Radian Generation LLC

07/07/2026 | Press release | Archived content

Texas Battery Storage Project Completes NERC Registration

Texas Battery Storage Project Completes NERC Registration

Two Milestones, One Timeline: Inside a 100 MW Texas BESS Success Story

Bringing a battery storage facility online is demanding. Doing it while simultaneously satisfying NERC registration requirements raises the stakes considerably.

The Bexar BESS-a 100 MW battery energy storage system developed by Goshe Energy Storage in Bexar County, Texas-achieved both. The project reached ERCOT commercial operation on March 12, then completed NERC Category 1 Generator Owner registration on March 20, clearing the 75 MVA threshold with confidence.

Radian Generation provided the compliance backbone. Working alongside the project owner, EPC, and generator operator.

Get the full story behind the Bexar BESS.

Radian Generation LLC published this content on July 07, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 11, 2026 at 10:45 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]