City of Dublin, CA

07/08/2025 | Press release | Distributed by Public on 07/08/2025 10:25

Trail Maintenance Work to Begin in the Jordan Ranch and Positano Neighborhoods, July 11-16

The Fallon Village GHAD (Geologic Hazard Abatement Districts) has scheduled DRYCO Construction to perform minor maintenance work on the open space asphalt concrete trails within the Positano and Jordan Ranch neighborhoods. The maintenance work generally consists of cleaning out cracks, and filling and sealing them to prevent water from entering the pavement structural section. The work is anticipated to take two days and is scheduled to be performed between Friday, July 11, and Wednesday, July 16.

The trail system runs along each side of the common drainage channel. Public use of the trails will be limited during the scheduled maintenance work. Please obey construction signs. The GHAD appreciates your cooperation.

City of Dublin, CA published this content on July 08, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on July 08, 2025 at 16:26 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at support@pubt.io