Connecticut Department of Transportation

11/13/2025 | Press release | Distributed by Public on 11/13/2025 15:35

Bridge Repairs on Route 15 Between Exits 51 and 46 in Hamden

Press Release Homepage

Bridge Repairs on Route 15 Between Exits 51 and 46 in Hamden

11/13/2025

The Connecticut Department of Transportation (CTDOT) is announcing bridge work will be performed on Route 15 (Merritt Parkway) north and southbound between Exit 51 and 46 in Hamden. This project is scheduled to occur on Sunday, November 16, and be completed on Friday, December 19, 2025. This project ensures the bridges remains in a state of good repair.

This project is being performed by Dynamic Surface Application LTD.

LANE CLOSURE/DETOUR INFO

There will be lanes closures on Route 15 (Merritt Parkway) north and southbound between Exits 51 and 46 in Hamden from Sunday, November 16, 2025, to Friday December 19, 2025, from 8:00 p.m. to 6:00 a.m. Traffic control signing patterns, State Troopers, and Crash Units will guide motorists through the work zone.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.

Media Contact:
860-594-2560 [email protected] Operating Hours: Monday - Friday 8:00 a.m. to 4:30 p.m.
Connecticut Department of Transportation published this content on November 13, 2025, and is solely responsible for the information contained herein. Distributed via Public Technologies (PUBT), unedited and unaltered, on November 13, 2025 at 21:35 UTC. If you believe the information included in the content is inaccurate or outdated and requires editing or removal, please contact us at [email protected]