The University of Toledo

11/12/2026 | Press release | Distributed by Public on 11/12/2026 08:27

Chilled Water Plant for Both Campuses to Shut Down Beginning Nov. 13

Chilled Water Plant for Both Campuses to Shut Down Beginning Nov. 13

November 12, 2026 | News, UToday
By Staff


While late this year, the fall chill has finally arrived, which means it's time to shut down UToledo's chilled water plants on both campuses and move from building cooling to heating beginning Friday, Nov. 13.

The switch from cooling to heating begin with Main Campus buildings located on the north side of Ottawa River. The switch to Main Campus buildings located on the south side of Ottawa River will begin sometime during the week of Monday, Nov. 16, through Friday, Nov. 20.

The switch to the academic buildings on the Health Science Campus also begins Friday, Nov. 13. This does not apply to patient care areas as the ability to cool those is maintained year-round.

There may be the unexpectedly warm day through fall semester.

Any areas experiencing temperatures well outside the normal range can utilize the online work order system to submit a work request or can contact Facilities and Construction through the work control center at 419.530.1000.

The University of Toledo published this content on November 12, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 12, 2026 at 14:27 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]