Connecticut Department of Transportation

11/24/2026 | Press release | Distributed by Public on 11/24/2026 14:42

Nighttime Bridge Joint Installation on I-95 in Waterford

Nighttime Bridge Joint Installation on I-95 in Waterford

11/24/2026

The Connecticut Department of Transportation (CTDOT) is announcing bridge joint installations will be performed on I-95 north and southbound between Exits 83 and 74 in Waterford. This project is scheduled to occur on Tuesday, December 1 and be completed on Tuesday, December 15, 2026. This project ensures the bridge remains in a state of good repair.

This project is being performed by Dynamic Surface Applications.

LANE CLOSURE/DETOUR INFO

There will be various lane closures on I-95 north and south between Exits 83 and 74 from Tuesday, December 1 to Tuesday, December 15, 2026, from 8:00 p.m. to 5:00 a.m., Monday-Friday. Traffic control signing patterns and Crash Units will guide motorists through the work zone.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.

Media Contact:

Connecticut Department of Transportation published this content on November 24, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 24, 2026 at 20:43 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]