08/27/2026 | Press release | Distributed by Public on 08/28/2026 13:44
Longmont - In order to safely build the new southwest bound bridge on Colorado Highway 119 at Hover Street in Longmont, all left turns at the intersection will be closed in early September and remain closed until the project is complete next year.
The right turn from southbound Hover Street to CO 119 will also be closed. All of the closures will give the construction team safe space to build the new bridge for vehicles.
"Building a bridge in the middle of the busiest intersection in Longmont while also maintaining all business access isn't going to be easy," said Colorado Department of Transportation Regional Transportation Director Heather Paddock. "But by closing some turns and everyone planning their trips thoughtfully, construction will be completed quicker, construction for workers and the public will be safer and it will reduce overall impacts to businesses and the travelling public."
The basic concept of building a bridge to go over Hover Street for Boulder-bound traffic will make it more efficient for traffic as there will be one entire sequence of traffic lights that won't be needed, increasing green light time for everyone. Additionally, grade separating will improve safety and reduce traffic and pedestrian conflicts. CDOT previously released a video about what and why this is happening and you can watch it on YouTube.
All businesses will maintain access throughout construction.
The only access that will be closed until the project is complete is a right-in access to PNC Bank. The bank and other businesses nearby are still accessible from the many other entries from CO 119 and Hover Street to the mall area.
In early July, prep work began at the intersection with the removal of one of the left turn lanes from CO 119 to Hover Street and placement of some temporary signals and temporary pavement for the upcoming traffic shift. As soon as the beginning of September, things are going to be changing and staying that way for about a year.
To allow the construction team to have room to build the bridge and all the other pieces that will tie-in to it, drivers will no longer be able to left at the Colorado 119 and Hover intersection. Most of the right turns will still be open. Through-traffic will proceed as it does today.
Here are a few ways to get around without making those turns (you can also watch a short video on the detours)
This is the one right turn from southbound Hover Street to CO 119 that will be closed for the next year. But you have some choices:
Travelers are urged to "know before you go." Gather information about weather forecasts and anticipated travel impacts and current road conditions prior to hitting the road. CDOT resources include:
The following tips are to help you stay safe while traveling through maintenance and construction work zones.
The new free COtrip Planner mobile app was designed to meet the growing trend of information on mobile and tablet devices for the traveling public. The COtrip Planner app provides statewide, real-time traffic information, and works on mobile devices that operate on the iOS and Android platforms. Visit the Google Play Store (Android devices) or the Apple Store (iOS devices) to download!