Traffic Impacts Related to The I-285/I-20 West Interchange Project
|
|
Weather permitting, the Georgia Department of Transportation (Georgia DOT) and its construction partners will temporarily close interstate lanes to install a Smart Work Zone system, weeknights at the following locations of the I-285/I-20 West Interchange project. Smart Work Zone technology keeps construction workers safe and gives drivers real-time traffic updates.
This project will reconstruct and widen several interstate, system-to-system ramps at the I-285/I-20 West Interchange and add a combination of collector-distributor lanes or connecting lanes, and auxiliary lanes along I-20 west and I-285 north of the interchange.
|
|
WHEN/WHERE:
Nighttime Closures
Sunday, June 15, through Friday, June 20, 7 p.m. to 6:30 a.m. (Nightly)
Single, right-lane, and right-shoulder closure at the following location:
-
Six Flags Parkway from Lee Industrial Boulevard (mile marker (MM) 0) to South Service Road (MM 1)
Sunday, June 15, through Friday, June 20, 8 p.m. to 5 a.m. (Nightly)
Single, right-lane, and right-shoulder closure at the following locations:
-
Harwell Road from Collier Drive (MM 0) to Amhurst Drive (MM 1)
-
Delmar Lane from Arlington Drive (MM .05) to Harwell Road (MM 1.5)
-
Fairburn Road from Argus Circle (MM 1) to Fairlane Drive (MM 2)
-
Collier Drive from Harwell Road (MM 1) to Collier Court (MM 2)
Sunday, June 15, through Friday, June 20, 9 p.m. to 5 a.m. (Nightly)
Single, right-lane, and right-shoulder closure at the following locations:
-
I-20 westbound from the Anderson Avenue underpass (MM 53.6) to Riverside Parkway (MM 47)
-
I-285 southbound from US 278/State Route (SR) 8/Donald Lee Hollowell Parkway (MM 11.8) to SR 139/Martin Luther King Jr. Drive (MM 9.6)
-
SR 70/Fulton Industrial Boulevard from Wendell Drive (MM 2) to Shirley Drive (MM 2.5)
-
SR 139/Martin Luther King Jr. Drive from Old Gordon Road (MM 5) to Adamsville Drive (MM 6)
Sunday, June 15, through Friday, June 20, 9 p.m. to 5 a.m. (Nightly)
Alternating, single, right-lane, and right-shoulder closure, and single, left-lane, and left-shoulder closure at the following location:
-
I-20 eastbound from Riverside Parkway (MM 47) to the I-285 Interchange (MM 50.5)
Sunday, June 15, through Friday, June 20, 11 p.m. to 5 a.m. (Nightly)
Double, right-lane, and right-shoulder closure at the following location:
-
I-20 eastbound from Riverside Parkway (MM 47) to the I-285 Interchange (MM 50.5)
|
|
|
Advisory: Exact time may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.
|
|
|