Universalpegasus International Inc

09/22/2022 | Press release | Archived content

Waterdown to Finch Pipeline Replacement Project

UniversalPegasus International Celebrates 2022 Trenchless Technology Project of the Year Runner Up - New Installation

UniversalPegasus International (UPI) is proud to be a finalist for the Trenchless Technology Project of the year award. We are thrilled to have placed as the Runner Up in the New Installation category for our Waterdown to Finch Pipeline Replacement Project.

Project: Waterdown to Finch Pipeline Replacement Project

Scope:

  • UPI provided FEED, Detailed Design, Procurement and Construction Support services

  • Installation of 62 km of 12" pipeline, and associated launcher, receiver and mainline valve stations, from Hamilton to Toronto.

UPI BREAKS THE RECORD FOR LONGEST 12" HDD

UPI designed the longest 12″ HDD in North America with a total length of 3.5 km and 5 horizontal curves!

Sorry, your browser doesn't support embedded videos.
Loading...

Read more about why this project is outstanding in the featured Trenchless Technology article.

Universalpegasus International Inc published this content on September 22, 2022, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on October 12, 2026 at 05:51 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]