07/15/2025 | Press release | Distributed by Public on 07/15/2025 08:02
A portion of West Quintette Road between Highway 95-A and Dukes Drive will be closed to through traffic beginning Friday, July 18 for storm drain installation.
Detours will be in place along Highway 95-A and Quintette Lane during the construction period. Motorists traveling on West Quintette Road should use extra caution and follow road crew instructions and posted signs when traveling through the work zone. The road is expected to reopen by Saturday, Sept. 6.
Residents, pedestrians, and emergency vehicles will have access to properties within the work area at all times; however, there may be short periods when a driveway or entrance may be blocked temporarily as equipment and materials are moved during construction.
If other roadway closures are necessary or work is delayed, another notice will be issued.