Management's Discussion and Analysis of Financial Condition and Results of Operations.
Certain information contained in the following discussion and analysis, including information with respect to our plans, strategy, projections and expected timeline for our business and related financing, includes forward-looking statements. Forward-looking statements are estimates based upon current information and involve a number of risks and uncertainties. Actual events or results may differ materially from the results anticipated in these forward-looking statements as a result of a variety of factors.
You should read "Part 1, Item 1A. Risk Factors" and "Cautionary Statement on Forward-Looking Statements" elsewhere in this Quarterly Report on Form 10-Q ("Quarterly Report") and under similar headings in the Annual Report on Form 10-K for the year ended December 31, 2025 (our "Annual Report") for a discussion of important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
The following information should be read in conjunction with our unaudited condensed consolidated financial statements and accompanying notes included elsewhere in this Quarterly Report. Our financial statements have been prepared in accordance with generally accepted accounting principles in the United States of America ("GAAP"). This information is intended to provide investors with an understanding of our past performance and our current financial condition and is not necessarily indicative of our future performance. Please refer to "-Factors Impacting Comparability of Our Financial Results" for further discussion. Unless otherwise indicated, dollar amounts are presented in millions.
Unless the context otherwise requires, references to "Company," "NFE," "we," "our," "us" or like terms refer to New Fortress Energy Inc. and its subsidiaries.
Overview
Liquidity and Going Concern
As part of preparing the financial statements included in this Quarterly Report, we have evaluated whether conditions exist that give rise to substantial doubt as to our ability to continue as a going concern.
As previously disclosed in the Company's Annual Report on Form 10-K for the year ended December 31, 2025 and its Quarterly Reports on Form 10-Q for the quarters ended March 31, 2026 and June 30, 2026, management concluded that there was substantial doubt about the Company's ability to continue as a going concern. That conclusion was based on, among other things, the level of the Company's indebtedness, its failure to make scheduled interest payments, and the resulting events of default under its debt agreements.
On September 11, 2026, the Company completed the Restructuring Transaction (see Note 5), which terminated all of the Company's previously outstanding corporate debt and reduced its recourse corporate indebtedness from approximately $5.7 billion to approximately $710.8 million. The terms of the CoreCo Term Loans permit interest to be paid in kind for the first 18 months following the Closing Date. Quarterly principal payments of approximately $1.8 million begin in December 2026, with the remaining principal due at maturity in September 2031. The Company also issued Series A Mandatorily Convertible Preferred Stock and FLNG 2 Preferred Interests, which are recorded in mezzanine equity at $2,458.8 million and $200.0 million, respectively (see Note 20). The Series A Mandatorily Convertible Preferred Stock is not redeemable within one year after the date these condensed consolidated financial statements are issued, as the Company does not expect to have funds legally available for redemption. Any redemption of the FLNG 2 Preferred Interests is payable only from FLNG 2's resources. Accordingly, management has not included the redemption of either preferred instrument as a use of the Company's cash in its going concern assessment.
In October 2026, the Company announced that FLNG 1, its principal source of LNG supply, was offline following a mechanical issue with the facility's gas turbine. The Company is actively working with the manufacturer of the turbine to return FLNG 1 to operation as soon as possible and expects FLNG 1 to return to service during the fourth quarter of 2026. However, the timing of FLNG 1's return to service is outside management's control, and uncertainty about the duration of the outage is a significant factor in assessing the Company's near-term liquidity. While FLNG 1 is offline, the Company is unable to produce LNG at the facility, which has reduced, and is expected to continue to reduce, operating cash flows. In addition, the Company continued to incur operating losses and use cash in operating activities during the three and nine months ended September 30, 2026, and had negative working capital at September 30, 2026. These results include costs related to the Restructuring Transaction of $47.3 million and $172.9 million for the three and nine months ended September 30, 2026, respectively.
Tableof Contents
In addition to returning FLNG 1 to service, the Company continues to evaluate other actions to improve its liquidity and cash flows, but there can be no assurance that any such actions will be completed within one year after the date the condensed consolidated financial statements are issued, or at all. While management expects to execute its plans, under ASC 205-40, in assessing its going concern analysis, management's plans may be considered only to the extent they are probable of being effectively implemented within one year after the condensed consolidated financial statements are issued. Because these actions have not been finalized, and certain of them depend on factors outside the Company's control, they may not be considered in management's going concern evaluation.
As a result, management has concluded that the Company's current liquidity and forecasted cash flows from operations are not probable to be sufficient to support, in full, its obligations as they become due within one year after the date the condensed consolidated financial statements are issued, and there is substantial doubt about the Company's ability to continue as a going concern.
Restructuring Transaction
On September 11, 2026, the Company completed a comprehensive restructuring of the Company's principal funded debt obligations (the "Restructuring Transaction"), including, among other things, the separation of the Company's businesses, assets and subsidiaries in Brazil and land in Wyalusing, Pennsylvania (collectively, "BrazilCo"), the exchange of existing debt obligations for new debt and equity securities, and the incurrence of new term loan facilities.
For further discussion of the Restructuring Transaction, see Note 5 of our condensed consolidated financial statements. The discussion below reflects the Company's business after the Restructuring Transaction and the separation of BrazilCo in connection therewith.
Following the Restructuring Transaction, we are a simpler and significantly less leveraged company. We reduced our recourse corporate indebtedness from approximately $5.7 billion to approximately $710.8 million, and we no longer own or operate the Brazil Business. Our business is now concentrated in two complementary areas: (i) LNG supply and downstream delivery, consisting of our LNG supply portfolio and the terminals and related infrastructure that serve our customers in Puerto Rico and Mexico, and (ii) power generation, consisting of the La Paz Power Plant and our portfolios of mobile and aeroderivative gas turbines. We expect to focus on deploying these existing assets and completing in-process projects. All our current operations are included in our single reportable segment, Terminals and Infrastructure.
Business overview
We are a global energy infrastructure company founded to help address energy poverty and accelerate the world's transition to reliable, affordable and clean energy. We own and operate natural gas and LNG infrastructure, power generation assets, and ships and logistics assets that support our operations, and we hold long-term LNG supply arrangements that we intend to use to serve downstream customers. Collectively, we believe our assets and operations help to reinforce global energy security, enable economic growth, enhance environmental stewardship and transform local industries and communities around the world.
We deliver targeted energy solutions by employing an integrated LNG supply and delivery model:
LNG and Natural Gas Supply and Liquefaction - We supply LNG and natural gas regasified from LNG to our own power plants and to our customers. FLNG 1 began producing LNG in July 2024, and we source a significant portion of our LNG needs from this facility. Currently, demand for LNG above FLNG 1's capacity is acquired from third-party suppliers in open market purchases. FLNG 1 is currently offline following a mechanical issue with the facility's gas turbine, and we continue to work with the manufacturer of the turbine to return the unit to operation as soon as possible. We expect FLNG 1 to return to service during the fourth quarter of 2026. Starting in 2027, we expect to meet a portion of our LNG demand under long-term supply contracts, which are based on an index such as Henry Hub plus a fixed fee component. Our strategy is to match this long-term supply with long-term demand from our existing and future downstream customers.
Shipping - Our shipping assets include the Floating Storage Units ("FSUs") and LNG carriers ("LNGC"). These vessels are either used in our terminal operations or sub-chartered to third parties.
Facilities - Through our network of current and planned downstream facilities and logistics assets, we are strategically positioned to deliver gas and power solutions to our customers seeking either to transition from environmentally dirtier distillate fuels such as automotive diesel oil ("ADO") and heavy fuel oil ("HFO") or to purchase natural gas to meet their current fuel needs.
Tableof Contents
Power Generation - We own and operate the La Paz Power Plant (as defined below) in Baja California Sur, Mexico, and hold portfolios of mobile and aeroderivative gas turbines that we deploy to customers to meet their power generation needs, including under lease arrangements.
Our Current Operations
We describe our current operations below in two areas: LNG supply and terminals, and power generation. All of these operations are included in our Terminals and Infrastructure segment.
LNG Supply and Terminals
Our management team has successfully employed our strategy to secure long-term contracts with significant customers, including, the Puerto Rico Electric Power Authority ("PREPA"), and Comisión Federal de Electricidad ("CFE"), Mexico's power utility, each of which is described in more detail below. Our assets built to service these significant customers have been designed with capacity to service other customers.
San Juan Facility
Our San Juan Facility became fully operational in the third quarter of 2020. It is designed as a landed micro-fuel handling facility located in the Port of San Juan, Puerto Rico. The San Juan Facility has multiple truck loading bays to provide LNG to on-island industrial users. The San Juan Facility is near the PREPA San Juan Power Plant and serves as our supply hub for the PREPA San Juan Power Plant and industrial end-user customers in Puerto Rico.
In December 2025, we were awarded a new 7-year gas supply agreement with PREPA to deliver up to 75 TBtu of natural gas annually from our San Juan Facility. The new contract arranges for future delivery of LNG in San Juan for power plants currently running on natural gas and also provides for incremental natural gas volumes, allowing for the conversion of additional gas-ready plants currently burning diesel.
As our recent FLNG 1 outage has impaired our ability to make current deliveries of LNG, certain constituencies in the Puerto Rico government have called for termination of the gas supply agreement. We continue to have productive discussions with Puerto Rico and believe this issue will be resolved after FLNG 1 returns to service and our ability to deliver LNG is restored.
We continue to provide operation and maintenance services for PREPA's thermal generation assets through our wholly-owned subsidiary, Genera PR LLC ("Genera"), with the goal of reducing costs and improving reliability of power generation in Puerto Rico. The service period under the contract commenced on July 1, 2023, and we receive an annual management fee for the services provided.
La Paz Facility
In 2021, we began commercial operations at the Port of Pichilingue in Baja California Sur, Mexico (the "La Paz Facility"). The La Paz Facility also supplies our gas-fired power units located adjacent to the La Paz Facility (the "La Paz Power Plant") and could have a maximum capacity of up to 135 MW of power. We placed the La Paz Power Plant into service in the third quarter of 2023.
In the third quarter of 2024, we executed an amendment to the gas sales agreement with CFE for multiple CFE power generation facilities in Baja California Sur on a take-or-pay basis that extended the term to ten years from November 3, 2024, and amended the annual minimum volumes.
FLNG 1
Our first floating liquefaction unit, FLNG 1, has been deployed off the coast of Altamira, Tamaulipas, Mexico. The 1.4 million ton per annum ("MTPA") FLNG unit utilizes CFE's firm pipeline transportation capacity on the Sur de Texas-Tuxpan Pipeline to receive feedgas volumes. FLNG 1 is fully commissioned, and we are in the process of increasing available liquefaction capacity through optimization projects.
Tableof Contents
FLNG 1 is currently offline following a mechanical issue with the facility's gas turbine, and we continue to work with the manufacturer of the turbine to return the unit to operation as soon as possible. We expect FLNG 1 to return to service during the fourth quarter of 2026.
Our LNG Supply and Cargo Sales
NFE provides reliable, affordable and clean energy supplies to customers around the world, and we have and expect in the future to satisfy customer demand with production from FLNG 1, which has capacity to generate up to 75 TBtus annually. We also have binding contracts for LNG volumes from two separate U.S. LNG facilities, each with a 20-year term, which are expected to commence in 2027 and 2030. We expect additional LNG needed to supply expansion of our operations will be provided by open market purchases until the commencement of these LNG supply contracts.
Geopolitical events have substantially impacted and may continue to impact the natural gas and LNG markets, which have experienced significant volatility in recent years, including recently due to the war with Iran. Our pricing in contracts with customers is largely based on the Henry Hub index price plus a fixed fee component. Pricing for feed gas purchased for our own Fast LNG production is based on Henry Hub, which allows us to mitigate exposure to variability in LNG prices. Our long-term supply contracts also contain pricing based on Henry Hub, however, until the commencement of these long-term supply contracts, a portion of our LNG needs will be purchased on the open market which exposes us to volatility in LNG pricing.
Power Generation
La Paz Power Plant - The La Paz Power Plant, located adjacent to our La Paz Facility, has a capacity of up to 135 MW and sells power on a merchant basis.
Turbine Portfolios - We hold portfolios of mobile and aeroderivative gas turbines that can be deployed to customers with near-term power generation needs. In October 2026, we agreed to lease ten mobile turbines, capable of generating up to 300 MW, to a U.S.-based investment-grade company for an initial term of five years (see "Recent Developments - Turbine Lease"). We are actively pursuing opportunities to deploy our remaining portfolio of turbines.
Shipping
Our shipping assets include: LNGCs and FSUs, which are primarily commercially operated by us or opportunistically leased to customers under long-term or spot arrangements when not being used in our operations. FSUs are floating storage assets, which often provide storage for LNG but are also capable of transporting LNG when required. LNGCs are vessels that transport LNG and are compatible with many LNG loading and receiving terminals globally. We may also, from time to time, charter in an Floating Storage and Regasification Unit ("FSRU") to provide offshore storage and regasification capabilities.
We lease, own and operate various operating service vessels, tugboats and other vessels to support our global operations.
Vessels we operate at our terminal operations or that we decide to sub-charter were historically included in our Terminals and Infrastructure segment. From November 2025 until September 11, 2026, only one vessel, Nusantara Regas Satu, was included in the Ships segment. The vessel was chartered to a third party under a long-term arrangement which was part of the Energos Formation Transaction (defined below). In connection with the restructuring, our forward starting charter agreement with Energos for Nusantara Regas Satu was terminated on September 11, 2026. As a result, the Ships segment no longer exists, and effective September 11, 2026, we have one reportable segment, Terminals and Infrastructure.
In August 2022, we completed a transaction (the "Energos Formation Transaction") with an affiliate of Apollo Global Management, Inc., pursuant to which we transferred ownership of eleven vessels to Energos in exchange for approximately $1.85 billion in cash and a 20% equity interest in Energos. Ten of the vessels were subject to current or future charters with NFE and one vessel (the Nanook) was not subject to a future NFE charter. The in-place and future charters to NFE of ten vessels prevented the recognition of the sale of those vessels to Energos, and the proceeds associated with these vessels have been treated as a failed sale leaseback. As a result, these ten vessels were recognized on our Consolidated Balance Sheet as Property, plant and equipment, and the proceeds were recognized as debt. Consistent with this treatment, for the vessels that remain, (i) the third-party charter revenues continue to be recognized by us as Vessel charter revenue; (ii) the
Tableof Contents
costs of operating the vessels are included in Vessel operating expenses for the remaining terms of the third-party charters and (iii) such revenues are included as part of debt service for the sale leaseback financing debt and are included in additional financing costs within Interest expense, net. In February 2024, we sold substantially all of our stake in Energos.
In November 2025, we completed a transaction with Energos, pursuant to which the Company early terminated the long-term charter agreements with Energos for Energos Eskimo, Energos Winter, Energos Igloo and Energos Freeze and novated associated sub-charter agreements for these vessels to Energos, in exchange for cash consideration of $150.0 million. This transaction resulted in the sale of these vessels that were previously accounted for as a failed sale leaseback. The Company no longer recognizes charter revenues and vessel operating expenses associated with these vessels.
In connection with the BrazilCo separation on September 11, 2026, we disposed of Energos Celsius, which was part of the BrazilCo operations. As a result of the Nusantara Regas Satu termination, the November 2025 transaction and the BrazilCo separation, four of the vessels from the Energos Formation Transaction, NFE Grand, NFE Penguin, Energos Maria, and Energos Princess, remain recognized on our Condensed Consolidated Balance Sheet as Property, plant and equipment, with the related proceeds recognized as debt, as of September 30, 2026.
Our Development Projects
Our projects currently under development include our development of a second modular liquefaction facility to provide a source of low-cost supply of LNG to customers around the world through our Fast LNG technologies; our LNG terminal facility and power plant in Puerto Sandino, Nicaragua ("Puerto Sandino Facility"); and our LNG terminal and power plant in Ireland ("Ireland Facility"). Subsequent to the Restructuring Transaction, we are focusing on operational efficiency of our current facilities, deployment of our LNG supply and turbine portfolios, and cost-effective completion of in-process development projects.
The design, development, construction and operation of our projects are highly regulated activities and subject to various approvals and permits. The process to obtain required permits, approvals and authorizations is complex, time-consuming, challenging and varies in each jurisdiction in which we operate. We obtain required permits, approvals and authorizations in due course in connection with each milestone for our projects.
We describe each of our current development projects below.
FLNG 2 Project
We do not plan to incur significant capital expenditures to develop our second 1.4 MTPA Fast LNG unit ("FLNG 2 Project") and are evaluating a sale or co-development of the asset. NFE FLNG 2 LLC ("FLNG 2") is a consolidated subsidiary of the Company. NFE FLNG 2 Parent LLC ("FLNG 2 Parent"), which holds the preferred interests in FLNG 2 and a $400.0 million note receivable from FLNG 2 and is the borrower under the FLNG 2 Term Loan Facility and the issuer of the FLNG 2 Parent Preferred Interests, has an independent Board that was appointed by its lenders and is not consolidated. Proceeds from any sale or other disposition of FLNG 2 Project will first repay the expenses of FLNG 2, payments under the FLNG 2 Incentive Program, the FLNG 2 Term Loan Facility ($400.0 million plus accrued interest) and then the $200.0 million liquidation preference of the FLNG 2 Preferred Interests. Our shareholders would only receive proceeds above those amounts.
During the quarter ended September 30, 2026, we identified indicators that the carrying value of FLNG 2 Project may not be recoverable and recorded an impairment charge for the FLNG 2 Project. We evaluate the FLNG 2 Project for impairment when events or changes in circumstances indicate its carrying value may not be recoverable. Such events include a decision not to complete construction, a sale or offer to purchase at a price below carrying value, or a valuation indicating fair value below carrying value. If we sell the FLNG 2 Project, agree to sell it, or classify it as held for sale at an amount below its carrying value, or if other indicators of impairment arise, we may be required to record additional impairment charges, which could be material.
Puerto Sandino Facility
We are continuing to develop an offshore liquefied natural gas receiving, transloading and regasification facility in Puerto Sandino, Nicaragua, as well as a pipeline connecting the facility with our Puerto Sandino Power Plant. We have entered into a 25-year PPA with Nicaragua's electricity distribution companies, and if the project is completed we expect to utilize approximately 57,000 MMBtu from LNG per day to provide natural gas to the Puerto Sandino Power Plant in
Tableof Contents
connection with the 25-year power purchase agreement. Construction of the power plant is substantially complete, and we expect to complete the construction of the terminal and commission both the terminal and the power plant in 2027, barring changes in the Company's strategy or other delays. As part of our long-term strategy, we are also evaluating solutions to optimize power generation and delivery to other markets, connected to our power plant through a regional transmission line.
Following the completion of the Restructuring Transactions, the Company continues to consider and evaluate its existing operations, development projects and intended development projects, as well as further opportunistic strategies that seek to optimize the value of its portfolio, while providing additional liquidity and cash flows.
Ireland Facility
We intend to develop and operate an LNG facility and power plant on the Shannon Estuary, near Tarbert, Ireland. In April 2023, we were awarded a capacity contract for the development of a power plant for approximately 353 MW of electricity generation with a duration of ten years as part of the auction process operated by Ireland's Transmission System Operator.
In the third quarter of 2023, An Bord Pleanála ("ABP"), Ireland's planning commission, denied our application for the development of an LNG terminal and power plant. We challenged this decision, and in September 2024, the High Court of Ireland ruled that ABP did not have appropriate grounds for the denial of our permit. In March 2025, ABP withdrew their appeal to the September 2024 decision of the High Court of Ireland. ABP is now reconsidering our planning application in accordance with Irish Law.
Further, in March 2025, ABP granted our application to construct a 600 MW power plant and a separate application to construct the 220 kV electricity interconnect. We are able to fuel this power plant via our LNG marine import terminal, if approved, or using gas provided from our permitted pipeline interconnection. The continued development of this project is uncertain and there are multiple risks, including regulatory risks, which could preclude the development of this project; however, management continues to assess all options in respect of future developments for the land held.
Brazil Facilities
In connection with the completion of the Restructuring Transaction on September 11, 2026, we completed the separation of BrazilCo, which held our Brazil business, including our LNG import terminal and associated pipeline located in Santa Catarina, Brazil (the "Santa Catarina Facility"), the FSRU and associated infrastructure located in Barcarena, Pará, Brazil (the "Barcarena Facility"), the 630 MW combined cycle natural gas-fired power plant located in Pará, Brazil (the "Barcarena Power Plant"), and the 1.6 GW simple cycle natural gas-fired power plant adjacent to the Barcarena Facility (the "PortoCem Power Plant"). As a result, the Company no longer owns or operates these facilities.
Recent Developments
Restructuring Transaction
On September 11, 2026 (the "Closing Date"), the Company consummated the comprehensive restructuring of its principal funded debt obligations (the "Restructuring Transaction") pursuant to the restructuring plans promoted by each of two indirect subsidiaries of the Company under Part 26A of the UK Companies Act 2006 (together, the "Restructuring Plans") and sanctioned by the High Court of Justice of England and Wales on June 18, 2026. On June 29, 2026, the United States Bankruptcy Court for the Southern District of New York entered an order granting recognition of the Restructuring Plans in the United States pursuant to chapter 15 of the U.S. Bankruptcy Code.
In accordance with the terms of (i) the Restructuring Support Agreement (the "RSA"), entered into on March 17, 2026, between the Company, certain of its subsidiaries, and certain of its lenders and noteholders, and (ii) the Restructuring Plans, together with the related transaction implementation deed, on the Closing Date:
•the Company separated into two separate, independent companies: one generally comprising the Company's businesses and assets in Brazil ("BrazilCo"), and the other generally comprising the Company's other businesses and assets, which will be retained by the Company ("CoreCo");
Tableof Contents
•the following debt instruments, and all obligations thereunder (collectively, the "Terminated Debt," and the holders of such Terminated Debt, the "Plan Creditors"), were terminated, and all liens in connection therewith were released:
•the 6.500% Senior Notes due 2026, issued by the Company pursuant to that certain Indenture, dated as of April 12, 2021, by and among the Company, as issuer, the guarantors from time to time party thereto and U.S. Bank Trust Company, National Association (as successor in interest to U.S. Bank National Association), as trustee and collateral agent;
•that certain Credit Agreement, dated as of April 15, 2021, by and among the Company, as the borrower, the guarantors from time to time party thereto, the lenders and issuing banks from time to time party thereto, and MUFG Bank Ltd., as administrative agent and collateral agent (as amended, restated, amended and restated, supplemented or otherwise modified from time to time, the "Revolving Credit Agreement");
•that certain Credit Agreement, dated as of October 30, 2023, by and among the Company, as the borrower, the guarantors from time to time party thereto, the lenders from time to time party thereto, and Wilmington Trust, National Association (as successor by assignment to Morgan Stanley Senior Funding, Inc.), as administrative agent and collateral agent (as amended, restated, amended and restated, supplemented or otherwise modified from time to time, the "Term Loan B Credit Agreement");
•the 8.750% Senior Secured Notes, issued by the Company pursuant to that certain Indenture, dated as of March 8, 2024, by and among the Company, as the issuer, the guarantors from time to time party thereto and U.S. Bank Trust Company, National Association, as trustee and collateral agent;
•that certain Credit Agreement, dated as of July 19, 2024, by and among the Company, as the borrower, the guarantors from time to time party thereto, the lenders from time to time party thereto, and Wilmington Trust, National Association (as successor by assignment to Morgan Stanley Senior Funding, Inc.), as administrative agent and collateral agent;
•the 12.000% Senior Secured Notes due 2029 (the "New 2029 Notes"), issued pursuant to that certain Indenture, dated as of November 22, 2024, by and among NFE Financing LLC, an indirect subsidiary of the Company, as the issuer, the guarantors from time to time party thereto and Wilmington Savings Fund Society, FSB, as trustee and collateral agent;
•that certain Credit Agreement, dated as of November 22, 2024, by and among the Company, the guarantors from time to time party thereto, NFE Brazil Investments LLC, as lender, and Wilmington Savings Fund Society, FSB, as administrative agent and collateral agent;
•that certain Credit Agreement, dated as of December 6, 2024, by and among the Company, the guarantors from time to time party thereto, NFE Financing LLC, as lender, and Wilmington Savings Fund Society, FSB, as administrative agent and collateral agent; and
•that certain Credit Agreement, dated as of November 22, 2024, among NFE Brazil Investments LLC, a Delaware limited liability company, as borrower, NFE Financing, as lender, the guarantors from time to time party thereto, and Wilmington Savings Fund Society, FSB as administrative agent and collateral agent;
•the Terminated Debt was exchanged with the applicable Plan Creditors for a combination of the following debt obligations and equity securities:
•100% of the common equity interests in BrazilCo;
•$571.3 million in senior secured term loans incurred by the Company, as borrower, and guaranteed by certain subsidiaries of the Company (the "New CoreCo Take-Back Term Loans");
•2,454,936 shares of CoreCo's Series A Mandatorily Convertible Preferred Stock (the "CoreCo Mandatorily Convertible Preferred Stock");
•10,608,922 shares of the Company's Class A common stock ("CoreCo common stock"), representing 65% of the CoreCo common stock as of the Closing Date (giving effect to the Reverse Split (as defined
Tableof Contents
below), but before giving effect to any incentive plan for directors, officers and other employees of the Company or any conversion of the CoreCo Mandatorily Convertible Preferred Stock), with existing stockholders retaining the other 35%;
•$400 million in non-recourse senior secured term loans (the "FLNG 2 Term Loans") incurred by FLNG 2 Parent, a newly formed holding company, payable in full on the third anniversary of the Closing Date, guaranteed by, and secured by substantially all of the assets of, the subsidiaries of FLNG 2 Parent, including FLNG 2, which is a wholly owned consolidated subsidiary of the Company that owns the Company's FLNG 2 Project; and
•$200 million in non-convertible, preferred equity interests (the "FLNG 2 Parent Preferred Interests") issued by FLNG 2 Parent;
•the Company's existing letter of credit facility was amended and restated (the "Amended LC Facility") and provides for a $250 million committed letter of credit facility. Certain letters of credit issued under the Company's Revolving Credit Agreement will be replaced by letters of credit issued under the Amended LC Facility;
•the Company raised $139.5 million of new financing from certain existing creditors (the "CoreCo Capital Raise"), comprised of $36.5 million ($35 million issued with 4% original issue discount) of new senior secured term loans (the "Capital Raise Senior Term Loans," and together with the New CoreCo Take-Back Term Loans, the "New CoreCo Senior Term Loans") and $100 million of new junior term loans plus an additional $3 million premium on such junior term loans to be paid in kind which rank junior in right of payment to the New CoreCo Senior Term Loans (such junior loans, collectively, the "Capital Raise Junior Term Loans," and together with the Capital Raise Senior Term Loans, the "Capital Raise Term Loans"); and
•BrazilCo paid approximately $74 million to CoreCo in satisfaction of certain existing intercompany obligations.
In connection with the Restructuring Transactions, the Company amended and restated its Certificate of Incorporation (as amended and restated, the "A&R Certificate of Incorporation") to, among other things, (i) effect a 50:1 reverse stock split of its Class A common stock (the "Reverse Split"); (ii) remove the existing staggered board of directors structure; (iii) provide for the election of directors by a majority of the total votes that may be cast in the election of directors by holders of all issued and outstanding shares of the Company entitled to vote, replacing the existing plurality voting standard; (iv) increase the minimum size of the Board of Directors from one director to three directors; (v) provide for exculpation of certain of the Company's officers from liability to the extent permitted by Delaware law, substantially aligning the protections for the Company's officers with those currently afforded to the Company's directors; (vi) remove any and all references to shares of the Company's Class B common stock; and (vii) provide that holders of shares of Class A common stock will not be entitled to vote on any amendment to the A&R Certificate of Incorporation that relates solely to the terms of one or more outstanding series of shares of preferred stock or other classes or series of capital stock if the holders of such affected classes or series are entitled, either separately or together with the holders of one or more other such classes or series, to vote thereon pursuant to the A&R Certificate of Incorporation or pursuant to the Delaware General Corporation Law. The Company also unanimously amended and restated its bylaws.
The foregoing description of the Restructuring Transaction is a summary and does not purport to be complete. For additional information, see the Company's Current Report on Form 8-K, filed with the SEC on September 11, 2026 and incorporated by reference herein.
Turbine Lease
On October 23, 2026, the Company agreed to lease ten mobile turbines that can generate up to 300 megawatts of power to a US-based investment-grade company. The lease is for an initial period of five years, with certain termination rights and related liquidated damages if the counterparty terminates before the end of the five-year term.
The turbines are expected to be delivered in stages beginning in the fourth quarter of 2026 and finalized in the first quarter of 2027. The transaction is expected to be accretive to NFE's earnings and enhance its liquidity profile.
Other Matters
On June 18, 2020, we received an order from the Federal Energy Regulatory Commission ("FERC"), which asked us to explain why our San Juan Facility is not subject to FERC's jurisdiction under section 3 of the NGA. Because we do not believe that the San Juan Facility is jurisdictional, we provided our reply to FERC on July 20, 2020 and requested that FERC act expeditiously. On March 19, 2021, FERC issued an order that the San Juan Facility does fall under FERC
Tableof Contents
jurisdiction. FERC directed us to file an application for authorization to operate the San Juan Facility within 180 days of the order, which was September 15, 2021, but also found that allowing operation of the San Juan Facility to continue during the pendency of an application is in the public interest. FERC also concluded that no enforcement action against us is warranted, presuming we comply with the requirements of the order. Parties to the proceeding, including the Company, sought rehearing of the March 19, 2021 FERC order, and FERC denied all requests for rehearing in an order issued on July 15, 2021; the FERC order was affirmed by the United States Court of Appeals for the District of Columbia Circuit ("D.C. Circuit") on June 14, 2022. In order to comply with the FERC's directive, on September 15, 2021, we filed an application for authorization to operate the San Juan Facility, which remains pending.
On July 18, 2023, we filed for an amendment to the March 19, 2021 and July 15, 2021 FERC orders allowing the continued operation of the San Juan Facility during the pendency of the formal application to allow us to construct and interconnect 220 feet of incremental 10-inch pipeline needed to supply natural gas for temporary power generation solicited through the Puerto Rico Power Stabilization Task Force. On July 31, 2023, FERC issued an order stating that it would not take action to prevent the construction and operation of the pipeline and interconnect and on January 30, 2024, FERC reaffirmed the order allowing the construction and operation to continue. On September 19, 2025, the D.C. Circuit denied a petition challenging this FERC order, holding that the order reflected an unreviewable exercise of enforcement discretion rather than a de facto authorization for construction or operation. The deadline to seek a writ of certiorari from that decision has expired.
On September 26, 2024, the United States Coast Guard ("USCG") filed a Letter of Recommendation ("LOR") with FERC in which it assessed our Letter of Intent dated April 12, 2024, and our Waterway Suitability Assessment, dated August 26, 2024, in respect of future ship to ship transfers with alternative vessels, and recommended against the allowance of the proposed operations. Further, on September 26, 2024, the USCG issued a Letter of Warning in respect of our ongoing ship to ship transfers of LNG operations within the San Juan port limits. On October 21, 2024, we filed an appeal with the USCG under 33 CFR 160.7. In December 2024 and February 2025, we submitted an updated Letter of Intent and Waterway Suitability Assessments detailing our alternative operational plans to the USCG and are working collaboratively with the USCG to obtain a new LOR to FERC in support of our operations, which we expect to be forthcoming. In concert with our collaboration with the USCG regarding our operational plans, we withdrew our appeal on February 14, 2025. On January 12, 2026, the Acting Captain of the Port of San Juan for the USCG issued a LOR in response to NFE's filings. The LOR determined that the Port of San Juan waterway is suitable for the transit and docking of larger LNG Carriers. Currently, the Captain of the Port authorizes each vessel delivery to the San Juan facility by an order, pending approval of the updated Letter of Intent and Waterway Suitability Assessments referenced above. Consistent with these Captain of the Port orders, the Company is utilizing larger LNG carriers of up to approximately 155,000 cubic meters in capacity, with individual deliveries presently limited to between 60,000-100,000 cubic meters of LNG per call.
On October 25, 2024, FERC issued a notice of intent to prepare an Environmental Impact Statement, which included, among other things, two public scoping sessions in Puerto Rico held on November 18, 2024 in accordance with the National Environmental Policy Act.
Results of Operations - Three Months Ended September 30, 2026 compared to Three Months Ended June 30, 2026 and Nine Months Ended September 30, 2026 compared to Nine Months Ended September 30, 2025
Performance of our reported segments, Terminals and Infrastructure and Ships, is evaluated based on Segment Operating Margin. Segment Operating Margin reconciles to Consolidated Segment Operating Margin as reflected below, which is a non-GAAP measure. We reconcile Consolidated Segment Operating Margin to GAAP Gross margin, inclusive of depreciation and amortization. Consolidated Segment Operating Margin is mathematically equivalent to Revenue minus Cost of sales (excluding depreciation and amortization reflected separately) minus Operations and maintenance minus Vessel operating expenses, each as reported in our financial statements. We believe this non-GAAP measure, as we have defined it, offers a useful supplemental measure of the overall performance of our operating assets in evaluating our profitability in a manner that is consistent with metrics used for management's evaluation of the overall performance of our operating assets.
Consolidated Segment Operating Margin is not a measurement of financial performance under GAAP and should not be considered in isolation or as an alternative to Gross margin, income from operations, net income, cash flow from operating activities or any other measure of performance or liquidity derived in accordance with GAAP. As Consolidated Segment Operating Margin measures our financial performance based on operational factors that management can impact in the short-term, items beyond the control of management in the short term, such as depreciation and amortization are excluded. As a result, this supplemental metric affords management the ability to make decisions and facilitates measuring
Tableof Contents
and achieving optimal financial performance of our current operations. The principal limitation of this non-GAAP measure is that it excludes significant expenses and income that are required by GAAP. A reconciliation is provided for the non-GAAP financial measure to the most directly comparable GAAP measure, Gross margin. Investors are encouraged to review the related GAAP financial measures and the reconciliation of the non-GAAP financial measure to our Gross margin, and not to rely on any single financial measure to evaluate our business.
From November 2025 until September 11, 2026, only one vessel, Nusantara Regas Satu, was included in the Ships segment. In connection with the restructuring, the Company's forward starting charter agreement with Energos for Nusantara Regas Satu was terminated on September 11, 2026. As a result, the Ships segment no longer exists, and effective September 11, 2026, the Company has one reportable segment, Terminals and Infrastructure.
The tables below present our segment information for the three months ended September 30, 2026 and June 30, 2026, and for the nine months ended September 30, 2026 and September 30, 2025, excluding the Brazil Business, and the Ships segment results are presented through September 11, 2026:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended September 30, 2026
|
|
(in thousands of $)
|
Terminals and
Infrastructure
|
|
Ships
|
|
Total Segment
|
|
Consolidation
and Other
|
|
Consolidated
|
|
Total revenues
|
$
|
327,897
|
|
|
$
|
7,921
|
|
|
$
|
335,818
|
|
|
$
|
-
|
|
|
$
|
335,818
|
|
|
Cost of sales(1)
|
172,816
|
|
|
-
|
|
|
172,816
|
|
|
-
|
|
|
172,816
|
|
|
Vessel operating expenses(2)
|
-
|
|
|
2,032
|
|
|
2,032
|
|
|
-
|
|
|
2,032
|
|
|
Operations and maintenance(2)
|
73,052
|
|
|
-
|
|
|
73,052
|
|
|
-
|
|
|
73,052
|
|
|
Segment Operating Margin
|
$
|
82,029
|
|
|
$
|
5,889
|
|
|
$
|
87,918
|
|
|
$
|
-
|
|
|
$
|
87,918
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended September 30, 2026
|
|
(in thousands of $)
|
|
|
Consolidated
|
|
Gross margin (GAAP)
|
|
|
$
|
51,185
|
|
|
Depreciation and amortization
|
|
|
36,733
|
|
|
Consolidated Segment Operating Margin (Non-GAAP)
|
|
|
$
|
87,918
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended June 30, 2026
|
|
(in thousands of $)
|
Terminals and
Infrastructure
|
|
Ships
|
|
Total Segment
|
|
Consolidation
and Other
|
|
Consolidated
|
|
Total revenues
|
$
|
212,857
|
|
|
$
|
13,254
|
|
|
$
|
226,111
|
|
|
$
|
-
|
|
|
$
|
226,111
|
|
|
Cost of sales(1)
|
119,183
|
|
|
-
|
|
|
119,183
|
|
|
-
|
|
|
119,183
|
|
|
Vessel operating expenses(2)
|
71
|
|
|
5,902
|
|
|
5,973
|
|
|
-
|
|
|
5,973
|
|
|
Operations and maintenance(2)
|
32,069
|
|
|
-
|
|
|
32,069
|
|
|
-
|
|
|
32,069
|
|
|
Segment Operating Margin
|
$
|
61,534
|
|
|
$
|
7,352
|
|
|
$
|
68,886
|
|
|
$
|
-
|
|
|
$
|
68,886
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended June 30, 2026
|
|
(in thousands of $)
|
|
|
Consolidated
|
|
Gross margin (GAAP)
|
|
|
$
|
34,516
|
|
|
Depreciation and amortization
|
|
|
34,370
|
|
|
Consolidated Segment Operating Margin (Non-GAAP)
|
|
|
$
|
68,886
|
|
Tableof Contents
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nine Months Ended September 30, 2026
|
|
(in thousands of $)
|
Terminals and
Infrastructure
|
|
Ships
|
|
Total Segment
|
|
Consolidation
and Other
|
|
Consolidated
|
|
Total revenues
|
$
|
724,786
|
|
|
$
|
28,447
|
|
|
$
|
753,233
|
|
|
$
|
-
|
|
|
$
|
753,233
|
|
|
Cost of sales(1)
|
448,092
|
|
|
-
|
|
|
448,092
|
|
|
-
|
|
|
448,092
|
|
|
Vessel operating expenses(2)
|
725
|
|
|
7,934
|
|
|
8,659
|
|
|
-
|
|
|
8,659
|
|
|
Operations and maintenance(2)
|
152,054
|
|
|
-
|
|
|
152,054
|
|
|
-
|
|
|
152,054
|
|
|
Segment Operating Margin
|
$
|
123,915
|
|
|
$
|
20,513
|
|
|
$
|
144,428
|
|
|
$
|
-
|
|
|
$
|
144,428
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nine Months Ended September 30, 2026
|
|
(in thousands of $)
|
|
|
Consolidated
|
|
Gross margin (GAAP)
|
|
|
$
|
38,772
|
|
|
Depreciation and amortization
|
|
|
105,656
|
|
|
Consolidated Segment Operating Margin (Non-GAAP)
|
|
|
$
|
144,428
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nine Months Ended September 30, 2025
|
|
(in thousands of $)
|
Terminals and
Infrastructure
|
|
Ships
|
|
Total Segment
|
|
Consolidation
and Other
|
|
Consolidated
|
|
Total revenues
|
$
|
911,516
|
|
|
$
|
102,667
|
|
|
$
|
1,014,183
|
|
|
$
|
-
|
|
|
$
|
1,014,183
|
|
|
Cost of sales(1)
|
662,265
|
|
|
-
|
|
|
662,265
|
|
|
-
|
|
|
662,265
|
|
|
Vessel operating expenses(2)
|
3,717
|
|
|
18,824
|
|
|
22,541
|
|
|
-
|
|
|
22,541
|
|
|
Operations and maintenance(2)
|
158,219
|
|
|
-
|
|
|
158,219
|
|
|
-
|
|
|
158,219
|
|
|
Segment Operating Margin
|
$
|
87,315
|
|
|
$
|
83,843
|
|
|
$
|
171,158
|
|
|
$
|
-
|
|
|
$
|
171,158
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nine Months Ended September 30, 2025
|
|
(in thousands of $)
|
|
|
Consolidated
|
|
Gross margin (GAAP)
|
|
|
$
|
33,998
|
|
|
Depreciation and amortization
|
|
|
$
|
137,160
|
|
|
Consolidated Segment Operating Margin (Non-GAAP)
|
|
|
$
|
171,158
|
|
(1) Cost of sales is presented exclusive of costs included in Depreciation and amortization in the Condensed Consolidated Statements of Operations and Comprehensive (Loss) Income.
(2) Operations and maintenance and Vessel operating expenses are directly attributable to revenue-producing activities of our terminals and vessels and are included in the calculation of Gross margin defined under GAAP.
Tableof Contents
Terminals and Infrastructure Segment
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended
|
|
(in thousands of $)
|
September 30, 2026
|
|
June 30, 2026
|
|
Change
|
|
Total revenues
|
$
|
327,897
|
|
|
$
|
212,857
|
|
|
$
|
115,040
|
|
|
Cost of sales (exclusive of depreciation and amortization)
|
172,816
|
|
|
119,183
|
|
|
53,633
|
|
|
Vessel operating expenses
|
-
|
|
|
71
|
|
|
(71)
|
|
|
Operations and maintenance
|
73,052
|
|
|
32,069
|
|
|
40,983
|
|
|
Segment Operating Margin
|
$
|
82,029
|
|
|
$
|
61,534
|
|
|
$
|
20,495
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nine Months Ended
|
|
(in thousands of $)
|
September 30, 2026
|
|
September 30, 2025
|
|
Change
|
|
Total revenues
|
$
|
724,786
|
|
|
$
|
911,516
|
|
|
$
|
(186,730)
|
|
|
Cost of sales (exclusive of depreciation and amortization)
|
448,092
|
|
|
662,265
|
|
|
(214,173)
|
|
|
Vessel operating expenses
|
725
|
|
|
3,717
|
|
|
(2,992)
|
|
|
Operations and maintenance
|
152,054
|
|
|
158,219
|
|
|
(6,165)
|
|
|
Segment Operating Margin
|
$
|
123,915
|
|
|
$
|
87,315
|
|
|
$
|
36,600
|
|
Total revenue
Total revenue for the Terminals and Infrastructure Segment increased by $115.0 million for the three months ended September 30, 2026 compared to the three months ended June 30, 2026, and decreased by $186.7 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025.
The increase in revenue for the three months ended September 30, 2026 compared to the three months ended June 30, 2026, was primarily attributable to higher cargo sales, higher contract novation income, and higher revenue in Mexico, partially offset by lower revenue from our San Juan Facility.
•Cargo sales increased $50.9 million from the three months ended June 30, 2026 to the three months ended September 30, 2026, due to higher volumes sold and higher pricing.
•Revenues attributable to our La Paz Facility in Mexico increased $25.0 million, due to higher volumes delivered of 0.7 TBtu and a higher Japan Korea Marker (JKM) index, which is the basis for billing one of our customers. The average JKM index pricing increased by 21.2% for the three months ended September 30, 2026 compared to the three months ended June 30, 2026.
•Contract novation income increased by $38.1 million in the three months ended September 30, 2026, compared to the three months ended June 30, 2026. In the fourth quarter of 2024, the Company novated an LNG supply contract to a customer and agreed to guarantee the performance of the LNG supplier in exchange for future cash payments. During the third quarter of 2026, the Company received a payment as the LNG supplier fulfilled their obligations, which released the Company from associated guarantee liability.
•We generated higher charter revenue of $4.6 million from chartering a vessel during the three months ended September 30, 2026.
The increases above were partially offset by lower revenue from our San Juan Facility of $5.1 million, due to undelivered volumes related to the pilotage of our vessels in and out of San Juan Bay Harbor.
The decrease in revenue of $186.7 million in the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 was primarily attributable to the sale of our Jamaica business and lower cargo sales, among other factors described below.
•In May 2025, we sold our Jamaica business, resulting in $141.3 million lower revenues.
Tableof Contents
•Revenue from cargo sales decreased $63.0 million from the nine months ended September 30, 2025 to the nine months ended September 30, 2026, as we utilized higher gas volumes at our terminal operations. Cargo sales volume decreased from 15.4 TBtu to 9.7 TBtu.
•Revenues from our Puerto Rico operations decreased $14.2 million from the nine months ended September 30, 2025 to nine months ended September 30, 2026, due to lower volumes delivered at our San Juan Facility. In addition, we generated $11.5 million revenue from turbine replacement during the nine months ended September 30, 2025, with no comparable revenue in 2026.
•Revenues from Genera, which provides operations and maintenance services in Puerto Rico, decreased by $8.5 million, due to lower reimbursable costs passed on to the customer during the nine months ended September 30, 2026.
•Vessel charter revenues decreased by $35.9 million, primarily due to the sale of certain vessels to Energos in the fourth quarter of 2025 and the expiration of certain third-party vessel charters.
The decreases were partially offset by $47.7 million higher revenues in Mexico, driven by a higher JKM Index price, which increased by 33.6%, and by higher contract novation income of $36.7 million, as discussed above.
Cost of sales
Cost of sales includes the procurement of feed gas or LNG, as well as shipping and logistics costs to deliver LNG or natural gas to our facilities. We source LNG and natural gas from third parties and our own liquefaction facilities, including our Fast LNG unit. Costs to convert natural gas to LNG, including labor, depreciation and other direct costs to operate our liquefaction facilities are also included in Cost of sales. Our subsidiary, Genera, provides operations and maintenance services to PREPA's thermal generation assets, and cost to provide these services is included in Cost of sales. Under our contract with PREPA, we pass all of these costs onto PREPA, and such billings are recognized as revenue.
Cost of sales increased by $53.6 million for the three months ended September 30, 2026 compared to the three months ended June 30, 2026. The increase is primarily due to higher volumes and higher costs associated with cargo sales and the delivery of natural gas in Puerto Rico and Mexico, as well as higher vessel and bunker costs. The weighted average cost of gas decreased marginally from $9.02 to $8.79 per MMBtu, primarily due to zero spot cargo purchase as we consumed more gas produced from our FLNG 1 unit. The Henry Hub index remained relatively flat with a 2% increase from the three months ended June 30, 2026 to the three months ended September 30, 2026. The significant components of this change are discussed below.
•Cost of sales related to Mexico terminals increased by $9.4 million as a result of increased volumes consumed at our La Paz Facility.
•Cost of sales related to cargo sales increased by $22.7 million due to an additional 2.2 TBtu sold in the three months ended September 30, 2026 compared to the three months ended June 30, 2026.
•Cost of sales related to our Puerto Rico operations increased $12.5 million from the three months ended June 30, 2026 to the three months ended September 30, 2026 due to higher volumes delivered in July and August 2026 at our San Juan Facility.
Cost of sales decreased by $214.2 million for the nine months ended September 30, 2026 as compared to the nine months ended September 30, 2025. The weighted average cost of gas purchased increased from $7.76 to $9.36 per MMBtu and the average Henry Hub index increased by 7.1%. The significant components of this change are discussed below.
•In May 2025, we sold our Jamaica business, resulting in a $79.1 million decrease in cost of sales.
•Vessel costs and bunker costs decreased by $71.1 million and $7.5 million, respectively, during the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025, due to a reduced number of vessels chartered in our fleet. The decrease reflects the assignment of vessels as part of the sale of our Jamaica business in May 2025, and charter expirations or terminations during 2025 and the first three quarters of 2026.
Tableof Contents
•Cargo sales costs were $94.6 million for the nine months ended September 30, 2026, compared to $119.5 million for the nine months ended September 30, 2025, consistent with the decrease in cargo sales revenue as discussed above.
•Cost of sales related to our Puerto Rico operations decreased by $24.0 million due to lower LNG prices per MMBtu and lower sales volumes, consistent with the decrease in Puerto Rico revenues as discussed above.
•Cost of sales related to providing operations and maintenance services in Puerto Rico decreased by $4.7 million, consistent with the reduction in revenue due to lower reimbursable costs during the nine months ended September 30, 2026.
The weighted-average cost of our LNG inventory balance to be used in our operations as of September 30, 2026 and December 31, 2025 was $8.23 per MMBtu and $7.96 per MMBtu, respectively.
Vessel operating expenses
Vessel operating expenses relate to direct costs such as crewing, repairs and maintenance, insurance, stores, lube oils, communication expenses, and management fees associated with operating vessels.
Vessel operating expenses within the Terminals and Infrastructure Segment for the three months ended September 30, 2026 and June 30, 2026, and for the nine months ended September 30, 2026 and 2025, were not material to our results of operations.
Operations and maintenance
Operations and maintenance includes costs of operating our facilities, exclusive of costs to convert that are reflected in Cost of sales.
Operations and maintenance increased $41.0 million for the three months ended September 30, 2026 compared to the three months ended June 30, 2026. The increase was primarily due to increased turbine lease and maintenance expenses and higher costs related to FLNG 1.
The change in operations and maintenance for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025 was mainly driven by the sale of our Jamaica business in May 2025.
Ships Segment
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended,
|
|
(in thousands of $)
|
September 30, 2026
|
|
June 30, 2026
|
|
Change
|
|
Total revenues
|
$
|
7,921
|
|
|
$
|
13,254
|
|
|
$
|
(5,333)
|
|
|
Vessel operating expenses
|
2,032
|
|
|
5,902
|
|
|
(3,870)
|
|
|
Segment Operating Margin
|
$
|
5,889
|
|
|
$
|
7,352
|
|
|
$
|
(1,463)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nine Months Ended,
|
|
(in thousands of $)
|
September 30, 2026
|
|
September 30, 2025
|
|
Change
|
|
Total revenues
|
$
|
28,447
|
|
|
$
|
102,667
|
|
|
$
|
(74,220)
|
|
|
Vessel operating expenses
|
7,934
|
|
|
18,824
|
|
|
(10,890)
|
|
|
Segment Operating Margin
|
$
|
20,513
|
|
|
$
|
83,843
|
|
|
$
|
(63,330)
|
|
Tableof Contents
Total revenue
Revenue in the Ships segment is comprised of operating lease revenue under time charters, fees for positioning and repositioning vessels as well as the reimbursement of certain vessel operating costs. Between November 2025 and September 11, 2026, only one vessel, Nusantara Regas Satu, was included in this segment.
Total revenue for the Ships segment, which consisted of the vessel Nusantara Regas Satu, decreased by $5.3 million for the three months ended September 30, 2026 compared to the three months ended June 30, 2026.
The total revenue for the Ships segment for the nine months ended September 30, 2026 decreased by $74.2 million compared to the nine months ended September 30, 2025, primarily attributable to the November 2025 early termination of our long-term charter agreements with Energos for the vessels in the segment, including Energos Eskimo and Energos Igloo, and the sale of those vessels, resulting in a reduction in charter revenue.
Vessel operating expenses
Vessel operating expenses include direct costs associated with operating a vessel, such as crewing, repairs and maintenance, insurance, stores, lube oils, communication expenses, and management fees. We also recognize voyage expenses within Vessel operating expenses, which principally consist of fuel consumed before or after the term of time charter or when the vessel is off hire. Under time charters, the majority of voyage expenses are paid by customers. To the extent that these costs are a fixed amount specified in the charter, which is not dependent upon redelivery location, the estimated voyage expenses are recognized over the term of the time charter.
Total vessel operating expenses for the Ships segment decreased by $3.9 million for the three months ended September 30, 2026 compared to the three months ended June 30, 2026, primarily due to the shorter period presented through September 11, 2026.
The vessel operating expenses decreased by $10.9 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025, due to the November 2025 termination of our long-term charter agreements for Energos Eskimo and Energos Igloo, as discussed above.
Tableof Contents
Other operating results
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Three Months Ended,
|
|
Nine Months Ended,
|
|
(in thousands of $)
|
September 30, 2026
|
|
June 30, 2026
|
|
Change
|
|
September 30, 2026
|
|
September 30, 2025
|
|
Change
|
|
Selling, general and administrative
|
$
|
65,489
|
|
|
$
|
60,155
|
|
|
$
|
5,334
|
|
|
$
|
158,135
|
|
|
$
|
132,430
|
|
|
$
|
25,705
|
|
|
Transaction and integration costs
|
47,273
|
|
|
72,494
|
|
|
(25,221)
|
|
|
172,929
|
|
|
100,578
|
|
|
72,351
|
|
|
Depreciation and amortization
|
36,733
|
|
|
34,370
|
|
|
2,363
|
|
|
105,656
|
|
|
137,160
|
|
|
(31,504)
|
|
|
Asset impairment expense
|
467,939
|
|
|
-
|
|
|
467,939
|
|
|
529,803
|
|
|
108,786
|
|
|
421,017
|
|
|
Loss (Gain) on sale
|
(37,125)
|
|
|
404
|
|
|
(37,529)
|
|
|
(36,867)
|
|
|
(470,994)
|
|
|
434,127
|
|
|
Goodwill impairment expense
|
-
|
|
|
-
|
|
|
-
|
|
|
-
|
|
|
582,172
|
|
|
(582,172)
|
|
|
Total other operating expenses from continuing operations
|
580,309
|
|
|
167,423
|
|
|
412,886
|
|
|
929,656
|
|
|
590,132
|
|
|
339,524
|
|
|
Operating (loss) income from continuing operations
|
(492,391)
|
|
|
(98,537)
|
|
|
(393,854)
|
|
|
(785,228)
|
|
|
(418,974)
|
|
|
(366,254)
|
|
|
Interest expense
|
160,849
|
|
|
196,199
|
|
|
(35,350)
|
|
|
519,064
|
|
|
494,132
|
|
|
24,932
|
|
|
Other (income) expense, net
|
(1,655)
|
|
|
(2,264)
|
|
|
609
|
|
|
(2,522)
|
|
|
(15,790)
|
|
|
13,268
|
|
|
(Gain) loss on extinguishment of debt, net
|
(384,701)
|
|
|
3,713
|
|
|
(388,414)
|
|
|
(380,988)
|
|
|
20,395
|
|
|
(401,383)
|
|
|
(Gain) on restructuring of debt
|
(1,180,290)
|
|
|
-
|
|
|
(1,180,290)
|
|
|
(1,180,290)
|
|
|
-
|
|
|
(1,180,290)
|
|
|
(Loss) income from continuing operations before income taxes
|
913,406
|
|
|
(296,185)
|
|
|
1,209,591
|
|
|
259,508
|
|
|
(917,711)
|
|
|
1,177,219
|
|
|
Tax (benefit) provision
|
22,375
|
|
|
(7,964)
|
|
|
30,339
|
|
|
39,167
|
|
|
35,748
|
|
|
3,419
|
|
|
Net (loss) income from continuing operations
|
$
|
891,031
|
|
|
$
|
(288,221)
|
|
|
$
|
1,179,252
|
|
|
$
|
220,341
|
|
|
$
|
(953,459)
|
|
|
$
|
1,173,800
|
|
Selling, general and administrative
Selling, general and administrative includes compensation expenses for our corporate employees, employee travel costs, insurance, professional fees for our advisors, and screening costs for projects that are in initial stages and development is not yet probable.
Selling, general and administrative increased by $5.3 million for the three months ended September 30, 2026, compared to the three months ended June 30, 2026. The increase was primarily attributable to an $18.0 million vendor settlement related to a contract termination, and a $7.4 million increase in litigation accruals related to certain legal proceedings. The increases were partially offset by lower other general costs of $11.2 million, lower payroll and compensation costs of $6.2 million, and lower screening costs associated with development projects of $2.4 million.
Selling, general and administrative increased by $25.7 million for the nine months ended September 30, 2026, compared to the nine months ended September 30, 2025. The increase was primarily attributable to a $21.6 million increase in litigation accruals related to certain legal proceedings, an $18.0 million vendor settlement related to a contract termination, a $5.9 million increase in professional fees, and a $5.7 million increase in stock compensation. The increases were partially offset by lower screening costs associated with development projects of $13.0 million, lower payroll and compensation costs of $8.1 million, and lower other general costs of $4.4 million.
Transaction and integration costs
Transaction and integration costs were $47.3 million and $72.5 million for the three months ended September 30, 2026 and June 30, 2026, respectively, and $172.9 million for the nine months ended September 30, 2026. These costs were primarily comprised of legal, professional and consulting fees related to our Restructuring Transaction that was completed in September 2026.
Transaction and integration costs were $100.6 million for the nine months ended September 30, 2025.
We incurred $18.6 million towards professional and consulting fees related to evaluation of our capital structure and liquidity. In addition, we incurred $71.1 million of transaction costs directly attributable to the sale of the Jamaica
Tableof Contents
Business, which included fees for novating a vessel charter to the buyer and contingent fees due to our advisors. Other costs relate to legal fees and other third party costs incurred in connection with amendments to credit agreements.
Depreciation and amortization
Depreciation and amortization expenses increased marginally by $2.4 million for the three months ended September 30, 2026 compared to the three months ended June 30, 2026.
Depreciation and amortization expense decreased by $31.5 million for the nine months ended September 30, 2026 as compared to the nine months ended September 30, 2025. The decrease in depreciation expense resulted primarily from the sale of certain of our vessels to Energos in the fourth quarter of 2025, and sale of our Jamaica business in May 2025.
Asset impairment expense
Asset impairment expense was $467.9 million for the three months ended September 30, 2026 and $529.8 million for the nine months ended September 30, 2026. There was no asset impairment expense during the three months ended June 30, 2026.
During the three months ended September 30, 2026, the Company recorded impairment charges of $460.6 million primarily related to the development of the FLNG 2 Project and development costs related to other FLNG and Pennsylvania projects.
In addition to the impairment above, during the six months ended June 30, 2026, the owner of a vessel under an operating lease repossessed the vessel after the Company failed to make certain lease payments. As the Company no longer had control of the leased asset, we recognized an impairment charge on the right-of-use asset of $60.6 million.
During the nine months ended September 30, 2025, the impairment charge of $108.8 million principally related to the Lakach deepwater project. We determined that it was not probable that we would pursue development of the Lakach deepwater project, and impaired the capitalized project costs.
Loss (Gain) on sale
We recognized a gain of $37.1 million and $36.9 million for the three and nine months ended September 30, 2026, respectively, primarily due to a gain of $67.0 million from the sale of turbines, partially offset by a $34.1 million loss on sale of our vessel Nusantara Regas Satu.
The loss on sale for the three months ended June 30, 2026 was not significant to our results of operations.
In May 2025, the Company completed the sale of its Jamaica Business to Excelerate Energy Limited Partnership
("EELP"), a subsidiary of Excelerate Energy, Inc. for cash consideration of $1,055.0 million, subject to certain purchase
price adjustments. During the nine months ended September 30, 2025, we recognized a gain of $471.0 million related to
the sale.
Goodwill impairment expense
There was no goodwill impairment expense recognized during the three months ended September 30, 2026, the three months ended June 30, 2026, or the nine months ended September 30, 2026.
For the nine months ended September 30, 2025, we recognized an impairment of goodwill of $582.2 million primarily as a result of (i) the significant increase in the weighted average cost of capital which reflected a higher company specific risk premium, and (ii) a reduction in forecasted cash flows following changes in customer revenue projections and the timing of completion of development projects.
Interest expense
Interest expense decreased by $35.4 million for the three months ended September 30, 2026 compared to the three months ended June 30, 2026, mainly as a result of the closing of the Restructuring Transaction on September 11, 2026. The lower interest expense is primarily attributed to lower principal balance. In addition, the Terminated Debt, which had a
Tableof Contents
higher principal balance, only incurred interest through September 11, 2026, compared to a full quarter in the three months ended June 30, 2026.
Interest expense increased by $24.9 million for the nine months ended September 30, 2026 compared to the nine months ended September 30, 2025. The key driver for the increase was the decrease in capitalized interest of $92.2 million due to cessation of interest capitalization for the FLNG 2 project and the sale of turbines in the third quarter of 2026. The increase was partially offset by a $65.0 million reduction in interest expense due to the sale of certain vessels in the Energos transaction during the fourth quarter of 2025. We also incurred lower interest expense on certain debt instruments that were terminated and exchanged in the Restructuring Transaction, as interest accrued only up to September 11, 2026.
Other (income) expense, net
Other (income) expense, net was $(1.7) million for the three months ended September 30, 2026 and $(2.3) million for the three months ended June 30, 2026, respectively. Other (income) expense, net was $(2.5) million and $(15.8) million for the nine months ended September 30, 2026 and 2025, respectively.
Other (income) expense, net for these periods primarily reflected the foreign currency remeasurement gains and losses related to our operations in Mexico, interest income, and fair value remeasurement of contingent consideration arrangements.
(Gain) Loss on extinguishment of debt, net
During the three and nine months ended September 30, 2026, we recorded a total gain on extinguishment of debt of $384.7 million and $381.0 million, respectively. The gain was primarily attributable to the extinguishment of certain debt obligations that were terminated and exchanged upon completion of the Restructuring Transaction on September 11, 2026.
During the three months ended June 30, 2026, we recorded a total loss on extinguishment of debt of $3.7 million related to the repayment of the Turbine Financing due July 2027.
During the nine months ended September 30, 2025, we recorded a total loss on extinguishment of $20.4 million. During this period, we reduced the available capacity under our Revolving Facility by $270.0 million and recognized $10.6 million of loss on extinguishment of debt representing the write-off of unamortized deferred financing costs. We also recognized $5.9 million of loss on extinguishment of debt related to the repayment of the South Power Bonds in conjunction with closing the sale of our Jamaica Business. Additionally, we made a partial repayment of the Term Loan A using proceeds from the sale and incurred a partial extinguishment loss of $3.8 million.
Gain on restructuring
During the three and nine months ended September 30, 2026, we recorded a gain on restructuring of $1,180.3 million, which is comprised of (i) a gain on restructuring of $1,113.8 million relating to the Terminated Debt and (ii) a gain on restructuring of $66.5 million relating to the EB-5 Loan Agreement.
Tax provision
We recognized a tax provision for the three months ended September 30, 2026 of $22.4 million compared to a tax benefit of $(8.0) million for the three months ended June 30, 2026. Our tax provision was $39.2 million and $35.7 million for the nine months ended September 30, 2026 and September 30, 2025, respectively. The company recognized a tax provision on pre-tax income from continuing operations in the third quarter of 2026 primarily driven by the impact from changes in the valuation allowance, projected pre-tax earnings in certain foreign operations and tax expense under the Organization for Economic Cooperation and Development's Pillar Two framework.
Tableof Contents
Factors Impacting Comparability of Our Financial Results
Our historical results of operations and cash flows are not indicative of results of operations and cash flows to be expected in the future, principally for the following reasons:
•Our historical results of operations include our Jamaica business. In May 2025, we completed the sale of our Jamaica business, and after this point, we no longer include the results of operations of the Montego Bay Facility and Old Harbour Facility in our financial statements.
•Our current LNG sourcing does not include LNG supply from long-term supply contracts until 2027. Since our first Fast LNG project was placed into service in the fourth quarter of 2024, we source a significant portion of our LNG needs from FLNG 1. Starting in July 2027, we expect to have additional LNG supply from certain long-term supply contracts, which are based on an index such as Henry Hub plus a fixed fee component.
•Our historical financial results do not include the new capital structure resulting from the Restructuring Transaction. Our results for the three and nine months ended September 30, 2026 reflect the new capital structure only for the period from September 11, 2026 through September 30, 2026. The Restructuring Transaction resulted in the separation of our Brazil business, the exchange of existing debt for new debt and equity securities (including the issuance of Series A Mandatorily Convertible Preferred Stock and new shares of our Class A common stock), and the incurrence of new term loans and preferred equity at various subsidiaries. These changes will materially impact our reported interest expense, outstanding debt, equity balances, cost of borrowing and earnings per share calculations. In addition, the mandatory conversion of the Series A Mandatorily Convertible Preferred Stock, potential future equity issuances, and the implementation of new incentive plans may result in further dilution and changes to our financial metrics. As a result, our future financial results will not be directly comparable to our historical results.
•We have reached compromise agreements to reduce expenses which are not reflected in our historical financial results. Over the past several months, we reached compromise agreements with vendors, service providers and other partners to materially reduce our outstanding obligations. These cost savings are expected to further impact the comparability of our financial results to prior periods by lowering our ongoing expense base and improving our overall financial position moving forward.
Liquidity and Capital Resources
Cash Flows
The following table summarizes the changes to our cash flows for the nine months ended September 30, 2026 and 2025, respectively:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Nine Months Ended September 30,
|
|
(in thousands of $)
|
2026
|
|
2025
|
|
Change
|
|
Cash flows from:
|
|
|
|
|
|
|
Operating activities
|
$
|
(270,065)
|
|
|
$
|
(507,221)
|
|
|
$
|
237,156
|
|
|
Investing activities
|
(588,069)
|
|
|
361,905
|
|
|
(949,974)
|
|
|
Financing activities
|
763,398
|
|
|
(488,488)
|
|
|
1,251,886
|
|
Cash used in operating activities
Our cash flows used in operating activities was $270.1 million for the nine months ended September 30, 2026, which decreased by $237.2 million from cash used in operating activities of $507.2 million for the nine months ended September 30, 2025. Our net loss for the nine months ended September 30, 2026, when adjusted for non-cash items, was $762.5 million and $504.9 million for the nine months ended September 30, 2026 and 2025, respectively.
Cash outflows during the nine months ended September 30, 2026 were impacted by significant professional and consulting fees relating to our capital restructuring process. These outflows were partially offset by improved collections on outstanding receivables. Cash flows from discontinued operations were also impacted by collections on outstanding receivables.
Tableof Contents
Cash used in / (provided by) investing activities
Our cash flows used in investing activities was $588.1 million for the nine months ended September 30, 2026, which decreased by $950.0 million from cash provided by investing activities of $361.9 million for the nine months ended September 30, 2025. Cash flows used in investing activities for continuing operations during the nine months ended September 30, 2026 were used primarily for capital expenditures for continued construction of the Puerto Sandino Facility, of which $29.8 million of these capital expenditures was paid significantly beyond our vendors customary payment terms, and as such, is presented as a financing activity.
Cash flows used in investing activities related to discontinued operations during the nine months ended September 30, 2026 were primarily related to cash transferred to the Plan Creditors as part of the transfer of BrazilCo and capital expenditures for continued construction of the PortoCem Power Plant.
Cash flows from investing activities for continuing operations during the nine months ended September 30, 2025 were primarily from proceeds of $949.5 million from the sale of the Jamaica Business. Cash inflows from investing activities were offset by cash outflows from discontinued operations during the nine months ended September 30, 2025, which were primarily used for continued construction of the PortoCem Power Plant.
Cash provided by / (used in) financing activities
Our cash flows provided by financing activities was $763.4 million for the nine months ended September 30, 2026, which increased by $1,251.9 million from cash used in financing activities of $(488.5) million for the nine months ended September 30, 2025. Cash flows provided by financing activities for continuing operations during the nine months ended September 30, 2026 were primarily from proceeds on borrowings of debt, with cash outflows partially offset by repayments.
Cash flows provided by financing activities related to discontinued operations during the nine months ended September 30, 2026 were primarily from proceeds on borrowing of debt of $1.1 billion, with cash outflows partially offset by $417.9 million of repayments.
Cash flows used in financing activities include cash outflows from continuing operations during the nine months ended September 30, 2025 primarily due to $1.4 billion of repayments, partially offset by proceeds on borrowings of debt of $1.0 billion. We repaid our Revolving Facility and repaid our short-term borrowings under repurchase agreements, prior to drawing on these facilities. In conjunction with closing the sale of the Jamaica Business, we repurchased all outstanding South Power Bonds for $227.1 million. Cash inflows from discontinued operations during the nine months ended September 30, 2025 primarily related to proceeds from borrowings of debt.
Contractual Obligations
We are committed to make cash payments in the future pursuant to certain contracts. The following table summarizes certain contractual obligations in place as of September 30, 2026:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(in thousands)
|
Total
|
|
Remaining three months ending December 31, 2026
|
|
2027 & 2028
|
|
2029 & 2030
|
|
Thereafter
|
|
Long-term debt obligations
|
$
|
1,569,388
|
|
|
$
|
38,452
|
|
|
$
|
32,653
|
|
|
$
|
459,483
|
|
|
$
|
1,038,800
|
|
|
Purchase obligations
|
15,945,974
|
|
|
48,975
|
|
|
537,790
|
|
|
1,336,093
|
|
|
14,023,116
|
|
|
Lease obligations
|
679,071
|
|
|
37,694
|
|
|
195,676
|
|
|
136,097
|
|
|
309,604
|
|
|
Total
|
$
|
18,194,433
|
|
|
$
|
125,121
|
|
|
$
|
766,119
|
|
|
$
|
1,931,673
|
|
|
$
|
15,371,520
|
|
Long-term debt obligations
For information on our long-term debt obligations, see "-Liquidity and Capital Resources-Long-Term Debt" below. The amounts included in the table above are based on the total debt balance, scheduled maturities, and interest rates in effect as of September 30, 2026.
Tableof Contents
A portion of our long-term debt obligations will be paid to Energos under charters of vessels included in the Energos Formation Transaction to third parties. The residual value of these vessels also forms a part of the obligation and will be recognized as a bullet payment at the end of the charters. As neither these third-party charter payments nor the residual value of these vessels represent cash payments due by NFE, such amounts have been excluded from the table above.
Purchase obligations
We are party to contractual purchase commitments for the purchase, production and transportation of LNG and natural gas, as well as engineering, procurement and construction agreements to develop our terminals and related infrastructure. Our commitments to purchase LNG and natural gas are principally take-or-pay contracts, which require the purchase of minimum quantities of LNG and natural gas, and these commitments are designed to assure sources of supply and are not expected to be in excess of normal requirements. Certain LNG purchase commitments are subject to conditions precedent, and we include these expected commitments in the table above beginning when delivery is expected assuming that all contractual conditions precedent are met. For purchase commitments priced based upon an index such as Henry Hub, the amounts shown in the table above are based on the spot price of that index as of September 30, 2026.
We have construction purchase commitments in connection with our Puerto Sandino Facility development project, and any remaining unpaid commitments on our FLNG projects. Commitments included in the table above include commitments under engineering, procurement and construction contracts where a notice to proceed has been issued. Our remaining committed capital expenditures, inclusive of invoiced amounts in Accounts payable, towards these projects is approximately $271.0 million.
We do not plan to incur significant capital expenditures to develop our FLNG 2 Project and are evaluating a sale or co-development of the asset.
Lease obligations
Future minimum lease payments under non-cancellable lease agreements, inclusive of fixed lease payments for renewal periods we are reasonably certain will be exercised, are included in the above table. Our lease obligations are primarily related to LNG vessel time charters, marine port leases, ISO tank leases, office space, and a land lease.
Long-Term Debt
Restructuring Transaction
In September 2026, the Company completed the Restructuring Transaction, upon which the obligations under the 2026 Notes, the 2029 Notes, the Term Loan A Credit Agreement, the Term Loan B Credit Agreement, the Revolving Credit Agreement, the New 2029 Notes, and certain intercompany credit agreements were exchanged for a combination of common equity interests in BrazilCo, the Company's Class A common stock, certain preferred securities and debt obligations as follows:
•$571.3 million in senior secured term loans incurred by the Company, as borrower, and guaranteed by certain subsidiaries of the Company (the "New CoreCo Take-Back Term Loans"); and
•$400.0 million in non-recourse senior secured term loans (the "FLNG 2 Term Loans") incurred by NFE FLNG 2 Parent LLC ("FLNG 2 Parent"), a newly formed unconsolidated entity, payable in full on the third anniversary of the Closing Date. In connection with this arrangement, FLNG 2 Parent entered into corresponding back-to-back debt with FLNG 2 ("FLNG 2 Loan Note").
The Company also raised $139.5 million of new financing and received $135.0 million cash proceeds from certain existing creditors (the "CoreCo Capital Raise"), comprised of $36.5 million of new senior secured term loans (the "Capital Raise Senior Term Loans", and together with the New CoreCo Take-Back Term Loans, the "CoreCo Senior Term Loans") and $103.0 million of new junior term loans (the "CoreCo Junior Term Loans", and together with the CoreCo Senior Term Loans, "CoreCo Term Loans").
CoreCo Senior Term Loans and CoreCo Junior Term Loans
On September 11, 2026, the Company entered into a Credit Agreement (the "CoreCo Credit Agreement"), which provides for a secured term loan facility (the "CoreCo Term Loan Facility") comprising: (i) $607.8 million of CoreCo Senior Term
Tableof Contents
Loans and (ii) $103.0 million of CoreCo Junior Term Loans. Both the CoreCo Senior Term Loans and the CoreCo Junior Term Loans will mature on September 11, 2031. The CoreCo Credit Agreement also provides the Company with the ability to incur up to $50.0 million of additional Capital Raise Junior Loans after the Closing Date pursuant to an incremental amendment.
The CoreCo Term Loan Facility is guaranteed, jointly and severally, on a senior secured basis by the Company and each of its restricted material subsidiaries (the "CoreCo Loan Parties"), subject to certain exceptions and exclusions and are secured by first-priority liens on substantially all of the assets of the CoreCo Loan Parties, subject to certain exceptions and exclusions. The CoreCo Term Loan Facility is subject to a customary intercreditor agreement with respect to the liens securing the CoreCo LC Facility (as defined below), pursuant to which the liens under the CoreCo LC Facility rank senior to the liens under the CoreCo Term Loan Facility with respect to shared collateral.
The CoreCo Credit Agreement contains usual and customary representations and warranties for transactions of this type, and usual and customary affirmative and negative covenants for transactions of this type, in each case, subject to applicable materiality qualifiers, thresholds and exceptions as set forth in the CoreCo Credit Agreement.
CoreCo Senior Term Loans
The CoreCo Senior Term Loans consist of $571.3 million New CoreCo Take-Back Term Loans and $36.5 million Capital Raise Senior Term Loans, for an aggregate principal amount of $607.8 million. The Capital Raise Senior Term Loans were issued at a discount of 4.00%.
The CoreCo Senior Term Loans bear interest at a per annum rate equal to Term SOFR plus 6.125%, payable in cash (the "Senior Cash Rate"). The Company has the option to pay interest in kind during the first 18 months following closing at a rate equal to the Senior Cash Rate plus 1.50%, compounding quarterly. Quarterly principal payments of approximately $1.5 million are required beginning in December 2026.
The CoreCo Senior Term Loans may be voluntarily prepaid by the Company, in whole or in part, subject to prepayment premiums for voluntary prepayments equal to 2.00% of the aggregate principal amount of such term loans prepaid plus accrued and unpaid interest during the first year following the Closing Date, and at par plus accrued and unpaid interest thereafter. The Company will be required to prepay the CoreCo Senior Term Loans at par with the net proceeds of non-ordinary course asset sales (subject to certain exceptions), property or insurance claims, condemnation proceedings and certain other events enumerated in the CoreCo Credit Agreement after first prepaying or cash collateralizing the Super Priority Obligations to the extent required by the terms of the CoreCo LC Facility.
CoreCo Junior Term Loans
The CoreCo Junior Term Loans consist of $103.0 million Capital Raise Junior Term Loans, which were issued at a discount of 3.00%.
The CoreCo Junior Term Loans bear interest at a per annum rate equal to Term SOFR plus 8.125%, payable in cash (the "Junior Cash Rate"). The Company has the option to pay interest in kind during the first 18 months following closing at a rate equal to the Junior Cash Rate plus 2.00%, compounding quarterly at the end of the applicable interest period. Quarterly principal payments of approximately $0.3 million are required beginning in December 2026.
The CoreCo Junior Term Loans may be voluntarily prepaid by the Company, in whole or in part, subject to a make-whole premium during the first two years following the Closing Date, a prepayment premium of 3.00% during the third year, and a prepayment premium of 1.50% during the fourth year, in each case, calculated on the aggregate principal amount of the Capital Raise Junior Term Loans prepaid plus accrued and unpaid interest.
The Company will be required to prepay the CoreCo Junior Term Loans at par with the net proceeds of non-ordinary course asset sales (subject to certain exceptions), property or insurance claims, condemnation proceedings and certain other events enumerated in the CoreCo Credit Agreement after first prepaying or cash collateralizing the Super Priority Obligations (as defined below) to the extent required by the terms of the CoreCo LC Facility. Any prepayment in connection with a non-ordinary course asset sale will be subject to a prepayment premium of 3.00% on the principal amount prepaid.
FLNG 2 Loan Note
On September 11, 2026, FLNG 2, entered into a loan note agreement (the "FLNG 2 Loan Note Agreement") with FLNG 2 Parent, an unconsolidated entity, in an aggregate principal amount equal to $400.0 million (the "FLNG 2 Loan Note") . The
Tableof Contents
FLNG 2 Loan Note was deemed funded through a cashless rollover of certain amounts outstanding under the Company's existing credit agreements.
The FLNG 2 Loan Note bears interest at a per annum rate equal to Term SOFR plus a fixed rate of 3.00%, payable in-kind and compounding on a quarterly basis on the last day of each interest period. The FLNG 2 Loan Note will mature on September 11, 2029 and no principal payments are required prior to maturity.
The FLNG 2 Loan Note is guaranteed and secured by substantially all of the assets of the subsidiaries of FLNG 2, which is a wholly owned consolidated subsidiary of the Company that owns the Company's FLNG 2 assets.
The FLNG 2 Loan Note may be voluntarily prepaid by FLNG 2, in whole or in part, with no prepayment premiums. FLNG 2 is required to prepay the FLNG 2 Loan Note at par as an event of default arises and continues, subject to a cure period as defined in the FLNG 2 Loan Note Agreement.
Letter of Credit Facility
On September 11, 2026, the Company amended and restated its existing letter of credit facility (the "Amended LC Agreement"), which provides for a total letter of credit commitment of $250.0 million (the "Letter of Credit Facility"). As of September 30, 2026, the Company had $196.0 million of letters of credit outstanding under the Letter of Credit Facility.
The amended Letter of Credit Facility will mature on March 15, 2028, subject to extension. Letters of credit under the Amended LC Agreement bear a letter of credit fee of 2.50% per annum and a fronting fee of 0.35% per annum on the stated amount of outstanding letters of credit, as well as an unused commitment fee of 1.00% per annum on the undrawn portion of the total letter of credit commitment.
The obligations under the Amended LC Agreement are guaranteed by each restricted material subsidiary of the Company that is a guarantor, subject to certain exceptions and exclusions, and are secured by first-priority liens (subject only to certain permitted liens) on substantially all of the assets of the Company and such guarantors, subject to certain exceptions and exclusions. The Amended LC Agreement is subject to a customary intercreditor agreement with respect to the liens securing the CoreCo Term Loan Facility, pursuant to which the liens under the Amended LC Agreement rank senior to the liens under the CoreCo Term Loan Facility with respect to shared collateral.
Letters of credit may be issued in US Dollars, Euros or Mexican Pesos. Letters of credit denominated in a currency other than US Dollars are subject to additional cash collateralization requirements: 10.0% of the stated amount for Euro-denominated letters of credit and 15.0% of the stated amount for Mexican Peso-denominated letters of credit. The Amended LC Agreement requires that net proceeds from asset sales, recovery events and certain other events be applied first to repay any unpaid drawings and other reimbursement obligations, and then to cash collateralize the outstanding letters of credit by depositing dollars in the collateral account in an amount not to exceed 102% of the dollar equivalent of the letter of credit exposure.
EB-5 Loan Settlement and Promissory Note
On September 11, 2026, the Company received a release from the lender under the EB-5 Loan Agreement of its further obligations and liabilities under its guaranty relating to the development and construction of the ZeroParks green hydrogen facility. In exchange, the Company (i) transferred to the lender 100% of the issued and outstanding membership interests of the borrowing entity; (ii) issued a $22.5 million promissory note (the "Promissory Note") to the lender; and (iii) will make a $10.0 million cash payment to the lender or issue 164,864 shares of the Company's common stock, at the Company's option, on the third anniversary of the Closing Date. The Promissory Note bears interest at 7.00% per annum, payable in-kind at the Company's option for the first 18 months, will mature on December 31, 2029.
Critical Accounting Policies and Estimates
A complete discussion of our critical accounting policies and estimates is included in our Annual Report. As of September 30, 2026, there have been no significant changes to our critical accounting policies or estimates since our Annual Report, except as described below:
Troubled-debt restructuring
The Company evaluates all modifications to its debt agreements in accordance with ASC 470. A debt restructuring is considered a troubled debt restructuring ("TDR") if the creditor, for economic or legal reasons related to the debtor's financial difficulties, grants a concession to the debtor that it would not otherwise consider. A creditor is deemed to have
Tableof Contents
granted a concession if the debtor's effective borrowing rate on the restructured debt is less than the effective borrowing rate of the old debt immediately before the restructuring.
In accordance with ASC 470-60, when the total future cash payments, including contingent payments, under the new terms are less than the carrying amount of the debt at the date of the restructuring, which is reduced by the estimated fair value of considerations exchanged, the difference between the carrying amount and the total future cash payments is recognized as a gain on troubled debt restructuring in the financial statements. The gain is recorded immediately in the period when the restructuring occurs, and the carrying amount of the debt is recorded based on the total future cash payments with no interest expense to be recorded in the future periods. If the total future cash payments under the new terms exceed the carrying amount of the debt at the date of restructuring, no adjustment to the carrying amount of the debt is made. Instead, we calculate a new effective interest rate based on the revised terms of the restructured debt. The debt is then amortized over the remaining term of the debt using the new effective interest rate, with interest expense recognized based on the new effective interest rate in future periods.
Discontinued operations
A disposal of an entity or a component of an entity is reported in discontinued operations if the disposal represents a strategic shift that has or will have a material impact on the Company's operations and financial results.
Recent Accounting Standards
For descriptions of recently issued accounting standards, see Note 4 to our notes to condensed consolidated financial statements included elsewhere in this Quarterly Report.