Macomb County, MI

05/14/2025 | Press release | Distributed by Public on 05/14/2025 06:22

Macomb County Department of Roads announces pavement preservation projects planned for 2025

Work includes 47 asphalt, concrete and crack sealing projects

MOUNT CLEMENS, Mich. - The Macomb County Department of Roads (MCDR) announced plans for preventative maintenance and repair work as part of the agency's annual asphalt and concrete Pavement Preservation Program (PPP), which includes work on 47 primary and local roadways throughout the county.

"The Department of Roads has an extensive toolbox, uses a full mix of comprehensive maintenance strategies and makes data-driven investments to enhance the quality and longevity of our roadways," said Macomb County Executive Mark A. Hackel. "The Pavement Preservation Program reflects our commitment to delivering cost-effective and sustainable solutions for Macomb County residents and the motoring public."

MCDR invests $8 million annually into the pavement preservation program. PPP uses a mix of preventative maintenance and rehabilitation solutions best suited for each situation including asphalt and concrete repairs, crack sealing, chip sealing and resurfacing measures. The program is 100% funded by MCDR and projects are selected based on data, conditions and community needs.

"With limited road funding available, performing preventative maintenance work on roads that are in good to fair condition is a strategic and cost-effective way to improve and extend the service life of our roadways," said MCDR Director Bryan Santo. "Preserving recently constructed or rehabilitated roadways and identifying and addressing minor issues before they turn into significant concerns reduces the need for reconstruction work and the high costs associated with major projects."

The schedules for individual PPP projects will vary based on location. Projects are typically completed within 30 days of starting and work is weather dependent. During PPP projects, roads will remain open to through traffic with intermittent lane closures during construction and flagging operations to stop traffic when necessary. Motorists should expect delays and are encouraged to seek alternate routes when possible. All PPP projects are expected to be completed by the end of the year.

Below is a list of PPP projects that are planned for 2025.

Project

Location

Type of Work

Community

24 Mile Road

Foster Road to Baker Road

Asphalt preservation and resurfacing

Chesterfield Township

25 Mile Road

Broughton Road to Foss Road

Asphalt preservation and resurfacing

Macomb Township

Armada Ridge Road

West of Russ Road to west of Cryderman Road

Asphalt preservation and resurfacing

Richmond Township

Auburn Road

Ryan Road to Jamestown Road

Asphalt preservation and resurfacing

Shelby Township

Card Road

21 Mile Road to 23 Mile Road

Asphalt preservation and resurfacing

Macomb Township

Egan Street

Carlier Street to Little Mack Avenue

Asphalt preservation and resurfacing

Clinton Township

Elizabeth Road

North of Brywood Court to Groesbeck Highway (M-97)

Asphalt preservation and resurfacing

Clinton Township

Haven Ridge Road

Rambling Lane to 31 Mile Road

Asphalt preservation and resurfacing

Lenox Township

Kerry Street

Groesbeck Highway (M-97) to Egan Street

Asphalt preservation and resurfacing

Clinton Township

McKay Road

33 Mile Road to 34 Mile Road

Asphalt preservation and resurfacing

Bruce Township

Sass Road

23 Mile Road to 24 Mile Road

Asphalt preservation and resurfacing

Chesterfield Township

Millstone Drive

Fox Elementary School to Romeo Plank Road

Concrete pavement repair

Macomb Township

Riverwoods Drive

Hall Road (M-59) to Winthrop Place

Concrete pavement repair

Macomb Township

Hillsboro Drive

Heydenreich Road to Windemere Drive

Concrete pavement repair

Macomb Township

Terra Bella Street

Huron Elementary School to Garfield Road

Concrete pavement repair

Clinton Township

Copperwood Drive

Entrance

Concrete pavement repair

Washington Township

Van Dyke Avenue Ramp

Van Dyke Avenue to A Avenue

Concrete pavement repair

Washington Township

Metropolitan Parkway and Crocker Boulevard

Intersection

Concrete pavement repair

Harrison Township

Metropolitan Parkway and Jefferson Avenue

Intersection

Concrete pavement repair

Harrison Township

Chesterfield Road

52000 Chesterfield Road to 24 Mile Road

Concrete pavement repair

Chesterfield Township

Schoenherr Road

At Harold Street

Concrete pavement repair

Warren

Kingscross Drive

Dequindre Road to Scarboro Way

Concrete pavement repair

Shelby Township

26 Mile Road and Scotland Boulevard

Deceleration lane

Concrete pavement repair

Shelby Township

26 Mile Road and Aberdeen Drive

Deceleration lane

Concrete pavement repair

Shelby Township

Kelly Court

Cul-de-sac

Concrete pavement repair

Shelby Township

Quinn Road

Gratiot Avenue (M-3) to Harper Avenue

Crack seal

Clinton Township

Harrington Street

Moravian Drive to Groesbeck Highway (M-97)

Crack seal

Clinton Township

Greenfield Road

Canal Road to Romeo Plank Road

Crack seal

Clinton Township

Garfield Road

17 Mile Road to 19 Mile Road

Crack seal

Clinton Township

Armada Ridge Road

Hicks Road to the Village of Armada limits

Crack seal

Armada Township

Sugarbush Road

21 Mile Road to Cotton Road

Crack seal

Chesterfield Township

Sugarbush Road

North of Rachid Lane to north of Sugar Creek Drive

Crack seal

Chesterfield Township

Callens Road

Sass Road to Kiely Drive

Crack seal

Chesterfield Township

Haven Ridge Road

New Haven Village limits to Rambling Lane

Crack seal

Lenox Township

Haven Ridge Road

31 Mile Road to 32 Mile Road

Crack seal

Lenox Township

Hayes Road

18 Mile Road to Hall Road (M-59)

Crack seal

Clinton Township and Sterling Heights

22 Mile Road

Ryan Road to Hayes Road

Crack seal

Shelby Township

21 Mile Road

Shelby Road to Garfield Road

Crack seal

Shelby Township and Macomb Township

26 Mile Road

20200 26 Mile Road to 1500' east of Broughton Road

Crack seal

Macomb Township and Ray Township

27 Mile Road

Romeo Plank Road to 2300' east of Kunstman Road

Crack seal

Ray Township

32 Mile Road

Powell Road to 1300' west of Romeo Plank Road

Crack seal

Armada Township and Ray Township

32 Mile Road

Wolcott Road to 300' east of Hicks Road

Crack seal

Armada Township and Ray Township

Armada Center Road

Capac Road to Omo Road

Crack seal

Armada Township and Village of Armada

McVicar Road

East Gates Street to 33 Mile Road

Crack seal

Bruce Township

Wolcott Road

29 Mile Road to Indian Trail

Crack seal

Ray Township

Utica Road

Van Dyke Avenue to Hayes Road

Crack seal

Sterling Heights

25 Mile Road

Hayes Road to Romeo Plank Road east of roundabout

Crack seal

Macomb Township

To help road users navigate Macomb County construction work, the public can subscribe to the Macomb Work Zone - a weekly email from MCDR to keep motorists informed and up to date of what's happening on the roadways. The public can also sign up to receive email and text alerts for real-time constructionand trafficupdates at macombgov.org/roads.

For a complete list of Macomb County pavement preservation and construction projects, locationsand information, visit macombgov.org/macombworkzone.

Photos of Macomb County construction work are available online.

Media Contact
Eric Dimoff
586-840-1759
edimoff@rcmcweb.org

Department:Department of Roads
Type:
Press Release
Category:
Announcements
Macomb County, MI published this content on May 14, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on May 14, 2025 at 12:22 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at support@pubt.io