City of Detroit, MI

04/28/2026 | Press release | Distributed by Public on 04/28/2026 12:50

NOTICE OF PUBLIC OUTREACH - Joe Louis Greenway Woodmere Community meeting April 29

Please join the General Services Department for updates on the design and construction of the Joe Louis Greenway on Woodmere Street. This route was previously selected through a community-led process and will create a biking/walking connection between Fort Street and Vernor Highway.

The design for this 1-mile segment includes an off-street shared use path, road resurfacing, lighting improvements, and street safety interventions. Total costs will be $10.2m and are fully grant funded. Construction is planned for 2027.

El diseño de este tramo es de 1 milla y incluye un camino de uso compartido fuera de la vía pública, repavimentación, mejoras en la iluminación e intervenciones de seguridad vial. El costo total será de $10.2 millones y está financiado íntegramente por subvención. La construcción está prevista para 2027.

Meeting 3 (Online) / Reunión 3 (En línea)
April/Abril 29, 2026
5 - 6 PM
Virtual meeting link: cityofdetroit.zoom.us/j/83726031305

City of Detroit, MI published this content on April 28, 2026, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on April 28, 2026 at 18:50 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]