Connecticut Department of Transportation

05/28/2026 | Press release | Distributed by Public on 05/28/2026 14:04

Milling And Resurfacing Route 8 Northbound between Exit 51 Onramps and Offramps in Torrington

Milling And Resurfacing Route 8 Northbound between Exit 51 Onramps and Offramps in Torrington

5/28/2026

The Connecticut Department of Transportation (CTDOT) is announcing that milling and resurfacing will be performed on Route 8 Northbound between the exit 51 on and offramps. This project is scheduled to occur on Sunday June 7, 2026, and be completed on the same night. Project DOT01740468CN consists of milling and resurfacing a 200-foot section of the left and center lanes on Route 8 Northbound.

This project is being performed by Waters Construction.

LANE CLOSURE/DETOUR INFO

There will be a left and center lane closures on Route 8 Northbound between the exit 51 on and offramps on Sunday June 7, 2026. Work is scheduled from 7:00 p.m. to 5:00 a.m. and be completed the same night. Traffic control signing patterns, portable impact attenuation systems and State Police will guide motorists through the work zone.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.

Media Contact:

Connecticut Department of Transportation published this content on May 28, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 28, 2026 at 20:04 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]