A single damaged shipment can stall an AI build. See how protective packaging keeps high-value equipment install-ready and commissioning on time.
AI infrastructure is scaling fast. Global spending on data centers could reach $7 trillion by 2030, which McKinsey calls one of the largest infrastructure buildouts in modern history. Server spending jumped 30.7% in the first quarter of 2026, and the top eight cloud providers alone are projected to spend more than $710 billion this year. As volumes climb and replacement parts stay scarce, a single damaged shipment can stall an entire deployment.
This means getting high-value equipment to site intact and installation-ready, every time, is pivotally important. The ability to do that consistently has a name: deployment readiness.
This article looks at why protective packaging has become a vital factor in deployment readiness, and how OEMs can build a packaging strategy that keeps high-value equipment arriving ready to install.
The OEMs building AI infrastructure are facing three shifts at once. First, demand is outpacing capacity. IDC reports that supply is the primary ceiling for growth, even as order pipelines stay strong. Second, the equipment is more valuable and more delicate than ever. GPUs alone account for 45% of total AI data center investment, and a single populated rack can weigh more than 1,000 pounds and cost millions. Third, replacements are hard to source. Many critical components carry lead times approaching a year, so a unit damaged in transit re-enters an already constrained supply chain and the whole project slips.
Component prices and lead times are largely set by the market. What an OEM can control is whether equipment arrives ready to install, load after load. Damage in transit rarely stops at one crate. It ripples into installation delays, missed commissioning dates and added labor. When a damaged unit needs a long-lead replacement, the delay can stretch for months. That makes landing every shipment intact one of the surest ways to keep commissioning on schedule.
Damage-free, secure shipments depend on matching the right protection to each application. For AI hardware moving from factory to install site, five functions matter most, each accounting for a different threat in transit and staging:
The AI boom is moving fast, and the stakes are high. OEMs need a packaging strategy they can trust: one matched to the products they ship and validated to hold up in transit. Pregis is that partner, bringing a broad portfolio of cushioning, surface protection and on-demand packaging solutions, paired with testing through Pregis IQ® to prove performance before equipment ships. For OEMs racing to bring AI capacity online, that turns packaging from a line item into a safeguard for the entire deployment.
Explore how a validated packaging strategy can protect high-value infrastructure and keep your operation on track. A Pregis packaging consultant can help build a plan around your equipment, your routes and your timelines.