12/18/2025 | Press release | Distributed by Public on 12/18/2025 02:27
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 515 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 511 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 516 MWe
Electricity production since the beginning of the year: 14 164 706 MWh.