
Year Ended September 30
2026 2025
Retail Sales:
Residential 67,770 64,267
Commercial 10,985 10,614
Industrial 641 635
79,396 75,516
Transportation 69,092 66,202
148,488 141,718
Degree Days
Percent (Warmer)
Colder Than
Year Ended September 30 Normal Actual Normal(1) Prior Year(1)
2026 Buffalo, NY 6,307 6,447 2.2 % 9.5 %
Erie, PA 5,771 5,984 3.7 % 6.9 %
2025 Buffalo, NY 6,307 5,885 (6.7) % 14.0 %
Erie, PA 5,771 5,597 (3.0) % 17.0 %
(1)Percents compare actual degree days to normal degree days and actual degree days to actual prior year degree days.
2026 Compared with 2025
Operating revenues for the Utility segment increased $130.9 million in 2026 compared with 2025. The increase resulted from a $122.2 million increase in retail gas sales revenue, as well as a $5.3 million increase in transportation revenue and a $3.4 million increase in other revenue. The increases in retail gas sales and transportation revenue reflects higher base delivery rates effective October 1, 2025 from the impact of the implementation of year two of Distribution Corporation's three-year rate settlement in its New York jurisdiction. Additional details regarding the base rate regulatory proceeding can be found in the Rate Matters section below. The increase in retail gas sales revenue also reflects higher revenues collected from customers for purchased gas costs resulting from a 3.9 Bcf increase in throughput mainly due to colder weather combined with an increase in the cost of gas sold (per Mcf). Retail gas sales revenue and transportation revenue were also impacted by a $5.4 million increase to revenue from a distribution system improvement charge ("DSIC") modernization tracker in Pennsylvania that became effective in January 2025. For further discussion of the DSIC tracker, refer to the Rate Matters section below. The increase in transportation revenue also reflects a 2.9 Bcf increase in throughput due primarily to colder weather. The increase in other revenue was primarily due to increases in late payment charges billed to customers ($1.5 million) and capacity release revenues ($0.7 million), as well as certain net positive revenue adjustments as a result of operational performance tied to safety performance measures in accordance with the rate settlement ($0.8 million).
Purchased Gas
The cost of purchased gas is one of the Company's largest operating expenses. Annual variations in purchased gas costs are attributed directly to changes in gas sales volume, the price of gas purchased and the operation of purchased gas adjustment clauses. Distribution Corporation recorded $458.2 million and $358.5 million of Purchased Gas expense during 2026 and 2025, respectively. Under its purchased gas adjustment clauses in New York and Pennsylvania, Distribution Corporation does not profit from fluctuations in gas costs. Purchased Gas expense recorded on the consolidated income statement matches the revenues collected from customers, a component of Operating Revenues on the consolidated income statement. Under mechanisms approved by the NYPSC in New York and the PaPUC in Pennsylvania, any difference between actual purchased gas costs and what has been collected from the customer is deferred on the consolidated
-45-
balance sheet as either an asset, Unrecovered Purchased Gas Costs, or a liability, Amounts Payable to Customers. These deferrals are subsequently collected from the customer or passed back to the customer, subject to review by the NYPSC and the PaPUC. Absent disallowance of full recovery of Distribution Corporation's purchased gas costs, such costs do not impact the profitability of the Company. Purchased gas costs impact cash flow from operations due to the timing of recovery of such costs versus the actual purchased gas costs incurred during a particular period. Distribution Corporation's purchased gas adjustment clauses seek to mitigate this impact by adjusting revenues on either a quarterly or monthly basis.
Distribution Corporation contracts for firm long-term transportation and storage capacity services with rights-of-first-refusal from ten upstream pipeline companies including Supply Corporation for transportation and storage services and Empire, for transportation services. Distribution Corporation contracts for firm spot and term gas supplies with various producers, marketers and two local distribution companies to meet its gas purchase requirements. Additional discussion of the Utility segment's gas purchases appears under the heading "Sources and Availability of Raw Materials" in Item 1.
Earnings
2026 Compared with 2025
The Utility segment's earnings in 2026 were $90.1 million, an increase of $6.9 million when compared with earnings of $83.2 million in 2025. The increase can be attributed to the following factors:
(Millions)
Higher margin $ 24.6
(1)
Higher operating expenses (14.0)
(2)
Higher depreciation expense (2.1)
(3)
Higher other taxes (1.7)
(4)
Other items 0.1
$ 6.9
(1)The increase in margin (operating revenue less purchased gas expense) was primarily attributable to the impact of higher base rates in Distribution Corporation's New York jurisdiction, higher customer usage, as well as an increase in margin from the DSIC modernization tracker in Pennsylvania, all of which are discussed above.
(2)The increase in operating expenses was largely attributable to higher uncollectible expenses primarily due to a non-recurring benefit from a regulatory adjustment in the prior year, as well as higher costs for personnel, fuel, materials and outside services.
(3)The increase in depreciation expense was attributable to higher average property, plant and equipment balances.
(4)The increase in other taxes was mainly attributable to higher revenue taxes due to the increase in operating revenue.
The impact of weather variations on earnings in the Utility segment is mitigated by a WNA. The WNA, which covers the eight-month period from October through May, has had a stabilizing effect on customer bills and earnings for the Utility segment. For 2026, the WNA reduced earnings of approximately $1.1 million and $1.0 million, respectively, in the Utility segment's New York and Pennsylvania rate jurisdictions as the weather was colder than normal on a cycle-bill basis in both jurisdictions. For 2025, the WNA preserved earnings of approximately $3.9 million and $1.7 million, respectively, in the Utility segment's New York and Pennsylvania rate jurisdictions as the weather was warmer than normal on a cycle-bill basis in both jurisdictions.
-46-
ALL OTHER AND CORPORATE OPERATIONS
Earnings
2026 Compared with 2025
All Other and Corporate operations had a net loss of $45.8 million in 2026, an increase in net loss of $35.4 million when compared with a net loss of $10.4 million in 2025. The increase in net loss was primarily attributable to external transaction costs associated with the CenterPoint Ohio acquisition completed on October 1, 2026 ($20.7 million). Additional contributors to the increase in net loss were external transaction costs associated with the Company's planned tax-free spin-off of its IUG business ($7.5 million), higher income tax expense primarily due to income tax allocations under the Company's consolidated tax sharing arrangement ($5.7 million), higher operating expense ($5.6 million) primarily due to an increase in internal labor costs and employee benefits, partially offset by lower legal and consulting fees, and net interest expense associated with the June 2026 debt issuances for the CenterPoint Ohio acquisition ($4.1 million). Partially offsetting these increases in net loss was a net interest benefit arising from the December 2025 equity issuance ($8.5 million). While the proceeds of the equity issuance were intended for the acquisition, in the short term those proceeds created interest income and, to a larger extent, reduced borrowing and interest expense. Refer to Part II, Item 8 at Note B - Acquisitions and Divestitures for further discussion of this acquisition.
OTHER INCOME (DEDUCTIONS)
Although most of the variances in Other Income (Deductions) are discussed in the earnings discussion by segment above, the following is a summary on a consolidated basis (amounts below are pre-tax amounts):
Net other income on the Consolidated Statements of Income was $53.9 million in 2026 compared to net other income of $36.4 million in 2025, for a net increase of $17.5 million. This increase can be attributed primarily to interest income associated with the 2026 debt issuances completed in June 2026 to finance the CenterPoint Ohio acquisition completed on October 1, 2026 ($14.0 million), as mentioned above, an increase in allowance for funds used during construction ("AFUDC") related to the construction of the Tioga Pathway and Shippingport Lateral projects as well as changes in the AFUDC capitalization rate ($3.2 million), higher income from unconsolidated subsidiaries ($1.4 million), and an interest benefit arising from the December 2025 equity issuance ($0.9 million). While the proceeds of the equity issuance were intended for the CenterPoint Ohio acquisition completed on October 1, 2026, in the short term those proceeds provided interest income, as discussed above. Refer to Item 8, Note B - Acquisitions and Divestitures for further discussion of this acquisition. The nonrecurrence of a $0.7 million revaluation adjustment in the Integrated Upstream and Gathering segment for contingent consideration that reduced other income during 2025 also contributed to the increase in net other income. Partially offsetting these increases was a decrease in non-service pension and post-retirement benefit income ($2.7 million).
INTEREST CHARGES
Although most of the variances in Interest Charges are discussed in the earnings discussion by segment above, the following is a summary on a consolidated basis (amounts below are pre-tax amounts):
Interest on long-term debt increased $0.7 million in 2026 as compared to 2025. This increase is primarily due to higher average balances on long-term debt. The Company repaid a $300 million delayed draw term loan in January 2026. On June 10, 2026, the Company issued $500 million of 4.75% notes, $500 million of 5.05% notes and $500 million of 5.50% notes. On June 11, 2026, the Company redeemed $300 million of 5.50% notes and paid early redemption premiums totaling $0.4 million that were recorded as interest expense on long-term debt in the Integrated Upstream and Gathering segment. On February 19, 2025, the Company issued $500 million of 5.50% notes and $500 million of 5.95% notes. On March 6, 2025, the Company redeemed $450 million of 5.20% notes and $500 million of 5.50% notes and paid early redemption premiums totaling $2.4 million that were recorded as interest expense on long-term debt in the Integrated Upstream and Gathering segment. The Company also redeemed $50 million of 7.395% notes on June 13, 2025.
Other interest expense increased $2.8 million in 2026 as compared to 2025. The increase was primarily due to financing costs incurred associated with the Company's acquisition of CenterPoint Ohio.
-47-
CAPITAL RESOURCES AND LIQUIDITY
The primary sources and uses of cash during the last two years are summarized in the following condensed statement of cash flows:
Year Ended September 30
2026 2025
(Millions)
Provided by Operating Activities $ 1,272.1 $ 1,100.0
Capital Expenditures (1,090.8) (912.8)
Sale of Fixed Income Mutual Fund Shares in Grantor Trust - 7.0
Other Investing Activities 17.3 14.1
Net Change in Short-Term Notes Payable to Banks and Commercial Paper 229.8 59.5
Net Proceeds from Issuance of Long-Term Debt 1,480.5 988.7
Shares Repurchased Under Repurchase Plan - (54.4)
Reduction of Long-Term Debt (601.2) (1,004.1)
Net Repurchases of Common Stock Under Stock and Benefit Plans (6.8) (4.7)
Net Proceeds from Common Stock Sale 338.4 -
Dividends Paid on Common Stock (202.8) (188.4)
Net Increase in Cash, Cash Equivalents, and Restricted Cash $ 1,436.5 $ 4.9
The Company expects to have adequate amounts of cash available to meet both its short-term and long-term cash requirements for at least the next twelve months and for the foreseeable future thereafter. During 2027, based on current forward commodity prices, cash provided by operating activities is expected to exceed capital expenditures. These cash flow projections include the impact of the CenterPoint Ohio acquisition but not the impact of other acquisitions or divestitures that may arise in the future.
OPERATING CASH FLOW
Internally generated cash from operating activities consists of net income available for common stock, adjusted for non-cash expenses, non-cash income, gains and losses associated with investing and financing activities, and changes in operating assets and liabilities. Non-cash items include depreciation, depletion and amortization, impairment of assets, deferred income taxes and stock-based compensation.
Cash provided by operating activities in the Utility and Pipeline and Storage segments may vary substantially from year to year because of the impact of rate cases. In the Utility segment, supplier refunds, over- or under-recovered purchased gas costs, weather and regulatory lag may also significantly impact cash flow. The impact of weather on cash flow is tempered in the Pipeline and Storage segment by the straight fixed-variable rate design used by Supply Corporation and Empire. The weather impact on cash flow in the Utility segment is mitigated by a WNA in both its New York and Pennsylvania rate jurisdictions. Refer also to Item 8 at Note A - Summary of Significant Accounting Policies (Regulatory Mechanisms) for additional discussion.
Cash provided by operating activities in the Integrated Upstream and Gathering segment may vary from year to year as a result of changes in the commodity prices of natural gas as well as changes in production. The Company uses various derivative financial instruments, including price swap agreements and no cost collars, in an attempt to manage this energy commodity price risk. The pricing protection obtained from derivative financial instruments will fluctuate over time as instruments expire and are replaced with new instruments reflecting current commodity prices of natural gas.
The Company, in its Utility segment and Integrated Upstream and Gathering segment, has entered into contractual commitments in the ordinary course of business, including commitments to purchase gas, transportation, and storage service to meet customer gas supply needs. Refer to Item 8 at Note L - Commitments and Contingencies under the heading "Other" for additional discussion concerning these contractual commitments as well as the amounts of future gas purchase, transportation and storage contract commitments expected to be incurred during the next five years and thereafter. Also refer to Item 8 at Note D
-48-
- Leases for a discussion of the Company's operating lease arrangements and a schedule of lease payments during the next five years and thereafter.
Net cash provided by operating activities totaled $1,272.1 million in 2026, an increase of $172.1 million compared with the $1,100.0 million provided by operating activities in 2025. The increase in cash provided by operating activities primarily reflects higher cash provided by operating activities in the Integrated Upstream and Gathering segment. The increase in the Integrated Upstream and Gathering segment is primarily due to higher natural gas prices combined with the timing of cash receipts and hedge settlements associated with that production.
INVESTING CASH FLOW
Expenditures for Long-Lived Assets
The Company's expenditures for long-lived assets, including non-cash capital expenditures, totaled $1,091.0 million and $918.1 million in 2026 and 2025, respectively. The table below presents these expenditures:
Year Ended September 30
2026 2025
(Millions)
Integrated Upstream and Gathering:
Capital Expenditures $ 628.9 (1) $ 605.4 (2)
Pipeline and Storage:
Capital Expenditures 271.9 (1) 121.8 (2)
Utility:
Capital Expenditures 178.5 (1) 190.0 (2)
All Other and Corporate:
Capital Expenditures 12.2 (1)(3) 0.9
Eliminations (0.5) -
Total Expenditures $ 1,091.0 $ 918.1
(1)2026 capital expenditures for the Integrated Upstream and Gathering segment, the Pipeline and Storage segment, Utility segment and All Other and Corporate category include $72.2 million, $32.2 million, $15.9 million, and $5.1 million, respectively, of non-cash capital expenditures.
(2)2025 capital expenditures for the Integrated Upstream and Gathering segment, the Pipeline and Storage segment and the Utility segment include $87.9 million, $19.4 million and $18.0 million, respectively, of non-cash capital expenditures.
(3)2026 capital expenditures for the All Other and Corporate category include $11.3 million of capitalized software costs related to the CenterPoint Ohio acquisition.
Integrated Upstream and Gathering
In 2026, the Integrated Upstream and Gathering segment capital expenditures were primarily upstream well drilling and completion expenditures in the Appalachian region, including $407.9 million spent in the Utica Shale area and $88.5 million spent in the Marcellus Shale area. These amounts included approximately $376.4 million spent to develop proved undeveloped reserves. Integrated Upstream and Gathering segment capital expenditures also included expenditures for this segment's discretionary land acquisition program to further expand its core position in Tioga County, Pennsylvania, as well as expenditures related to the continued expansion of Midstream Company's Trout Run and Tioga gathering systems. These gathering system expenditures were largely attributable to the installation of new in-field gathering pipelines related to bringing new development online, as well as the continued development of centralized station facilities, including increased dehydration capacity and compression horsepower.
In 2025, the Integrated Upstream and Gathering segment capital expenditures were primarily upstream well drilling and completion expenditures in the Appalachian region, including $351.2 million spent in the Utica
-49-
Shale area and $141.8 million spent in the Marcellus Shale area. These amounts included approximately $246.3 million spent to develop proved undeveloped reserves. Integrated Upstream and Gathering segment capital expenditures also included expenditures related to the continued expansion of Midstream Company's Tioga, Clermont and Trout Run gathering systems. These expenditures were largely attributable to the installation of new in-field gathering pipelines related to bringing new development online and system optimization, as well as the continued development of centralized station facilities, including increased dehydration capacity and compression horsepower.
Pipeline and Storage
The Pipeline and Storage segment's capital expenditures for 2026 and 2025 were primarily for additions, improvements and replacements to this segment's transmission and gas storage systems, which included system modernization expenditures that enhance the reliability and safety of the systems and reduce emissions. In addition, the Pipeline and Storage segment capital expenditures for the year ended September 30, 2026 included expenditures related to Supply Corporation's Tioga Pathway Project ($88.0 million) and Shippingport Lateral Project ($42.2 million), both of which are discussed below.
Utility
The majority of the Utility segment's capital expenditures for 2026 and 2025 were made for main and service line improvements and replacements that enhance the reliability and safety of the system and reduce emissions. Expenditures were also made for main extensions.
Other Investing Activities
In September 2025, the Company sold $7.0 million of fixed income mutual fund shares held in a grantor trust that was established for the benefit of Pennsylvania ratepayers. The proceeds were used in the Utility segment's Pennsylvania service territory to fund the final installment of a 5-year pass back of overcollected OPEB expenses, as well as to diversify a portion of grantor trust investments into lower risk money market mutual fund shares.
Estimated Capital Expenditures
The Company's estimated capital expenditures for the next three years are:
Year Ended September 30
2027 2028 2029
(Millions)
Integrated Upstream and Gathering(1) $ 650 $ 610 $ 600
Pipeline and Storage 160 180 130
Utility(2) 375 370 420
All Other - - -
$ 1,185 $ 1,160 $ 1,150
(1)Includes estimated expenditures for the years ended September 30, 2027, 2028 and 2029 of approximately $342 million, $320 million and $139 million, respectively, to develop proved undeveloped reserves. The Company is committed to developing its proved undeveloped reserves within five years as required by the SEC's final rule on Modernization of Oil and Gas Reporting. Estimated expenditures for 2027 also include approximately $30 million associated with the Integrated Upstream and Gathering segment's discretionary land acquisition program to further expand its core position in Tioga County, Pennsylvania.
(2)Includes estimated expenditures for the years ended September 30, 2027, 2028, and 2029 of approximately $300 million, $320 million and $370 million, respectively, for system modernization and safety to enhance the reliability and safety of the system and reduce emissions.
Integrated Upstream and Gathering
Capital expenditures for the Integrated Upstream and Gathering segment in 2027 through 2029 are expected to be primarily upstream well drilling and completion expenditures, combined with related infrastructure, in the Appalachian region, as well as additional pipeline, dehydration and compression
-50-
infrastructure related to gathering systems. The Integrated Upstream and Gathering segment will remain part of the Company's consolidated financial results until completion of the planned separation as discussed in Part II, Item 8 at Note B - Acquisitions and Divestitures.
Pipeline and Storage
Capital expenditures for the Pipeline and Storage segment in 2027 through 2029 are expected to include the replacement and modernization of transmission and storage facilities, the reconditioning of storage wells, improvements to compressor stations and emissions reduction initiatives, as well as capital expenditures related to system expansion.
In addition, due to the continuing demand for pipeline capacity to move natural gas from new wells being drilled in Appalachia, specifically in the Marcellus and Utica Shale producing areas, Supply Corporation and Empire have completed and continue to pursue expansion projects designed to move anticipated Marcellus and Utica production gas to other interstate pipelines, on-system markets, and markets beyond the Supply Corporation and Empire pipeline systems, including projects to support regional demand for power generation to support the electric grid and data center development, and storage enhancements. Expansion and modernization projects where the Company has forecasted a significant amount of investment in preliminary survey and investigation costs and/or capital expenditures, and where a precedent agreement has been executed, are discussed below.
Supply Corporation designed a project ("Tioga Pathway Project") that would allow for the transportation of 190,000 Dth per day of shale gas supplies from a new interconnection in northwest Tioga County, Pennsylvania to an existing Supply Corporation interconnection with Tennessee Gas Pipeline Company, LLC at Ellisburg and a new virtual delivery point into an existing Transcontinental Gas Pipe Line Company, LLC ("Transco") capacity lease, providing access to Mid-Atlantic markets. The Tioga Pathway Project involved the construction of approximately 19 miles of new pipeline and the replacement of approximately four miles of existing pipeline on the Supply Corporation system. Supply Corporation executed a Precedent Agreement with Seneca for 190,000 Dth per day of transportation capacity and filed a Section 7(b)/7(c) application with the FERC on August 21, 2024. FERC issued the Section 7(b)/7(c) certificate on May 5, 2025 and on January 8, 2026, FERC issued the Notice to Proceed with Construction. The estimated capital cost of the project is approximately $100 million. The project was placed in service on November 1, 2026. As of September 30, 2026, approximately $93.0 million has been capitalized as Construction Work in Progress for this project. The project was placed in service on November 1, 2026. The remaining expenditures expected to be spent on the project are included in Pipeline and Storage estimated capital expenditures in the table above.
Additionally, Supply Corporation concluded an open season on February 26, 2025, and based on interest in that open season, designed a project (the "Shippingport Lateral Project") that would allow for the transportation of 205,000 Dth per day of natural gas supplies from its existing Line N pipeline system to a new interconnection with the Shippingport Power Station, a natural gas power generation facility under development in Beaver County, Pennsylvania, which will support a co-located data center that is currently under development. In order to provide this new natural gas transportation capacity, Supply Corporation constructed an approximately 7.5 mile pipeline lateral from its existing Line N pipeline system to a direct interconnection with the facility. The project has an estimated capital cost of approximately $57 million. Supply Corporation executed a Precedent Agreement with a developer for 100% of the capacity for the Shippingport Lateral Project and filed an application with FERC under the Commission's prior notice regulations on August 29, 2025. The project obtained FERC authorization on November 7, 2025 and was placed in service on November 1, 2026. As of September 30, 2026, approximately $42.3 million has been capitalized as Construction Work in Progress for this project. The remaining expenditures expected to be spent on the project are included in Pipeline and Storage estimated capital expenditures in the table above.
Supply Corporation has also developed its Line N System Upgrade Project, which will consist of modernization of primarily 1960's era pipeline in Beaver County, Pennsylvania, as well as minor compressor station and facility upgrades, to create approximately 294,000 Dth per day of additional natural gas transportation capacity (1) from a new interconnection on the southern portion of Supply Corporation's Line N system in Greene County, Pennsylvania to an existing Supply Corporation interconnection with Tennessee Gas
-51-
Pipeline Company, LLC at Mercer and (2) from an existing Supply Corporation interconnection with Texas Eastern Transmission, LP at Holbrook to a new interconnection at the Shippingport Industrial Park in Shippingport, Pennsylvania. Supply Corporation executed long-term precedent agreements with two shippers for 100% of the incremental capacity created by the project. The project has a projected in-service date of November 2028 and an estimated capital cost of approximately $100 million. The majority of these expenditures are included as Pipeline and Storage segment estimated capital expenditures in the table above. As of September 30, 2026, $1.3 million has been spent to study this project, all of which has been included in Deferred Charges on the Consolidated Balance Sheet at September 30, 2026.
Utility
Capital expenditures for the Utility segment in 2027 through 2029, which include capital expenditures associated with the Company's acquisition of Distribution Ohio, are expected to be concentrated in the areas of main and service line improvements and replacements that will enhance the reliability and safety of the system, emission reduction initiatives and, to a lesser extent, the purchase of new equipment.
Project Funding
During fiscal 2026 and 2025, the Company has financed capital expenditures with cash from operations and long-term debt. Going forward, the Company expects to use cash from operations and short-term or long-term borrowings, as needed, to finance capital expenditures. The level of borrowings will depend upon the amount of cash provided by operations, which, in turn, will likely be most impacted by natural gas production and the associated commodity price realizations in the Integrated Upstream and Gathering segment. It will also likely depend on the timing of gas cost and base rate recovery in the Utility segment as well as the timing of base rate recovery in the Pipeline and Storage segment.
In the Integrated Upstream and Gathering segment, the Company has entered into contractual obligations to support its development activities and operations in Pennsylvania, including hydraulic fracturing and other well completion services, well tending services, well workover activities, tubing and casing purchases, production equipment purchases, water hauling services and contracts for drilling rig services. Refer to Item 8 at Note L - Commitments and Contingencies under the heading "Other" for the amounts of contractual obligations expected to be incurred during the next five years and thereafter to support the Company's exploration and development activities. These amounts are largely a subset of the estimated capital expenditures for the Integrated Upstream and Gathering segment shown above.
The Company, in its Pipeline and Storage segment, Integrated Upstream and Gathering segment and Utility segment, has entered into several contractual commitments associated with various pipeline, compressor and gathering system modernization and expansion projects. Refer to Item 8 at Note L - Commitments and Contingencies under the heading "Other" for the amounts of contractual commitments expected to be incurred during the next five years and thereafter associated with the Company's pipeline, compressor and gathering system modernization and expansion projects. These amounts are a subset of the estimated capital expenditures for the Pipeline and Storage segment, Integrated Upstream and Gathering segment and Utility segment that are shown above.
The Company continuously evaluates capital expenditures and potential investments in corporations, partnerships, and other business entities. The amounts are subject to modification for opportunities such as the acquisition of attractive natural gas properties, accelerated development of existing natural gas properties, natural gas storage and transmission facilities, natural gas generation facilities, natural gas gathering and compression facilities and the expansion of natural gas transmission line capacities, regulated utility assets and other opportunities as they may arise. The amounts are also subject to modification for opportunities involving emission reductions and/or energy transition including investments directly related to low- and no-carbon fuels. While the majority of capital expenditures in the Utility and Pipeline and Storage segments are necessitated by the continued need for replacement and upgrading of mains and service lines, the magnitude of future capital expenditures or other investments in the Company's business segments depends, to a large degree, upon market and regulatory conditions as well as legislative actions.
-52-
FINANCING CASH FLOW
Consolidated short-term debt increased $229.8 million, to a total of $380.0 million, when comparing the balance sheet at September 30, 2026 to the balance sheet at September 30, 2025. The maximum amount of short-term debt outstanding during the year ended September 30, 2026 was $380.0 million. In addition to cash provided by operating activities, the Company considers short-term debt (consisting of short-term notes payable to banks and commercial paper) an important source of cash for temporarily financing items such as capital expenditures, acquisitions, gas-in-storage inventory, unrecovered purchased gas costs, margin calls on derivative financial instruments, other working capital needs and repayment of long-term debt. Fluctuations in these items can have a significant impact on the amount and timing of short-term debt. As of September 30, 2026, the Company had outstanding commercial paper of $380.0 million and did not have any outstanding short-term notes payable to banks.
On October 20, 2025, the Company entered into a Securities Purchase Agreement (the "Purchase Agreement") with the Seller, pursuant to which, among other things, the Company agreed to acquire from the Seller all of the issued and outstanding equity interests of CenterPoint Ohio, the Seller's Ohio natural gas local distribution company, for an aggregate purchase price of $2.62 billion, subject to customary adjustments, as provided in the Purchase Agreement (the "Transaction"). On October 1, 2026, the Transaction was completed and the Company acquired all the issued and outstanding equity interests of CenterPoint Ohio from the Seller for an aggregate purchase price at closing of $2.64 billion. The purchase price at closing reflects an estimated amount for a net working capital adjustment through the closing date, and was paid through a combination of cash and a promissory note that was issued by the Company to the Seller at closing pursuant to a Seller Note Agreement (the "Seller Note Agreement") between the Company, as borrower, and the Seller, as lender. The Seller Note Agreement, which was part of the Seller's desired transaction structure and was incorporated into the Company's business valuation, provides a $1.2 billion unsecured term loan credit facility (the "Seller Note Facility") that matures on September 30, 2027.
The borrowings under the Seller Note Facility bear interest at a rate of 6.5% per annum. The Seller Note Agreement contains customary representations and affirmative, negative and financial covenants, consistent with the Company's February 2024 term loan agreement discussed below. The Seller Note Agreement also includes covenants restricting certain actions with respect to Distribution Ohio. The Seller Note Agreement contains certain specified events of default, and should an event of default occur, the lender is entitled to exercise certain remedies, including acceleration of the loan and related obligations.
The Seller Note Agreement contains a covenant defeasance provision that permits the Company to relieve itself from its obligations to comply with covenants under the Seller Note Agreement upon deposit of an amount with a paying agent sufficient to pay the principal of and interest due on the loan on each applicable interest payment date and the maturity date.
In connection with its entry into the Purchase Agreement, the Company entered into a bridge facility commitment letter (the "Bridge Commitment Letter"), pursuant to which The Toronto-Dominion Bank, New York Branch ("TD Bank") and Wells Fargo Bank, National Association ("Wells Fargo Bank" and, together with TD Bank, the "Commitment Parties"), agreed to provide to the Company loans under a senior unsecured bridge loan facility (the "Bridge Facility") composed of a $1.42 billion 364-day tranche (the "Acquisition Tranche"), the proceeds of which would have been used, if needed, to finance the Transaction, and a $1.2 billion 364-day tranche (the "Seller Note Tranche"), the proceeds of which will be used, if needed, to refinance a portion of the Seller Note Facility at its scheduled maturity.
On November 6, 2025, the Company entered into a 364-day term loan facility commitment letter (the "Term Loan Commitment Letter"), pursuant to which the Commitment Parties and ten additional banks, all of which are lenders under our primary credit facility, agreed to provide to the Company loans under a 364-day senior unsecured term loan facility (the "Term Loan Facility") in the amount of $1.42 billion, the proceeds of which would have been used, if needed, to finance the Transaction. Entering into the Term Loan Commitment Letter enabled the Company to terminate the commitments under the Bridge Commitment Letter in respect of the Acquisition Tranche. Also on November 6, 2025, the same ten additional banks joined the Commitment Parties as parties to the Bridge Commitment Letter in respect of the Seller Note Tranche.
-53-
On December 17, 2025, the Company completed the issuance and sale, in a private placement, of 4,402,513 shares of the Company's common stock, par value $1.00 per share, at a price of $79.50 per share. After deducting placement fees, the net proceeds to the Company amounted to $338.4 million.
On June 10, 2026, the Company issued $500.0 million of 4.75% notes due May 15, 2029, $500.0 million of 5.05% notes due October 15, 2031 and $500.0 million of 5.50% notes due May 15, 2036. After deducting underwriting discounts, commissions and other debt issuance costs, the net proceeds to the Company amounted to $495.4 million, $494.0 million and $491.1 million, respectively. The holders of the notes may require the Company to repurchase their notes at a price equal to 101% of the principal amount in the event of both a change in control and a ratings downgrade to a rating below investment grade. Additionally, the interest rate payable on the notes will be subject to adjustment from time to time, with a maximum adjustment of 2.00%, such that the coupon will not exceed 6.75% on the 4.75% notes, 7.05% on the 5.05% notes and 7.50% on the 5.50% notes, if certain change of control events involving a material subsidiary result in a downgrade of the credit rating assigned to the notes to a rating below investment grade. A downgrade with a resulting increase to the coupon does not preclude the coupon from returning to its original rate if the Company's credit rating is subsequently upgraded. A portion of the net proceeds of these debt issuances was used for general corporate purposes, including the June 11, 2026 redemption of $300.0 million of the Company's 5.50% notes that were scheduled to mature in October 2026. The Company redeemed those notes for $301.2 million, plus accrued interest. The Company invested the remaining net proceeds from these debt issuances in temporary cash investments and used that cash to fund a substantial portion of the purchase price of the CenterPoint Ohio acquisition at closing.
The net proceeds of the common stock issuance and long-term debt issuances discussed above reduced the commitments under the Term Loan Facility to zero, thus terminating the Term Loan Commitment Letter. The net proceeds of the long-term debt issuances also reduced the commitments under the Seller Note Tranche of the Bridge Commitment Letter to approximately $1.10 billion. The Company expects to further reduce the commitments under the Bridge Facility, possibly to zero, through additional financings prior to the scheduled maturity of the Seller Note Facility, but there can be no assurance such financings will occur and any such expectation is subject to market conditions.
The Company is subject to certain customary fees with respect to the Bridge Facility. Interest on borrowings under the Bridge Facility would accrue at one of two rates, at the option of the Company: Term SOFR plus an applicable margin of 1.125% to 1.750%, or a base rate (at least as great as one-month Term SOFR plus 1.0%) plus an applicable margin of 0.125% to 0.750%. In each case, the applicable margin would depend on the Company's credit ratings (at current ratings, the applicable margin would be 1.500% for Term SOFR loans and 0.500% for base rate loans). The applicable margin would increase by an additional 0.25% on each of the 90th, 180th and 270th day after the funding date for any loans outstanding under the Bridge Facility. Any borrowings under the Bridge Facility would mature 364 days from the funding date, which would be on or around the scheduled maturity of the Seller Note Facility.
The availability of borrowings under the Bridge Facility is subject to the satisfaction of certain customary conditions for transactions of these types. Any definitive financing documentation for the Bridge Facility will contain customary representations and warranties, covenants and events of defaults for transactions of these types. The Company expects to execute permanent financing prior to the funding date of the Bridge Facility, such that borrowings under this facility would not be incurred. There can be no assurance, however, such permanent financing will occur and any such expectation is subject to market conditions.
On March 27, 2026, the Company entered into an Amended and Restated Credit Agreement (the "Credit Agreement") with PNC Bank, National Association, as administrative agent and lender, and 12 additional lenders. The Credit Agreement amended and restated that certain credit agreement, dated as of February 28, 2022, among the Company, JPMorgan Chase Bank, N. A., as administrative agent, and the lenders party thereto. The Credit Agreement provides a $1.3 billion unsecured committed revolving credit facility, an increase of $300 million from the prior agreement. The facility has an initial maturity date of March 27, 2031. The Company may use the proceeds of loans under the Credit Agreement (a) to repay its (i) obligations under its commercial paper program, (ii) other short term credit facilities and (iii) maturing long-term debt obligations, (b) for general corporate purposes of the Company and its subsidiaries in the ordinary course of business,
-54-
including for working capital, capital expenditure and other lawful corporate purposes and (c) to fund certain permitted acquisitions, including the CenterPoint Ohio acquisition, and other investments.
The total amount available to be issued under the Company's commercial paper program is $800 million. The commercial paper program is backed by the Credit Agreement. The Company also has two uncommitted lines of credit with financial institutions for general corporate purposes. Borrowings under these uncommitted lines of credit would be made at competitive market rates. The uncommitted credit lines are revocable at the option of the financial institution and are reviewed on an annual basis. Other financial institutions may also provide the Company with uncommitted or discretionary lines of credit in the future.
On February 14, 2024, the Company entered into a term loan agreement (the "Term Loan Agreement") with six of the 12 banks that were then lenders under the Company's prior primary revolving credit agreement. The Term Loan Agreement provided a $300.0 million unsecured committed delayed draw term loan facility with a maturity date of February 14, 2026, and the Company had the ability to select interest periods of one, three or six months for borrowings. Borrowings under the Term Loan Agreement bore interest at a rate equal to SOFR for the applicable interest period, plus an adjustment of 0.10%, plus a spread of 1.375%. On January 22, 2026, the Company repaid all outstanding obligations under the Term Loan Agreement, and the agreement was terminated.
The Credit Agreement provides that the Company's debt to capitalization ratio will not exceed 0.65 at the last day of any fiscal quarter. For purposes of calculating the debt to capitalization ratio, the Company's total capitalization will be increased by adding back 50% of the aggregate after-tax amount of non-cash charges directly arising from any ceiling test impairment occurring on or after July 1, 2018. Since that date, the Company recorded non-cash, after-tax ceiling test impairments totaling $797.0 million. As a result, at September 30, 2026, $398.5 million was added back to the Company's total capitalization for purposes of calculating the debt to capitalization ratio under the Credit Agreement. In addition, for purposes of calculating the debt to capitalization ratio, the following amounts included in Accumulated Other Comprehensive Income (Loss) on the Company's consolidated balance sheet will be excluded from the determination of comprehensive shareholders' equity: all unrealized gains or losses on commodity-related derivative financial instruments, and up to $10 million in unrealized gains or losses on other derivative financial instruments. As a result of these exclusions, such unrealized gains or losses will not positively or negatively affect the calculation of the debt to capitalization ratio. For purposes of calculating the debt to capitalization ratio, the Company's $1.2 billion obligation under the Seller Note Facility will be excluded from the definition of consolidated indebtedness upon such time and to the extent that the Company, in accordance with the Seller Note Agreement, deposits with a paying agent funds for defeasance of the Seller Note Facility.
At September 30, 2026, the Company's debt to capitalization ratio, as calculated under the Credit Agreement, was 0.48. The constraints specified in the Credit Agreement would have permitted an additional $4.0 billion in short-term and/or long-term debt to be outstanding at September 30, 2026 before the Company's debt to capitalization ratio exceeded 0.65.
A downgrade in the Company's credit ratings could increase borrowing costs, negatively impact the availability of capital from banks, commercial paper purchasers and other sources, and require the Company's subsidiaries to post letters of credit, cash or other assets as collateral with certain counterparties. If the Company is not able to maintain investment-grade credit ratings, it may not be able to access commercial paper markets. However, the Company expects that it could borrow under its credit facilities or rely upon other liquidity sources.
The Credit Agreement contains a cross-default provision whereby the failure by the Company or its significant subsidiaries to make payments under other borrowing arrangements, or the occurrence of certain events affecting those other borrowing arrangements, could trigger an obligation to repay any amounts outstanding under the Credit Agreement. In particular, a repayment obligation could be triggered if (i) the Company or any of its significant subsidiaries fails to make a payment when due of any principal or interest on any other indebtedness aggregating $125.0 million or more or (ii) an event occurs that causes, or would permit the holders of any other indebtedness aggregating $125.0 million or more to cause, such indebtedness to become due prior to its stated maturity.
-55-
On February 19, 2025, the Company issued $500.0 million of 5.50% notes due March 15, 2030 and $500.0 million of 5.95% notes due March 15, 2035. After deducting underwriting discounts, commissions and other debt issuance costs, the net proceeds to the Company amounted to $495.2 million and $493.5 million, respectively. The holders of the notes may require the Company to repurchase their notes at a price equal to 101% of the principal amount in the event of both a change in control and a ratings downgrade to a rating below investment grade. Additionally, the interest rate payable on the notes will be subject to adjustment from time to time, with a maximum adjustment of 2.00%, such that the coupon will not exceed 7.50% on the 5.50% notes and 7.95% on the 5.95% notes, if certain change of control events involving a material subsidiary result in a downgrade of the credit rating assigned to the notes to a rating below investment grade. A downgrade with a resulting increase to the coupon does not preclude the coupon from returning to its original rate if the Company's credit rating is subsequently upgraded. The proceeds of these debt issuances were used for general corporate purposes, including the March 6, 2025 redemptions of $450.0 million of the Company's 5.20% notes that were scheduled to mature in July 2025 and $500.0 million of the Company's 5.50% notes that were scheduled to mature in January 2026. The Company redeemed those notes for $450.8 million and $503.3 million, respectively, plus accrued interest. The remaining proceeds of the debt issuances were used to repay a portion of short-term borrowings the Company incurred to fund a trust for the benefit of holders of the 7.38% notes outstanding under the Company's 1974 indenture.
The Current Portion of Long-Term Debt at September 30, 2026 consisted of $300.0 million of 3.95% notes that mature in September 2027. The Current Portion of Long-Term Debt at September 30, 2025 consisted of a $300.0 million long-term delayed draw term loan with a maturity date in February 2026 that was repaid in January 2026. As of September 30, 2026, the future contractual obligations related to aggregate principal amounts of long-term debt, including interest expense, maturing during the next five years and thereafter are as follows: $474.1 million in 2027, $461.6 million in 2028, $639.5 million in 2029, $609.8 million in 2030, $588.7 million in 2031, and $1,730.9 million thereafter. Refer to Item 8 at Note H - Capitalization and Short-Term Borrowings, as well as the table under Interest Rate Risk in the Market Risk Sensitive Instruments section below, for the amounts excluding interest expense. Principal payments of long-term debt are a component of cash used in financing activities while interest payments on long-term debt are a component of cash used in operating activities. The Company's present liquidity position is believed to be adequate to satisfy known demands.
The Company's embedded cost of long-term debt was 4.89% at September 30, 2026 and 4.90% at September 30, 2025. Refer to "Interest Rate Risk" in this Item for a more detailed breakdown of the Company's embedded cost of long-term debt.
OTHER MATTERS
In addition to the environmental and other matters discussed in this Item 7 and in Item 8 at Note L - Commitments and Contingencies, the Company is involved in other litigation and regulatory matters arising in the normal course of business. These other matters may include, for example, negligence claims and tax, regulatory or other governmental audits, inspections, investigations or other proceedings. These matters may involve state and federal taxes, safety, compliance with regulations, rate base, cost of service and purchased gas cost issues, among other things. While these normal-course matters could have a material effect on earnings and cash flows in the period in which they are resolved, they are not expected to change materially the Company's present liquidity position, nor are they expected to have a material adverse effect on the financial condition of the Company.
The Company has a tax-qualified, noncontributory defined-benefit retirement plan (Retirement Plan). During 2026, the Company did not make any contributions to the Retirement Plan. The Company does not expect to make any contributions to the Retirement Plan in 2027. For further discussion of the Company's Retirement Plan, including actuarial assumptions, refer to Item 8 at Note K - Retirement Plan and Other Post-Retirement Benefits. As noted in that footnote, the Retirement Plan has been closed to new participants since 2003. In that regard, the average remaining service life of active participants in the Retirement Plan is approximately 5 years.
-56-
The Company provides health care and life insurance benefits (other post-retirement benefits) for a majority of its retired employees. The Company has established VEBA trusts and 401(h) accounts for its other post-retirement benefits. The Company did not make any contributions to its VEBA trusts or 401(h) accounts in 2026, and does not anticipate making contributions to these accounts in 2027. The Company made direct payments of $0.5 million to retirees not covered by the VEBA trusts and 401(h) accounts during 2026. For further discussion of the Company's other post-retirement benefits, including actuarial assumptions, refer to Item 8 at Note K - Retirement Plan and Other Post-Retirement Benefits. As noted in that footnote, the other post-retirement benefits provided by the Company have been closed to new participants since 2003. In that regard, the average remaining service life of active participants is approximately 4 years for those eligible for other post-retirement benefits.
The Company has made certain guarantees on behalf of its subsidiaries. The guarantees relate primarily to: (i) obligations under derivative financial instruments, which are included on the Consolidated Balance Sheets in accordance with the authoritative guidance (see Item 8 at Note J - Financial Instruments); and (ii) other obligations which are reflected on the Consolidated Balance Sheets. The Company believes that the likelihood it would be required to make payments under the guarantees is remote.
MARKET RISK SENSITIVE INSTRUMENTS
Energy Commodity Price Risk
The Company uses various derivative financial instruments (derivatives), including price swap agreements and no cost collars, as part of the Company's overall energy commodity price risk management strategy in its Integrated Upstream and Gathering segment. Under this strategy, the Company manages a portion of the market risk associated with fluctuations in the price of natural gas, thereby attempting to provide more stability to operating results. The Company has operating procedures in place that are administered by experienced management to monitor compliance with the Company's risk management policies. The derivatives are not held for trading purposes. The fair value of these derivatives, as shown below, represents the amount that the Company would receive from, or pay to, the respective counterparties at September 30, 2026 to terminate the derivatives. However, the tables below and the fair value that is disclosed do not consider the physical side of the natural gas transactions that are related to the financial instruments.
Rules adopted by the CFTC and other regulators could adversely impact the Company. While many of those rules place specific conditions on the operations of swap dealers rather than directly on the Company, concern remains that swap dealers with whom the Company may transact will pass along their increased costs stemming from final rules through higher transaction costs and prices or other direct or indirect costs. Some of those rules also may apply directly to the Company and adversely impact its ability to trade swaps and over-the-counter derivatives, whether due to increased costs, limitations on trading capacity or for other reasons. Additionally, given the enforcement authority granted to the CFTC on anti-market manipulation, anti-fraud and anti-disruptive trading practices, it is difficult to predict how the evolving enforcement priorities of the CFTC will impact our business. Should the Company violate any laws or regulations applicable to our hedging activities, it could be subject to CFTC enforcement action and material penalties and sanctions.
The authoritative guidance for fair value measurements and disclosures requires consideration of the impact of nonperformance risk (including credit risk) from a market participant perspective in the measurement of the fair value of assets and liabilities. At September 30, 2026, the Company determined that nonperformance risk associated with its natural gas price swap agreements, natural gas no cost collars and foreign currency contracts would have no material impact on its financial position or results of operation. To assess nonperformance risk, the Company considered information such as any applicable collateral posted, master netting arrangements, and applied a market-based method by using the counterparty's (assuming the derivative is in a gain position) or the Company's (assuming the derivative is in a loss position) credit default swaps rates.
The following tables disclose natural gas price swap information by expected maturity dates for agreements in which the Company receives a fixed price in exchange for paying a variable price as quoted in various national natural gas publications or on the NYMEX. Notional amounts (quantities) are used to calculate the contractual payments to be exchanged under the contract. The weighted average variable prices represent
-57-
the weighted average settlement prices by expected maturity date as of September 30, 2026. At September 30, 2026, the Company had not entered into any natural gas price swap agreements extending beyond 2029.
Natural Gas Price Swap Agreements
Expected Maturity Dates
2027 2028 2029 Total
Notional Quantities (Equivalent Bcf) 123.6 65.7 8.9 198.2
Weighted Average Fixed Rate (per Mcf) $ 4.04 $ 3.88 $ 3.72 $ 3.97
Weighted Average Variable Rate (per Mcf) $ 3.18 $ 3.76 $ 4.00 $ 3.41
At September 30, 2026, the Company would have received an aggregate of approximately $111.5 million to terminate the natural gas price swap agreements outstanding at that date.
At September 30, 2025, the Company would have received an aggregate of approximately $28.0 million to terminate the natural gas price swap agreements outstanding at that date.
No Cost Collars
The following table discloses the notional quantities, the weighted average ceiling price and the weighted average floor price for the no cost collars used by the Company to manage natural gas price risk. The no cost collars provide for the Company to receive monthly payments from (or make payments to) other parties when a variable price falls below an established floor price (the Company receives payment from the counterparty) or exceeds an established ceiling price (the Company pays the counterparty). At September 30, 2026, the Company had not entered into any natural gas no cost collars extending beyond 2029.
Expected Maturity Dates
2027 2028 2029 Total
Natural Gas
Notional Quantities (Equivalent Bcf) 61.3 26.2 4.5 92.0
Weighted Average Ceiling Price (per Mcf) $ 4.69 $ 4.56 $ 4.11 $ 4.62
Weighted Average Floor Price (per Mcf) $ 3.66 $ 3.62 $ 3.39 $ 3.64
At September 30, 2026, the Company would have received an aggregate of approximately $34.6 million to terminate the natural gas no cost collars outstanding at that date.
At September 30, 2025, the Company would have received an aggregate of approximately $6.1 million to terminate the natural gas no cost collars outstanding at that date.
Foreign Exchange Risk
The Company uses foreign exchange forward contracts to manage the risk of currency fluctuations associated with transportation costs denominated in Canadian currency in the Integrated Upstream and Gathering segment. All of these transactions are forecasted.
The following table discloses foreign exchange contract information by expected maturity dates. The Company receives a fixed price in exchange for paying a variable price as noted in the Canadian to U.S. dollar forward exchange rates. Notional amounts (Canadian dollars) are used to calculate the contractual payments to be exchanged under contract. The weighted average variable prices represent the weighted average settlement prices by expected maturity date as of September 30, 2026. At September 30, 2026, the Company had not entered into any foreign currency exchange contracts extending beyond 2030.
Expected Maturity Dates
2027 2028 2029 2030 Total
Notional Quantities (Canadian Dollar in millions)
$ 9.8 $ 8.7 $ 8.6 $ 6.5 $ 33.6
Weighted Average Fixed Rate ($Cdn/$US) $ 1.34 $ 1.32 $ 1.32 $ 1.31 $ 1.32
Weighted Average Variable Rate ($Cdn/$US) $ 1.37 $ 1.36 $ 1.34 $ 1.33 $ 1.35
At September 30, 2026, absent other positions with the same counterparties, the Company would have paid to its respective counterparties an aggregate of $1.0 million to terminate these foreign exchange contracts.
-58-
Refer to Item 8 at Note J - Financial Instruments for a discussion of the Company's exposure to credit risk related to its derivative financial instruments.
Interest Rate Risk
The fair value of long-term debt is $3.5 billion at September 30, 2026. This fair value amount is not intended to reflect principal amounts that the Company will ultimately be required to pay. The following table presents the principal cash repayments and related weighted average interest rates by expected maturity date for the Company's long-term fixed rate debt:
Principal Amounts by Expected Maturity Dates
2027 2028 2029 2030 2031 Thereafter Total
(Dollars in millions)
Long-Term Fixed Rate Debt $ 300.0 $ 300.0 $ 500.0 $ 500.0 $ 500.0 $ 1,500.0 $ 3,600.0
Weighted Average Interest Rate Paid
4.0% 4.8% 4.8% 5.5% 3.0% 5.5% 4.9%
RATE MATTERS
Utility Operation
Delivery rates for both the New York and Pennsylvania divisions are regulated by the states' respective public utility commissions and typically are changed only when approved through a procedure known as a "rate case." In both jurisdictions, delivery rates do not reflect the recovery of purchased gas costs. Prudently-incurred gas costs are recovered through operation of automatic adjustment clauses, and are collected primarily through a separately-stated "supply charge" on the customer bill.
New York Jurisdiction
Distribution Corporation's current delivery rates in its New York jurisdiction were approved by the NYPSC in an order issued on December 19, 2024 with rates effective January 1, 2025 ("2024 Rate Order"). The 2024 Rate Order authorizes a three-year rate plan effective October 1, 2024, with a make-whole provision allowing full recovery of revenues that would have been billed at the new rates between October 1, 2024 and December 31, 2024. It also reflects a return on equity of 9.7% and authorized a revenue requirement increase of $57.3 million in fiscal 2025, an additional revenue requirement increase of $15.8 million in fiscal 2026, and an additional revenue requirement increase of $12.7 million in fiscal 2027. These revenue requirement increases are being reflected in customer bills on a levelized basis over the three-year rate plan. The revenue requirement for each year of the three-year plan has been reduced by $14 million for actuarial projections of income that is expected to be recognized for qualified pension and other post-retirement benefits. Qualified pension and other post-retirement benefit income or costs are matched with amounts included in revenue resulting in zero impact to earnings. The 2024 Rate Order approves the continuation of several ratemaking mechanisms, including revenue decoupling and WNA, and establishes a number of new cost trackers and regulatory deferrals. It also includes an earnings sharing mechanism, gas safety and customer service performance metrics (including maintaining the Company's leak prone pipe replacement program), and provisions that will facilitate achievement of the emissions reduction goals of the CLCPA.
On May 5, 2026, Distribution Corporation filed a petition with the NYPSC for, among other things, authorization to implement a system modernization tracker reconciliation mechanism through which qualified leak prone pipe removal costs incurred by the Company would be tracked and recovered. On August 17, 2026, the Commission issued an order authorizing Distribution Corporation to implement a system modernization tracker reconciliation mechanism commencing on October 1, 2027 that will remain in effect until the Commission next sets new base rates for Distribution Corporation or September 30, 2029, whichever comes first.
Pennsylvania Jurisdiction
Distribution Corporation's current delivery rates in its Pennsylvania jurisdiction were approved by the PaPUC in an order issued on October 22, 2026 ("2026 Rate Order"). Prior to the 2026 Rate Order, delivery
-59-
rates in Pennsylvania had been effective since August 1, 2023, as approved by the PaPUC in an order issued on June 15, 2023 ("2023 Rate Order").
On January 28, 2026, Distribution Corporation made a filing with the PaPUC seeking, among other things, an increase in its annual base rate operating revenues. On October 22, 2026, the PaPUC issued the 2026 Rate Order authorizing an annual revenue increase of approximately $10.4 million and reflecting a return on equity of 9.86%. The 2026 Rate Order authorizes continuation of the Company's weather normalization adjustment mechanism as a pilot until a final order is entered in the Company's next base rate case, modified to use a 10-year weather history and a 5% deadband such that the adjustment will apply only if the actual heating degree days for the billing cycle are lower than 95% or higher than 105% of the weather-normalized heating degree days for the billing cycle. It also approves a five-year residential energy efficiency pilot and associated cost-recovery rider, subject to annual reporting requirements. The 2026 Rate Order further approves the return of approximately $7.2 million of remaining OPEB surcredit funds to customers, including a one-time $30 bill credit to eligible low-income customers in December 2026. In accordance with PaPUC regulations, Distribution Corporation filed a supplement to its Pennsylvania gas tariff in compliance with the 2026 Rate Order ("Compliance Filing"). The Compliance Filing was approved by the PaPUC and rates were implemented by Distribution Corporation on November 9, 2026.
On April 10, 2024, Distribution Corporation filed with the PaPUC a petition for approval of a distribution system improvement charge ("DSIC") to recover, between base rate cases, capital expenses related to eligible property constructed or installed to rehabilitate, improve and replace portions of the Company's natural gas distribution system. The DSIC petition was approved by the PaPUC on December 5, 2024 with a cap equivalent to 5% of distribution revenues, and on January 1, 2025, the Company initiated recovery of eligible costs on incremental rate base added after September 30, 2024. Effective April 1, 2026, the revenue cap was met and subsequent customer recoveries under the DSIC were limited to the 5% threshold, or approximately $7.0 million per year. In accordance with the 2026 Rate Order, the DSIC was reset to zero on November 1, 2026. Rate base investments and eligible costs previously collected through the DSIC prior to the reset are now being recovered in base delivery rates approved in the 2026 Rate Order as discussed below. The Company anticipates that it can resume the collection of DSIC revenues to recover eligible costs relating to incremental rate base added after October 31, 2027.
Pipeline and Storage
Supply Corporation filed an NGA Section 4 rate case at FERC on April 30, 2026 proposing rate increases to be effective November 1, 2026. Supply Corporation's filing requests an annual cost of service of approximately $404 million, an increase of approximately $95 million from Supply Corporation's settlement of its 2023 rate proceeding. The proposal also includes, among other things, a modernization cost recovery mechanism. New rates went into effect on November 1, 2026, subject to refund.
On March 17, 2025, FERC approved an amendment to Empire's 2019 rate case settlement, which provides for a modest reduction in Empire's transportation unit rates, effective November 1, 2025. This settlement amendment is estimated to decrease Empire's revenues on a yearly basis by approximately $0.5 million. Empire will not be able to file a new Section 4 rate case before April 30, 2027 and is required to file a Section 4 rate case by May 31, 2031.
ENVIRONMENTAL MATTERS
The Company is subject to various federal, state and local laws and regulations relating to the protection of the environment. The Company has established procedures for the ongoing evaluation of its operations to identify potential environmental exposures and comply with regulatory requirements. In 2021, the Company set methane intensity reduction targets at each of its businesses, an absolute greenhouse gas emissions reduction target for the consolidated Company, and greenhouse gas reduction targets associated with the Company's utility delivery system. In 2022, the Company began measuring progress against these reduction targets. In 2026, the Company updated its methane intensity calculations to reflect revisions to Subpart W of the EPA's Greenhouse Gas Reporting Program. Considering these federal regulatory reporting updates, as well as continued growth across the Company's operations, the Company decided to discontinue its consolidated absolute greenhouse gas emissions reduction target. The Company's ability to estimate accurately the time,
-60-
costs and resources necessary to meet methane intensity emissions targets may be impacted as environmental exposures, technology and opportunities change and regulatory and policy updates are issued.
For further discussion of the Company's environmental exposures, refer to Item 8 at Note L - Commitments and Contingencies under the heading "Environmental Matters."
The effect (material or not) on the Company of any new legislative or regulatory measures will depend on the particular provisions that are ultimately adopted.
Environmental Regulation
While the current federal administration has initiated efforts to roll-back and/or limit certain environmental initiatives, legislative and regulatory measures concerning climate change and greenhouse gas emissions are in various phases of discussion or implementation in the United States. These efforts include legislation, legislative proposals and new regulations at the state and federal level, and private party litigation related to greenhouse gas emissions. Legislation or regulation that aims to reduce greenhouse gas emissions could also include emissions limits, reporting requirements, carbon taxes, cap-and-invest and cap-and-trade programs, restrictive permitting, increased efficiency standards, and incentives or mandates to conserve energy or use renewable energy sources.
Additionally, a number of states have adopted energy strategies or plans with aggressive goals for the reduction of greenhouse gas emissions. Pennsylvania has a methane reduction framework with the stated goal of reducing methane emissions from well sites, compressor stations and pipelines. In New York, the CLCPA, which was passed in 2019, mandates reducing statewide greenhouse gas emissions by 40% from 1990 levels by 2030, and by 85% from 1990 levels by 2050, with the remaining emission reduction achieved by controlled offsets. The CLCPA also requires electric generators to meet 70% of demand with renewable energy by 2030 and 100% with zero emissions generation by 2040. Statements from New York's Governor and the state's 2025 New York State Energy Plan acknowledge that the near term targets of the statute may not be achievable in the required timeframes. In May 2026, the Governor signed a law amending the CLCPA to, among other things, modify the statewide 40% by 2030 mandate to require the NYDEC to promulgate regulations designed to achieve a 60% by 2040 target. The NYPSC has initiated and/or modified various proceedings in an effort to help the State meet these emissions reduction targets. In May 2023, New York State passed legislation that prohibits the installation of fossil fuel burning equipment and building systems in new buildings commencing on or after December 31, 2025, subject to certain exemptions, and in December 2025 the Governor approved legislation that will require residential natural gas service applicants to pay the installation costs for the first 100 feet of facilities necessary to provide natural gas service commencing December 19, 2026. The May 2023 legislation is subject to ongoing litigation, with the parties agreeing, in November 2025, to suspend the requirements of the legislation pending resolution of appellate proceedings. In addition, the NYDEC, in conjunction with the New York State Energy Research and Development Authority, has engaged in certain efforts to develop a cap-and-invest program in the state, although issuance of certain key regulations necessary to implement the program has been delayed. The May 2026 amendments referenced above have extended the date for regulatory action to December 31, 2028. The above-enumerated initiatives could impact the Company's customer base and assets, and could also increase the Company's cost of environmental compliance by increasing reporting requirements, requiring retrofitting of existing equipment, requiring installation of new equipment, and/or requiring the purchase of emission allowances. They could also reduce demand for natural gas and delay or otherwise negatively affect efforts to obtain permits and other regulatory approvals. Changing market conditions and new regulatory requirements, as well as unanticipated or inconsistent application of existing laws and regulations by federal and state administrative agencies, make it difficult to predict a long-term business impact across twenty or more years. Federal, state or local governments may also provide tax advantages and other subsidies to support alternative energy sources, mandate the use of specific fuels or technologies, or promote research into new technologies to reduce the cost and increase the scalability of alternative energy sources.
-61-
NEW AUTHORITATIVE ACCOUNTING AND FINANCIAL REPORTING GUIDANCE
For discussion of the recently issued authoritative accounting and financial reporting guidance, refer to Item 8 at Note A - Summary of Significant Accounting Policies under the heading "New Authoritative Accounting and Financial Reporting Guidance."
EFFECTS OF INFLATION
The Company's operations are sensitive to increases in the rate of inflation because of its operational and capital spending requirements in both its regulated and non-regulated businesses. For the regulated businesses, recovery of increasing costs from customers can be delayed by the regulatory process of a rate case filing. For the non-regulated businesses, prices received for services performed or products produced are determined by market factors that are not necessarily correlated to the underlying costs required to provide the service or product.
SAFE HARBOR FOR FORWARD-LOOKING STATEMENTS
The Company is including the following cautionary statement in this Annual Report on Form 10-K to make applicable and take advantage of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 for any forward-looking statements made by, or on behalf of, the Company. Forward-looking statements include statements concerning plans, objectives, goals, projections, strategies, future events or performance, and underlying assumptions and other statements which are other than statements of historical facts. From time to time, the Company may publish or otherwise make available forward-looking statements of this nature. All such subsequent forward-looking statements, whether written or oral and whether made by or on behalf of the Company, are also expressly qualified by these cautionary statements. Certain statements contained in this report, including, without limitation, statements regarding future prospects, plans, objectives, goals, projections, estimates of oil and gas quantities, strategies, future events or performance and underlying assumptions, capital structure, anticipated capital expenditures, completion of construction projects, projections for pension and other post-retirement benefit obligations, impacts of the adoption of new authoritative accounting and reporting guidance, and possible outcomes of litigation or regulatory proceedings, as well as statements that are identified by the use of the words "anticipates," "believes," "could," "estimates," "expects," "forecasts," "guidance," "intends," "may," "might," "outlook," "plans," "potential," "predicts," "projects," "seeks," "targets," "will," "would", and variations of such words and similar future or conditional expressions, and statements which are other than statements of historical facts, are intended to identify "forward-looking statements" as defined in the Private Securities Litigation Reform Act of 1995 and accordingly involve risks and uncertainties which could cause actual results or outcomes to differ materially from those expressed in the forward-looking statements, including, but not limited to, statements, estimates, and projections relating to the planned spin-off of the Company's IUG business, including the timing and structure of the spin-off, the characteristics of the separated businesses, and the expected benefits of the spin-off, future operating and financial performance and long-term strategy, and the assumptions underlying such expected benefits, targets, strategies, and statements. These forward-looking statements are based on management's beliefs, expectations, estimates, and projections at the time they are made and are not guarantees of future performance. The Company's expectations, beliefs and projections contained herein are expressed in good faith and are believed by the Company to have a reasonable basis, but there can be no assurance that such expectations, beliefs or projections will result or be achieved or accomplished. There can be no guarantees with respect to whether the planned spin-off will be completed. In addition to other factors and matters discussed elsewhere herein, the following are among the important factors that, in the view of the Company, could cause actual results to differ materially from those discussed in the forward-looking statements:
1.The Company's ability to affect the planned spin-off and to meet the conditions related thereto; the ability to obtain any consents or approvals required to complete the spin-off; the ability of the separated companies to each succeed as standalone publicly traded companies; negative effects of the announcement or pendency of the spin-off on the market price of the Company's securities and/or on the Company's financial performance; the possibility that the spin-off will not achieve its intended benefits; the possibility of disruption, including disputes, litigation, or unanticipated costs in connection with the spin-off; the impact of the spin-off on the Company's businesses and the risk that the spin-off may be more difficult,
-62-
time-consuming, or costly than expected, including the impact on the Company's resources, systems, procedures, and controls, diversion of management's attention, and the impact and possible disruption of existing relationships with regulators, customers, suppliers, employees, and other business counterparties; the ability to achieve anticipated capital structures in connection with the spin-off; the ability to achieve anticipated credit ratings in connection with the spin-off; the ability to achieve anticipated tax treatments in connection with the spin-off and future, if any, divestitures, mergers, acquisitions, and other portfolio changes, and the impact of changes in relevant tax and other laws and regulations;
2.The Company's ability to complete strategic transactions, such as the plan to separate the Company into two independent, publicly traded companies through a tax-free spin-off of the Company's IUG business, including receipt of required regulatory clearances and satisfaction of other conditions to closing, and to recognize the anticipated benefits of such transactions;
3.The Company's ability to realize the benefits that are anticipated from its acquisition of CenterPoint Ohio;
4.Changes in laws, regulations or judicial interpretations to which the Company is subject, including those involving derivatives, taxes, safety, employment, climate change, other environmental matters, real property, and exploration and production activities such as hydraulic fracturing;
5.Governmental/regulatory actions, initiatives and proceedings, including those involving rate cases (which address, among other things, target rates of return, rate design, retained natural gas and system modernization), environmental/safety requirements, affiliate relationships, industry structure, and franchise renewal;
6.Changes in economic conditions, including the imposition of additional tariffs on U.S. imports and related retaliatory tariffs, inflationary pressures, supply chain issues, liquidity challenges, and global, national or regional recessions, and their effect on the demand for, and customers' ability to pay for, the Company's products and services;
7.Governmental/regulatory actions and/or market pressures to reduce or eliminate reliance on natural gas;
8.The Company's ability to estimate accurately the time and resources necessary to meet emissions targets;
9.Changes in the price of natural gas;
10.Impairments under the SEC's full cost ceiling test for natural gas reserves;
11.The creditworthiness or performance of the Company's key suppliers, customers and counterparties;
12.Financial and economic conditions, including the availability of credit, and occurrences affecting the Company's ability to obtain financing on acceptable terms for working capital, capital expenditures, other investments, and acquisitions, including any downgrades in the Company's credit ratings and changes in interest rates and other capital market conditions;
13.Negotiations with the collective bargaining units representing the Company's workforce, including potential work stoppages during negotiations;
14.Changes in price differentials between similar quantities of natural gas sold at different geographic locations, and the effect of such changes on commodity production, revenues and demand for pipeline transportation capacity to or from such locations;
15.The impact of information technology disruptions, cybersecurity or data security breaches, including the impact of issues that may arise from the use of artificial intelligence technologies;
16.Factors affecting the Company's ability to successfully identify, drill for and produce economically viable natural gas reserves, including among others geology, lease availability and costs, title disputes, weather conditions, water availability and disposal or recycling opportunities of used water, shortages, delays or unavailability of equipment and services required in drilling operations, insufficient gathering, processing and transportation capacity, the need to obtain governmental approvals and permits, and compliance with environmental laws and regulations;
17.Increased costs or delays or changes in plans with respect to Company projects or related projects of other companies, as well as difficulties or delays in obtaining necessary governmental approvals, permits or orders or in obtaining the cooperation of interconnecting facility operators;
-63-
18.Increasing health care costs and the resulting effect on health insurance premiums and on the obligation to provide other post-retirement benefits;
19.Other changes in price differentials between similar quantities of natural gas having different quality, heating value, hydrocarbon mix or delivery date;
20.The cost and effects of legal and administrative claims against the Company or activist shareholder campaigns to effect changes at the Company;
21.Uncertainty of natural gas reserve estimates;
22.Significant differences between the Company's projected and actual production levels for natural gas;
23.Changes in demographic patterns and weather conditions (including those related to climate change);
24.Changes in the availability, price or accounting treatment of derivative financial instruments;
25.Changes in laws, actuarial assumptions, the interest rate environment and the return on plan/trust assets related to the Company's pension and other post-retirement benefits, which can affect future funding obligations and costs and plan liabilities;
26.Economic disruptions or uninsured losses resulting from major accidents, fires, severe weather, natural disasters, terrorist activities or acts of war, as well as economic and operational disruptions due to third-party outages;
27.Significant differences between the Company's projected and actual capital expenditures and operating expenses; or
28.Increasing costs of insurance, changes in coverage and the ability to obtain insurance.
Forward-looking statements speak only as of the date on which they are made, and the Company undertakes no obligation, and disclaims any duty, to update, revise, or withdraw any forward-looking statement, whether as a result of new information, future events, or otherwise, except as required by applicable law or regulation.
Forward-looking and other statements in this Annual Report on Form 10-K regarding methane and greenhouse gas reduction plans and goals are not an indication that these statements are necessarily material to investors or required to be disclosed in our filings with the SEC. In addition, historical, current and forward-looking statements regarding methane and greenhouse gas emissions may be based on standards for measuring progress that are still developing, internal controls and processes that continue to evolve and assumptions that are subject to change in the future.
INDUSTRY AND MARKET DATA DISCLOSURE
The market data and certain other statistical information used throughout this Form 10-K are based on independent industry publications, government publications or other published independent sources. Some data is also based on the Company's good faith estimates. Although the Company believes these third-party sources are reliable and that the information is accurate and complete, it has not independently verified the information.
National Fuel Gas Co. published this content on November 20, 2026, and is solely responsible for the information contained herein. Distributed via EDGAR on November 20, 2026 at 17:54 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]