Manokotak Power Plant Upgrade Project
This Federal and State funded contract is for the complete renovation of an existing
power plant including building renovation; installation of new owner furnished generators, switchgear, and other equipment; replacement and renovation of various mechanical and electrical systems; repair and expansion of a heat recovery system; and other improvements in the community of Manokotak, Alaska as described herein and shown in the Drawings. The Contractor shall furnish all labor, materials, supervision, equipment, tools, transportation, quality control, and supplies required to complete the work.
A non-mandatory pre-bid meeting is scheduled for March 26, 2026, 10:00 AM.
The pre-bid meeting will be conducted telephonically. Potential bidders may
attend telephonically by calling 1-469-810-0642 and entering the Conference I.D.
215 116 149#. If calling in, please be respectful of other callers and call from a
phone that can be muted so as to cancel out background noise and the possibility
of feedback. Contact the Contract Officer, Selwin C. Ray, at (907) 771-3035 for
more information. This is not a mandatory meeting, and there will not be a
scheduled site visit prior to the bid opening.