11/12/2026 | Press release | Distributed by Public on 11/12/2026 08:27
While late this year, the fall chill has finally arrived, which means it's time to shut down UToledo's chilled water plants on both campuses and move from building cooling to heating beginning Friday, Nov. 13.
The switch from cooling to heating begin with Main Campus buildings located on the north side of Ottawa River. The switch to Main Campus buildings located on the south side of Ottawa River will begin sometime during the week of Monday, Nov. 16, through Friday, Nov. 20.
The switch to the academic buildings on the Health Science Campus also begins Friday, Nov. 13. This does not apply to patient care areas as the ability to cool those is maintained year-round.
There may be the unexpectedly warm day through fall semester.
Any areas experiencing temperatures well outside the normal range can utilize the online work order system to submit a work request or can contact Facilities and Construction through the work control center at 419.530.1000.