Connecticut Department of Transportation

10/31/2025 | Press release | Distributed by Public on 10/31/2025 17:12

CTDOT Is Developing Plans to Improve Drainage Systems Across Connecticut

Press Release Homepage

CTDOT Is Developing Plans to Improve Drainage Systems Across Connecticut

10/31/2025

The Connecticut Department of Transportation is developing plans to improve the quality of the stormwater discharging from the CTDOT drainage systems at sites in Ansonia, Bristol, Killingly, Manchester, Naugatuck, Newington, Stratford, and Trumbull.

The project involves constructing drainage improvements to existing stormwater infrastructure to disconnect impervious areas, reduce stormwater runoff quantity, and improve stormwater runoff quality from suitable CTDOT drainage systems.

The present schedule indicates that the design will be completed in early 2026, with construction anticipated to start in the fall of 2026, assuming acceptance of the project, availability of funding, receipt of any required right-of-way, and environmental permits. This project will be undertaken with one hundred percent (100%) state funds.

It is the CTDOT's policy to keep the public informed and involved when such projects are undertaken. It is important that the community share its concerns with the CTDOT to assist in the project's development. At this time, it is not anticipated that a formal public meeting will be necessary.

Project Locations:

  • Newington | within cloverleaf (Route 15 north of Route 175)
  • Naugatuck | Between Waterbury Road and Route 8 southbound, south of Platts Mill Road
  • Trumbull | Route 8 Mile marker 4.15-4.6
  • Stratford | Retrofit existing dry detention basin south of Route 15, west of Stratford Salt Shed
  • Killingly| I-395 Mile Marker Range 40.40-40.70
  • BristolWithin property of Park and Ride Lot; Route 229 & Sunnydale Avenue
  • Manchester I-384 at Route 534 Exit
  • Manchester I-384 median; west of Gardner Street
  • Stratford | I-95 Mile Marker 32.84 southwest of Bridge 00129 over West Broad St.
  • Ansonia | Route 8 Mile Marker 15.83, south of Bridge 02999

If anyone has any questions or comments on this project, please contact Mr. Nilesh M. Patel, Principal Engineer, at (860) 594-3411 or by email at [email protected]. Please make reference to State Project No.0170-3744.

Media Contact:
OFFICE OF COMMUNICATIONS 860-594-3062 [email protected] Twitter: @CTDOTOfficial Facebook: Connecticut Department of Transportation
Connecticut Department of Transportation published this content on October 31, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on October 31, 2025 at 23:12 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]