Georgia Department of Transportation

05/02/2025 | Press release | Distributed by Public on 05/02/2025 19:36

Weekly Lane Closure Advisory on the I-285/I-20 East Interchange Project

Please do not reply to NewsReleases@dot.ga.gov
View this email in your browser
For Immediate Release
May 2, 2025
Contact: mediarequests@dot.ga.gov
DeKalb County...
Lane Closure Advisory for the I-285/I-20 East Interchange Project
What: Weather permitting, the Georgia Department of Transportation (Georgia DOT) construction partners will temporarily close interstate lanes at the locations below for the I-285/I-20 East Interchange project. The project will reconstruct the interstate system-to-system ramps at the I-285/I-20 East Interchange and add a combination of collector-distributor, or connecting lanes, and auxiliary lanes along I-20 east of the interchange and I-285 north of the interchange.
Where/When: Traffic impacts on the I-285/I-20 Interchange project from Friday, May 2, through Friday, May 9, 2025.

DAYTIME CLOSURES:
Friday, May 2, through Friday, May 9, from 9 a.m. to 2 p.m.
  • I-20 Eastbound: Single, right- or left-lane and shoulder closure from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)
  • I-20 Eastbound: Single, right- or left-lane and shoulder closure from Columbia Drive (MM 66.8) to Wesley Chapel Road (MM 69.5)
  • I-20 Eastbound (connecting lanes or CD lanes): Single, right- or left-lane and shoulder closure from I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.5)

Friday, May 2, through Friday, May 9, from 9 a.m. to 4 p.m.
  • Snapfinger Road under I-285 overpass flagging operation

Friday, May 2, through Friday, May 9, from 9 a.m. to 4 p.m.
  • Miller Road between Panola Industrial Boulevard and Chatooga Drive: flagging operations

OVERNIGHT CLOSURES AND TRAFFIC PACING:
Friday, May 2, through Friday, May 9, from 7 p.m. to 5 a.m.
  • I-20 Eastbound: Single to double, right- or left-lane and shoulder closure from Wesley Chapel Road (MM 69.5) to Panola Road (MM 71.3)
  • I-20 Eastbound (connecting lanes or CD lanes): Single to double, right- or left-lane and shoulder closure from I-285 Interchange (MM 67.3) to Wesley Chapel Road (MM 69.5)
  • I-20 Eastbound: Single to double, right- or left-lane and shoulder closure from Columbia Drive (MM 66.8) to Wesley Chapel Road (MM 69.5)

Friday, May 2, through Friday, May 9, from 8 p.m. to 6 a.m.
  • I-285 Southbound: single to double, right-lane and shoulder closures from Glenwood to Interchange
  • I-285 Northbound: Single, left-lane and shoulder closure from Columbia to Interchange

Friday, May 2, through Friday, May 9, from 9 p.m. to 5 a.m.
  • I-20 Westbound: Single to double, right- or left-lane and shoulder closure from Panola Road (MM 71.3) to Wesley Chapel Road (MM 69.5)
  • I-20 Westbound: Single to double, left-lane closure from Wesley Chapel Road (MM 69.5) to Columbia Drive (MM 66.8)

Friday, May 2, through Friday, May 9, from 9 p.m. to 6 a.m.
  • I-20 Westbound: Alternating, single, left- and right-lane and shoulder closure from Panola Road (MM 71.4) to Wesley Chapel Road (MM 68.5)
  • I-20 Eastbound: Alternating, single, left- and right-lane and shoulder closures from Wesley Chapel Road (MM 68.5) to Panola Road (MM 71.4)

Friday, May 2, through Friday, May 9, from 11 p.m. to 5 a.m.
Traffic Pacing Operations:
  • I-20 Westbound from Wesley Chapel Road (Exit 68) to Columbia Drive (Exit 66)
  • I-20 Eastbound & Westbound from I-285 Interchange (MM 67.3) to Panola Road (MM 71.3), including the westbound entrance ramp from Wesley Chapel Road (Exit 68)

CLOSURES AND DETOURS:
  • Miller Road Bridge over I-20 will remain closed until approximately September 2025 (click here for details on the detour)
Activity Start Date End Date Times
I-20 Westbound
  • I-20 from Panola Road to Wesley Chapel Road
Single to double, right- or left-lane and shoulder closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 from Panola Road to Wesley Chapel Road
Alternating, single, left- and right-lane and shoulder closures May 2 May 9 9 p.m. - 5 a.m.
  • I-20 from Wesley Chapel to Columbia Drive
Single to double, left-lane closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 from Panola Road to the I-285 Interchange, including Wesley Chapel entrance ramp
Traffic pacing operation May 2 May 9 9 p.m. - 5 a.m.
  • I-20 westbound Wesley Chapel Road to Columbia Drive
Traffic pacing operation May 2 May 9 9 p.m. - 5 a.m.
I-20 Eastbound
  • I-20 from Wesley Chapel Road to the Panola Road
Single, right-lane and shoulder closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 connecting (CD) lanes from the I-285 Interchange to Wesley Chapel Road
Single, right-lane and shoulder closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 from Columbia Drive to Wesley Chapel
Single, right- or left-lane and closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 from Wesley Chapel Road to Panola Road
Single to double, right-or left-lane and shoulder closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 connecting (CD) lanes from the I-285 Interchange to Wesley Chapel Road
Single to double, right- or left-lane and shoulder closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 Columbia Drive to Wesley Chapel Road
Single to double, right- and left-lane and shoulder closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 From Wesley Chapel Road to Panola Road
Traffic shift in all eastbound lanes May 2 May 9 9 p.m. - 12 p.m.
I-285 Southbound
  • From Glenwood Road to the I-20 Interchange
Single to double, and right-lane and shoulder closures May 2 May 9 9 p.m. - 5 a.m.
I-285 Northbound
  • From Columbia Drive to the I-20 Interchange
Single, left-lane and shoulder closure May 2 May 9 9 p.m. - 5 a.m.
  • I-20 from Wesley Chapel Road to Panola Road
Alternating, single, left- and right-lane and shoulder closure May 2 May 9 9 p.m. - 6 a.m.
Pacing
  • I-20 from the I-285 Interchange to Panola Road
Traffic pacing operation May 2 May 9 9 p.m. - 5 a.m.
Flagging
Miller Road Flagging operation May 2 9/2025 9 a.m.- 4 p.m.
Snapfinger Road under the overpass Flagging operation May 2 May 9 9 p.m. - 5 a.m.
Detour
Miller Road Bridge over I-20 will be closed for approximately 8 months
Continuous closure with detour 1/7/25 9/2025 Continuous
Advisory: Exact time may change due to weather conditions. Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.
Follow Us
Like Us
Visit Us
See Us
Watch Us
The information you provide to the Georgia Department of Transportation will be used solely by GDOT. The Department does not sell or offer a subscriber's personal information to third parties for marketing purposes. To no longer receive this e-news letter, please select "unsubscribe from this list" below.
Copyright © 2025 Georgia Department of Transportation, All rights reserved.

Our mailing address is:
Georgia Department of Transportation
Office of Communications
600 West Peachtree Street N.W.
Atlanta, GA 30308

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list
Georgia Department of Transportation published this content on May 02, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 03, 2025 at 01:37 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at support@pubt.io