City of West Chicago, IL

09/11/2025 | Press release | Distributed by Public on 09/11/2025 18:07

Construction to Begin on Garys Mill Road Starting September 15

[Link]

The Illinois Department of Transportation (IDOT) has announced that resurfacing of Garys Mill Road, from Neltnor Boulevard (Illinois 59) to Roosevelt Road (Illinois 38) in West Chicago, will begin Monday, September 15, 2025, weather permitting. The project will require intermittent daytime lane closures throughout construction.

Project Scope

The project, administered by IDOT District 1, includes:

  • Removal and replacement of the hot-mix asphalt surface

  • Spot curb and gutter removal and replacement

  • Drainage structure adjustments

  • Construction of new ADA-compliant sidewalk ramps

  • Placement of thermoplastic pavement markings

The work will be performed by R.W. Dunteman Company of Addison, IL.

Timeline and Access

Construction is expected to be completed by December 2025, weather permitting. Access to residences and businesses within the work zone will be maintained at all times.

Travel Impacts

Motorists traveling along Garys Mill Road should expect delays and are encouraged to use alternate routes when possible. Drivers should allow extra travel time and are urged to:

  • Pay close attention to flaggers and posted signs in the work zone

  • Obey the posted speed limits

  • Remain alert for workers and construction equipment

For further information, residents and property owners may contact IDOT District 1 at (847) 705-4600.

City of West Chicago, IL published this content on September 11, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on September 12, 2025 at 00:07 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]