Escambia County, FL

04/02/2026 | Press release | Distributed by Public on 04/02/2026 14:53

Innerarity Point Road Resurfacing Work Begins April 13

Innerarity Point Road between Sorrento Road and Kaiser Lane will experience lane closures beginning Monday, April 13 while crews resurface the roadway.

Traffic on Innerarity Point Road will be diverted through a one-way lane closure during the construction period. Drivers should use extra caution and follow road crew instructions and posted signs when traveling through the work zone. Paving is expected to be completed by Wednesday, May 13, weather permitting.

Residents, pedestrians, local traffic and emergency vehicles will have access to properties within the work area at all times; however, there may be short periods when a driveway or entrance may be blocked temporarily as equipment and materials are moved during construction.

If other roadway closures are necessary or work is delayed, another notice will be issued.

For additional information, please contact Escambia County Engineering at 850-595-3440.<_o3a_p>

Click the map to enlarge

Escambia County, FL published this content on April 02, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on April 02, 2026 at 20:53 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]