What: Weather permitting, the Georgia Department of Transportation (Georgia DOT) construction partners will temporarily close interstate lanes at the locations below for the I-285/I-20 East Interchange project. The project will reconstruct the interstate system-to-system ramps at the I-285/I-20 East Interchange and add a combination of collector-distributor, or connecting lanes, and auxiliary lanes along I-20 east of the interchange and I-285 north of the interchange.
Where/When: Traffic impacts on the I-285/I-20 Interchange project from Friday, April 25, through Friday, May 2, 2025.
DAYTIME CLOSURES:
Friday, April 25, through Friday, May 2, from 9 a.m. to 2 p.m.
-
I-20 Eastbound: Single, right- or left-lane and shoulder closure from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)
-
I-20 Eastbound: Single, right- or left- lane and shoulder closure from Columbia Drive (MM 66.8) to Wesley Chapel Road (MM 69.5)
-
I-20 Eastbound (connecting lanes or CD lanes): Single, right- or left-lane and shoulder closure from I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.5)
Friday, April 25, through Friday, May 2, from 9 a.m. to 4 p.m.
-
Snapfinger Road under I-285 overpass flagging operation
Friday, April 25, through Friday, May 2, from 9 a.m. to 4 p.m.
-
Miller Road between Panola Industrial Boulevard and Chatooga Drive: flagging operations
OVERNIGHT CLOSURES AND TRAFFIC PACING:
Friday, April 25, through Friday, May 2, from 7 p.m. to 5 a.m.
-
I-20 Eastbound: Single to double, right- or left-lane and shoulder closure from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)
-
I-20 Eastbound (connecting lanes or CD lanes): Single to double, right- or left-lane and shoulder closure from I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.5)
-
I-20 Eastbound: Single to double, right- or left-lane and shoulder closure from Columbia Drive (MM 66.8) to Wesley Chapel Road (MM 69.5)
Friday, April 25, through Friday, May 2, from 8 p.m. to 6 a.m.
-
I-285 Southbound: Single to double, right-lane and shoulder closures from Glenwood to Interchange
-
I-285 Northbound: Single, left-lane and shoulder closure from Columbia to Interchange
Friday, April 25, through Friday, May 2, from 9 p.m. to 5 a.m.
-
I-20 Westbound: Single to double, right- or left-lane and shoulder closure from Panola Road (MM 71.3) to Wesley Chapel Road (MM 69.5)
-
I-20 Westbound: Single to double, left-lane closure from Wesley Chapel Road (MM 69.5) to Columbia Drive (MM 66.8)
Friday, April 25, through Friday, May 2, from 9 p.m. to 6 a.m.
-
I-20 Westbound: Alternating, single, left- and right-lane and shoulder closure from Panola Road (MM 71.4) to Wesley Chapel Road (MM 68.5)
-
I-20 Eastbound: Alternating, single, left- and right-lane and shoulder closures from Wesley Chapel Road (MM 68.5) to Panola Road (MM 71.4)
Friday, April 25, through Friday, May 2, from 11 p.m. to 5 a.m. Traffic Pacing Operations:
-
I-20 Westbound from Wesley Chapel Road (Exit 68) to Columbia Drive (Exit 66)
-
I-20 Eastbound and Westbound from I-285 Interchange (MM 67.3) to Panola Road (MM 71.3), including the westbound entrance ramp from Wesley Chapel Road (Exit 68)
CLOSURES AND DETOURS:
Friday, April 25, through Monday, April 28, from 9 p.m. to 5 a.m.
-
Partial closure of DeKalb Medical Parkway from Hillandale Drive to the northern entrance of Emory Hillandale Hospital
-
Miller Road Bridge over I-20 will remain closed until approximately September 2025 (click herefor details on the detour)
|
Activity
|
Start Date
|
End Date
|
Times
|
I-20 Westbound
|
-
I-20 from Panola Road to Wesley Chapel Road
|
Single to double, right- or left-lane
and shoulder closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 from Panola Road to Wesley Chapel Road
|
Alternating, single, left- and right-lane and shoulder
closures
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 from Wesley Chapel to Columbia Drive
|
Single to double, left-
lane closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 from Panola Road to the I-285 Interchange, including Wesley Chapel entrance ramp
|
Traffic pacing operation
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 westbound Wesley Chapel Road to Columbia Drive
|
Traffic pacing operation
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
I-20 Eastbound
|
-
I-20 from Wesley Chapel Road to the Panola Road
|
Single, right- lane and shoulder
closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 connecting (CD) lanes from the I-285 Interchange to Wesley Chapel Road
|
Single, right- lane and shoulder
closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 from Columbia Drive to Wesley Chapel
|
Single, right- or
left-lane and closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 from Wesley Chapel Road to Panola Road
|
Single to double, right- or left-lane and shoulder
closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 connecting (CD) lanes from the I-285 Interchange to Wesley Chapel Road
|
Single to double, right- or left-lane and shoulder
closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 Columbia Drive to Wesley Chapel Road
|
Single to double, right- and left-lane
and shoulder closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 From Wesley Chapel Road to Panola Road
|
Traffic shift in
all eastbound lanes
|
April 25
|
May 2
|
9 p.m. - 12 p.m.
|
I-285 Southbound
|
|
|
|
|
-
From Glenwood Road to the I-20 Interchange
|
Single to Double, and right-lane and shoulder closures
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
I-285 Northbound
|
|
|
|
|
-
From Columbia Drive to the I-20 Interchange
|
Single, left- lane and
shoulder closure
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
-
I-20 from Wesley Chapel Road to Panola Road
|
Alternating, single, left- and right-lane and shoulder
closure
|
April 25
|
May 2
|
9 p.m. - 6 a.m.
|
Pacing
|
|
|
|
|
Interchange to Panola Road
|
Traffic pacing operation
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
Flagging
|
|
|
|
|
Miller Road
|
Flagging operation
|
April 25
|
9/2025
|
9 a.m.- 4 p.m.
|
Snapfinger Road under the overpass
|
Flagging operation
|
April 25
|
May 2
|
9 p.m. - 5 a.m.
|
Detour
|
|
|
|
|
Miller Road Bridge
Miller Road Bridge over I-20 will be closed for
approximately 8 months
|
Continuous closure with detour
|
1/7/25
|
9/2025
|
Continuous
|
DeKalb Medical Parkway from Hillandale Road to the northern entrance of Emory Hillandale Hospital
|
Continuous, closure with detour
|
4/25/25
|
4/28/25
|
Continuous
|
|
|
Advisory: Exact time may change due to weather conditions. Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.
|
|
|