NAVSEA - Naval Sea Systems Command

06/17/2025 | Press release | Distributed by Public on 06/17/2025 14:41

Navy Accepts Delivery of Ship to Shore Connector, Landing Craft, Air Cushion 113

NEWS | June 17, 2025

Navy Accepts Delivery of Ship to Shore Connector, Landing Craft, Air Cushion 113

By Team Ships Public Affairs

NEW ORLEANS- The United States Navy accepted delivery of Ship to Shore Connector (SSC), LCAC 113, from Textron Systems, June 12.

The delivery of LCAC 113 comes after completion of Acceptance Trials conducted by the Navy's Board of Inspection and Survey, which tested the readiness and capability of the craft to effectively meet its requirements.

This new addition to the fleet signifies a substantial enhancement in the Navy's amphibious capabilities, providing a vital asset for rapid deployment and logistical support.

"The successful delivery of LCAC 113 will provide the Navy and Marine Corps team with an advanced craft to increase our operational capability in amphibious warfare and maintain our operational readiness against global challenges." said Angela Bonner, acting program manager for Amphibious Assault and Connectors Programs, Program Executive Office (PEO) Ships

LCACs are built with configurations, dimensions, and clearances similar to the legacy LCACs they replace - ensuring that this latest air cushion vehicle is fully compatible with existing, well deck-equipped amphibious ships, the Expeditionary Sea Base and the Expeditionary Transfer Dock. LCACs can carry a 60 to 75-ton payload. They primarily transport weapon systems, equipment, cargo, and assault element personnel through a wide range of conditions, including over-the-beach.

Textron Systems is currently in serial production on LCACs 114-126.

PEO Ships, one of the Department of Defense's largest acquisition organizations, is responsible for executing the development and procurement of all destroyers, amphibious ships and craft, and auxiliary ships, including special mission ships, sealift ships and support ships.

For more on Ship to Shore Connectors visit: Navy Fact Files/Ship to Shore Connectors

SHARE

PRINT
PEO Ships
LCAC
Team Ships
NAVSEA - Naval Sea Systems Command published this content on June 17, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on June 17, 2025 at 20:41 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at support@pubt.io