Connecticut Department of Transportation

08/13/2026 | Press release | Distributed by Public on 08/13/2026 15:41

Bridge Replacement on Route 2 Over Route 85 in Colchester

Bridge Replacement on Route 2 Over Route 85 in Colchester

8/13/2026

The Connecticut Department of Transportation (CTDOT) is announcing that bridge demolition and replacement will be performed on Route 2 in Colchester. This project is scheduled to occur on August 21, 2026, and be completed on November 30, 2027. The project 0028-0208 consists of rehabilitation of Bridge No. 03395 & Bridge No. 3396 Route 2 over Route 85 in Colchester.

CTDOT Project No. 0028-0208 was awarded to Empire Paving at a cost of $30,922,404.30 on December 21, 2025, and is scheduled to be completed November 30, 2027. This project is administered by the Bureau of Engineering and Construction, Office of Construction, District 2 in Norwich.

LANE CLOSURE/DETOUR INFO

There will be alternating one-way traffic on Route 85 near Route 2 overpass from Friday, August 21, 2026, to Saturday, December 19, 2026. Traffic control signing patterns and temporary traffic signals will guide motorists through the work zone.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.

Media Contact:

Connecticut Department of Transportation published this content on August 13, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on August 13, 2026 at 21:41 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]