CEZ a.s.

09/17/2026 | Press release | Distributed by Public on 09/17/2026 00:22

Information on NPP DUKOVANY 17/09/2026

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 - power operation, Reactor power is 100 %, Turbine generator output - 502 MWe
Unit 2 - power operation, Reactor power is 100 %, Turbine generator output - 496 MWe
Unit 3 - outage
Unit 4 - power operation, Reactor power is 100 %, Turbine generator output - 492 MWe

Electricity production since the beginning of the year: 10 050 185 MWh.

CEZ a.s. published this content on September 17, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on September 17, 2026 at 06:22 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]